Outdoor Enterprise LLC: ODOT bid record
Outdoor Enterprise LLC submitted 15 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 11 MAY 2023, and was the low bidder on 3 of them (20%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,717,445
- Latest bid
- 11 MAY 2023
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 1 | 25% |
| 2021 | 5 | 1 | 20% |
| 2022 | 5 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MOT | 4 | 2 | 50% |
| MIA | 3 | 1 | 33% |
| DAR | 2 | 0 | 0% |
| CLA | 2 | 0 | 0% |
| GRE | 1 | 0 | 0% |
| BUT | 1 | 0 | 0% |
| CHP | 1 | 0 | 0% |
| PRE | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 14 | 14 (100%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 13 | 11 (85%) | $1.00 | $3.00 |
| Proof rolling | 204E45000 | HR | 8 | 5 (63%) | $110.00 | $219.05 |
| Pipe removed, 24" and under | 202E35100 | FT | 9 | 4 (44%) | $18.00 | $20.00 |
| Aggregate base | 304E20000 | CY | 13 | 3 (23%) | $80.00 | $90.00 |
| Commercial fertilizer | 659E20000 | TON | 12 | 3 (25%) | $800.00 | $850.00 |
| Water | 659E35000 | MGAL | 11 | 3 (27%) | $50.00 | $1.00 |
| Water | 616E10000 | MGAL | 6 | 3 (50%) | $30.00 | $20.00 |
| Field office, type B | 619E16010 | MNTH | 5 | 3 (60%) | $800.00 | $2,000.00 |
| Excavation | 203E10000 | CY | 13 | 2 (15%) | $28.00 | $27.00 |
| Embankment | 203E20000 | CY | 10 | 2 (20%) | $22.50 | $25.00 |
| Topsoil | 659E00300 | CY | 10 | 2 (20%) | $59.50 | $45.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Brumbaugh Construction Inc | 11 | 7 of 11 |
| Barrett Paving Materials Inc | 7 | 4 of 7 |
| John R Jurgensen Company | 7 | 2 of 7 |
| Eclipse Co LLC | 5 | 0 of 5 |
| Eagle Bridge Co | 4 | 3 of 4 |
| Double Jay Construction Inc | 4 | 2 of 4 |
| Sunesis Construction Co | 4 | 0 of 4 |
| Complete General Construction Company | 4 | 2 of 4 |
| L J Deweese Co Inc | 3 | 2 of 3 |
| R B Jergens Contractors Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 MAY 2023 | 230295 | MOT | MOT-Webster St Ramp Connector (BIKEWAYS) | 1 of 4 | $249,565 | Low, 4.0% under the second |
| 03 NOV 2022 | 220592 | CLA | CLA-Geo Rogers Clark Pk Lower Br (CULVERT REPLACEMENT) | 7 of 8 | $250,558 | +28% |
| 28 APR 2022 | 220281 | PRE | PRE-Geeding St Bridge Replacemnt (CULVERT REPLACEMENT) | 2 of 3 | $390,269 | +12% |
| 10 MAR 2022 | 220134 | DAR | DAR-US 36/SR 121-08.35/12.65 (INTERSECTION) | 2 of 2 | $1,867,647 | +8.0% |
| 17 FEB 2022 | 220104 | MIA | MIA-High Street Improvements (MINOR RECONSTRUCTION) | 2 of 4 | $3,831,665 | +6.0% |
| 13 JAN 2022 | 220020 | MOT | MOT-Brookville SRTS IFS 1 (MISCELLANEOUS) | 6 of 7 | $361,533 | +22% |
| 16 DEC 2021 | 210680 | CHP | CHP-ODNR Kiser Lake State Park (CULVERT REPLACEMENT) | 2 of 5 | $51,562 | +15% |
| 29 APR 2021 | 210273 | MIA | MIA-CR 25A-03.54 (MINOR WIDENING) | 3 of 6 | $1,416,506 | +4.0% |
| 15 APR 2021 | 210225 | CLA | CLA-SR 41-12.04 (INTERSECTION) | 2 of 3 | $737,366 | +4.0% |
| 01 APR 2021 | 210206 | MOT | MOT-US 35-07.21/08.01 (CULVERT REPLACEMENT) | 1 of 5 | $176,446 | Low, 5.0% under the second |
| 28 JAN 2021 | 210068 | MOT | MOT-Dayton-PSIP-FY2021 (INTERSECTION) | 3 of 4 | $778,610 | +26% |
| 01 OCT 2020 | 200477 | MIA | MIA-SR 571-15.03 (MISCELLANEOUS) | 1 of 6 | $1,291,434 | Low, 0.0% under the second |
| 21 MAY 2020 | 200303 | DAR | DAR-Holzapfel Preserve (MISCELLANEOUS) | 3 of 3 | $28,246 | +5.0% |
| 23 APR 2020 | 200225 | BUT | BUT-/WAR GMR Trail Extension (BIKEWAYS) | 9 of 12 | $2,833,073 | +20% |
| 27 FEB 2020 | 200099 | GRE | GRE-SR 444-04.60 (MINOR RECONSTRUCTION) | 4 of 8 | $1,468,387 | +1.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.