Double Jay Construction Inc: ODOT bid record

Double Jay Construction Inc submitted 16 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 01 OCT 2026, and was the low bidder on 5 of them (31%). When it was not low, its total sat a median +10% above the low bid.

Owner
Ohio DOT
Low bid volume
$4,563,678
Latest bid
01 OCT 2026
Data through
12 NOV 2026
16Bids
5Low bids
31Win rate, percent
+10%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2020400%
20213133%
202211100%
202311100%
20253133%
20264125%
Double Jay Construction Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
MOT7229%
PRE5360%
MIA200%
GRE100%
AUG100%
Double Jay Construction Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1515 (100%)$1.00$1.00
12" conduit, type B611E04400FT106 (60%)$67.00$98.00
Excavation of subgrade204E13000CY96 (67%)$18.80$27.00
Aggregate base304E20000CY135 (38%)$59.30$90.00
Excavation203E10000CY125 (42%)$20.55$27.00
Walk removed202E30000SF125 (42%)$1.42$4.00
Conduit, jacked or drilled, 725.052, as per plan625E25909FT95 (56%)$23.00$45.00
Manhole adjusted to grade611E99654EACH85 (63%)$438.50$950.00
Subgrade compaction204E10000SY134 (31%)$1.95$3.00
Repair seeding and mulching659E14000SY123 (25%)$1.45$1.25
Ground rod625E32000EACH83 (38%)$198.00$285.00
Curb ramp608E52000SF63 (50%)$15.05$22.00
Double Jay Construction Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Double Jay Construction Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260430MOTMOT-GMR Trail IMP CR22B (BIKEWAYS)5 of 8$1,814,568+10%
23 APR 2026260209MOTMOT-MCD South River Walk (MISCELLANEOUS)1 of 2$561,768Low, 20% under the second
19 FEB 2026260090MOTMOT-Trotwood Olive Rd Walks SA22 (SPOT SAFETY)3 of 5$943,828+14%
29 JAN 2026260066PREPRE-MR 112-00.99 N Maple Ph 2 (MINOR RECONSTRUCTION)2 of 6$2,526,468+4.0%
18 DEC 2025250592MIAMIA-SR 571-IMP 06.38 (BIKEWAYS)5 of 7$1,849,541+24%
10 APR 2025250197PREPRE-SR 725-13.60 (CULVERT REPLACEMENT)1 of 6$931,294Low, 4.0% under the second
30 JAN 2025250060MOTMOT-Woodman Dr Reconstruction (MINOR RECONSTRUCTION)6 of 7$5,921,348+25%
14 DEC 2023230603PREPRE-MR 112-01.316 N. Maple St. (MINOR RECONSTRUCTION)1 of 7$2,648,838Low, 11% under the second
13 JAN 2022220020MOTMOT-Brookville SRTS IFS 1 (MISCELLANEOUS)1 of 7$295,800Low, 6.0% under the second
01 APR 2021210210PREPRE-Eaton SRTS FY 21 (SIDEWALK)1 of 2$125,978Low, 9.0% under the second
28 JAN 2021210068MOTMOT-Dayton-PSIP-FY2021 (INTERSECTION)2 of 4$643,978+4.0%
14 JAN 2021210032PREPRE-SR 177 -00.70 (INTERSECTION)3 of 7$667,818+12%
17 DEC 2020200575MOTMOT-E Springfield St Improvement (MINOR RECONSTRUCTION)2 of 5$3,722,378+2.0%
01 OCT 2020200477MIAMIA-SR 571-15.03 (MISCELLANEOUS)2 of 6$1,296,7280.0%
04 JUN 2020200263AUGAUG-SRTS Wapak IFS 3B Carnation (SIDEWALK)2 of 2$236,428+23%
27 FEB 2020200099GREGRE-SR 444-04.60 (MINOR RECONSTRUCTION)5 of 8$1,475,518+1.0%
Double Jay Construction Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy