Double Jay Construction Inc: ODOT bid record
Double Jay Construction Inc submitted 16 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 01 OCT 2026, and was the low bidder on 5 of them (31%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $4,563,678
- Latest bid
- 01 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2022 | 1 | 1 | 100% |
| 2023 | 1 | 1 | 100% |
| 2025 | 3 | 1 | 33% |
| 2026 | 4 | 1 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MOT | 7 | 2 | 29% |
| PRE | 5 | 3 | 60% |
| MIA | 2 | 0 | 0% |
| GRE | 1 | 0 | 0% |
| AUG | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 15 | 15 (100%) | $1.00 | $1.00 |
| 12" conduit, type B | 611E04400 | FT | 10 | 6 (60%) | $67.00 | $98.00 |
| Excavation of subgrade | 204E13000 | CY | 9 | 6 (67%) | $18.80 | $27.00 |
| Aggregate base | 304E20000 | CY | 13 | 5 (38%) | $59.30 | $90.00 |
| Excavation | 203E10000 | CY | 12 | 5 (42%) | $20.55 | $27.00 |
| Walk removed | 202E30000 | SF | 12 | 5 (42%) | $1.42 | $4.00 |
| Conduit, jacked or drilled, 725.052, as per plan | 625E25909 | FT | 9 | 5 (56%) | $23.00 | $45.00 |
| Manhole adjusted to grade | 611E99654 | EACH | 8 | 5 (63%) | $438.50 | $950.00 |
| Subgrade compaction | 204E10000 | SY | 13 | 4 (31%) | $1.95 | $3.00 |
| Repair seeding and mulching | 659E14000 | SY | 12 | 3 (25%) | $1.45 | $1.25 |
| Ground rod | 625E32000 | EACH | 8 | 3 (38%) | $198.00 | $285.00 |
| Curb ramp | 608E52000 | SF | 6 | 3 (50%) | $15.05 | $22.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Brumbaugh Construction Inc | 11 | 4 of 11 |
| Barrett Paving Materials Inc | 9 | 2 of 9 |
| Complete General Construction Company | 8 | 1 of 8 |
| Sunesis Construction Co | 7 | 2 of 7 |
| John R Jurgensen Company | 7 | 1 of 7 |
| Eagle Bridge Co | 5 | 5 of 5 |
| R B Jergens Contractors Inc | 5 | 3 of 5 |
| Outdoor Enterprise LLC | 4 | 2 of 4 |
| Eclipse Co LLC | 3 | 0 of 3 |
| Milcon Concrete Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | 260430 | MOT | MOT-GMR Trail IMP CR22B (BIKEWAYS) | 5 of 8 | $1,814,568 | +10% |
| 23 APR 2026 | 260209 | MOT | MOT-MCD South River Walk (MISCELLANEOUS) | 1 of 2 | $561,768 | Low, 20% under the second |
| 19 FEB 2026 | 260090 | MOT | MOT-Trotwood Olive Rd Walks SA22 (SPOT SAFETY) | 3 of 5 | $943,828 | +14% |
| 29 JAN 2026 | 260066 | PRE | PRE-MR 112-00.99 N Maple Ph 2 (MINOR RECONSTRUCTION) | 2 of 6 | $2,526,468 | +4.0% |
| 18 DEC 2025 | 250592 | MIA | MIA-SR 571-IMP 06.38 (BIKEWAYS) | 5 of 7 | $1,849,541 | +24% |
| 10 APR 2025 | 250197 | PRE | PRE-SR 725-13.60 (CULVERT REPLACEMENT) | 1 of 6 | $931,294 | Low, 4.0% under the second |
| 30 JAN 2025 | 250060 | MOT | MOT-Woodman Dr Reconstruction (MINOR RECONSTRUCTION) | 6 of 7 | $5,921,348 | +25% |
| 14 DEC 2023 | 230603 | PRE | PRE-MR 112-01.316 N. Maple St. (MINOR RECONSTRUCTION) | 1 of 7 | $2,648,838 | Low, 11% under the second |
| 13 JAN 2022 | 220020 | MOT | MOT-Brookville SRTS IFS 1 (MISCELLANEOUS) | 1 of 7 | $295,800 | Low, 6.0% under the second |
| 01 APR 2021 | 210210 | PRE | PRE-Eaton SRTS FY 21 (SIDEWALK) | 1 of 2 | $125,978 | Low, 9.0% under the second |
| 28 JAN 2021 | 210068 | MOT | MOT-Dayton-PSIP-FY2021 (INTERSECTION) | 2 of 4 | $643,978 | +4.0% |
| 14 JAN 2021 | 210032 | PRE | PRE-SR 177 -00.70 (INTERSECTION) | 3 of 7 | $667,818 | +12% |
| 17 DEC 2020 | 200575 | MOT | MOT-E Springfield St Improvement (MINOR RECONSTRUCTION) | 2 of 5 | $3,722,378 | +2.0% |
| 01 OCT 2020 | 200477 | MIA | MIA-SR 571-15.03 (MISCELLANEOUS) | 2 of 6 | $1,296,728 | 0.0% |
| 04 JUN 2020 | 200263 | AUG | AUG-SRTS Wapak IFS 3B Carnation (SIDEWALK) | 2 of 2 | $236,428 | +23% |
| 27 FEB 2020 | 200099 | GRE | GRE-SR 444-04.60 (MINOR RECONSTRUCTION) | 5 of 8 | $1,475,518 | +1.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.