ODOT contract 260209 bid tabulation

MOT-MCD South River Walk (MISCELLANEOUS). Let by Ohio DOT on April 23, 2026, MOT. 2 bids received; low bid $561,768 by Double Jay Construction Inc, +3.1% against the engineer's estimate of $545,000.

Owner
Ohio DOT
Letting
23 APR 2026
Pay items
38
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Double Jay Construction Inc$561,768Low+3.0%
2Complete General Construction Company$675,186+20%+24%
ODOT contract 260209: bids by rank

Engineer's estimate: $545,000.

Bid tabulation

LinePay itemUnitQuantity1. Double Jay Construction Inc2. Complete General Construction Company
1Structure removed, as per plan (202E11001)LS1$5,826.00$2,000.00
2Walk removed, as per plan (202E30001)SF186$2.75$38.00
3Excavation, as per plan (203E10001)CY362$131.20$56.00
4Embankment, as per plan (203E20001)CY66$90.10$28.00
5Roadway, misc.:4" crushed limestone, as per plan (203E98000)CY362$202.65$160.00
6Roadway, misc.:bench (203E98600)EACH9$3,017.00$3,700.00
7Roadway, misc.:dog waste station (203E98600)EACH4$893.00$1,800.00
8Roadway, misc.:swing (203E98600)EACH4$15,542$36,000
9Subgrade compaction (204E10000)SY3,275$2.55$5.00
106" concrete walk, as per plan (608E13001)SF286$20.50$38.00
118" concrete walk, as per plan (608E15001)SF226$26.95$43.00
12Special - picnic table and slabspecial: picnic tab (680E14000)EACH2$3,786.00$4,800.00
13Special - trash receptacle (680E14550)EACH7$3,537.00$3,900.00
14Topsoil furnished and placed, as per plan (653E10001)CY17$89.00$130.00
15Seeding and mulching, as per plan (659E10001)SY74$15.80$37.50
16Commercial fertilizer (659E20000)TON0.02$2,300.00$3,000.00
17Connection, fused pull apart (625E00450)EACH25$160.00$225.00
18Light pole, conventional, as per plan 16' (625E10491)EACH23$2,945.00$2,400.00
19Light pole anchor bolts on structure, as per plan (625E10615)EACH92$69.00$125.00
20No. 6 AWG 2400 volt distribution cable (625E23302)FT9,628$3.45$3.00
21No. 8 AWG 600 volt distribution cable (625E23304)FT2,445$3.20$2.00
22No. 12 AWG pole and bracket cable (625E23410)FT368$1.15$1.75
23Conduit, 4", 725.051 (625E25604)FT210$10.30$52.00
24Luminaire, decorative, as per plan dark sky (625E27551)EACH23$2,565.00$2,350.00
25Pull box, misc.: 725.12, size 14"X14"X12" (625E31600)EACH21$468.00$1,000.00
26Ground rod (625E32000)EACH21$137.00$200.00
27Control center cabinet, complete, as per plan (625E34451)EACH1$9,291.00$20,000
28Light pole removed, as per plan (625E75401)EACH45$228.00$500.00
29Light pole foundation removed, as per plan (625E75501)EACH15$456.00$750.00
30Luminaire removed, as per plan (625E75507)EACH45$92.00$50.00
31Power service removed, as per plan (625E75511)EACH2$912.00$1,350.00
32Distribution cable removed (625E75550)FT3,059$1.15$1.00
33Detour signing, as per plan (614E12421)LS1$1,722.00$8,500.00
34Premium for contract performance bond and for payment bond (103E05000)LS1$4,720.00$3,000.00
35Maintaining traffic, as per plan (614E11001)LS1$19,150$6,000.00
36Construction layout stakes and surveying (623E10000)LS1$9,120.00$10,500
37Mobilization (624E10000)LS1$15,378$35,000
100Erosion control (832E30000)EACH1,000$1.00$1.00
ODOT contract 260209: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy