ODOT contract 260209 bid tabulation
MOT-MCD South River Walk (MISCELLANEOUS). Let by Ohio DOT on April 23, 2026, MOT. 2 bids received; low bid $561,768 by Double Jay Construction Inc, +3.1% against the engineer's estimate of $545,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 38
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Double Jay Construction Inc | $561,768 | Low | +3.0% |
| 2 | Complete General Construction Company | $675,186 | +20% | +24% |
Engineer's estimate: $545,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Double Jay Construction Inc | 2. Complete General Construction Company |
|---|---|---|---|---|---|
| 1 | Structure removed, as per plan (202E11001) | LS | 1 | $5,826.00 | $2,000.00 |
| 2 | Walk removed, as per plan (202E30001) | SF | 186 | $2.75 | $38.00 |
| 3 | Excavation, as per plan (203E10001) | CY | 362 | $131.20 | $56.00 |
| 4 | Embankment, as per plan (203E20001) | CY | 66 | $90.10 | $28.00 |
| 5 | Roadway, misc.:4" crushed limestone, as per plan (203E98000) | CY | 362 | $202.65 | $160.00 |
| 6 | Roadway, misc.:bench (203E98600) | EACH | 9 | $3,017.00 | $3,700.00 |
| 7 | Roadway, misc.:dog waste station (203E98600) | EACH | 4 | $893.00 | $1,800.00 |
| 8 | Roadway, misc.:swing (203E98600) | EACH | 4 | $15,542 | $36,000 |
| 9 | Subgrade compaction (204E10000) | SY | 3,275 | $2.55 | $5.00 |
| 10 | 6" concrete walk, as per plan (608E13001) | SF | 286 | $20.50 | $38.00 |
| 11 | 8" concrete walk, as per plan (608E15001) | SF | 226 | $26.95 | $43.00 |
| 12 | Special - picnic table and slabspecial: picnic tab (680E14000) | EACH | 2 | $3,786.00 | $4,800.00 |
| 13 | Special - trash receptacle (680E14550) | EACH | 7 | $3,537.00 | $3,900.00 |
| 14 | Topsoil furnished and placed, as per plan (653E10001) | CY | 17 | $89.00 | $130.00 |
| 15 | Seeding and mulching, as per plan (659E10001) | SY | 74 | $15.80 | $37.50 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.02 | $2,300.00 | $3,000.00 |
| 17 | Connection, fused pull apart (625E00450) | EACH | 25 | $160.00 | $225.00 |
| 18 | Light pole, conventional, as per plan 16' (625E10491) | EACH | 23 | $2,945.00 | $2,400.00 |
| 19 | Light pole anchor bolts on structure, as per plan (625E10615) | EACH | 92 | $69.00 | $125.00 |
| 20 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 9,628 | $3.45 | $3.00 |
| 21 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 2,445 | $3.20 | $2.00 |
| 22 | No. 12 AWG pole and bracket cable (625E23410) | FT | 368 | $1.15 | $1.75 |
| 23 | Conduit, 4", 725.051 (625E25604) | FT | 210 | $10.30 | $52.00 |
| 24 | Luminaire, decorative, as per plan dark sky (625E27551) | EACH | 23 | $2,565.00 | $2,350.00 |
| 25 | Pull box, misc.: 725.12, size 14"X14"X12" (625E31600) | EACH | 21 | $468.00 | $1,000.00 |
| 26 | Ground rod (625E32000) | EACH | 21 | $137.00 | $200.00 |
| 27 | Control center cabinet, complete, as per plan (625E34451) | EACH | 1 | $9,291.00 | $20,000 |
| 28 | Light pole removed, as per plan (625E75401) | EACH | 45 | $228.00 | $500.00 |
| 29 | Light pole foundation removed, as per plan (625E75501) | EACH | 15 | $456.00 | $750.00 |
| 30 | Luminaire removed, as per plan (625E75507) | EACH | 45 | $92.00 | $50.00 |
| 31 | Power service removed, as per plan (625E75511) | EACH | 2 | $912.00 | $1,350.00 |
| 32 | Distribution cable removed (625E75550) | FT | 3,059 | $1.15 | $1.00 |
| 33 | Detour signing, as per plan (614E12421) | LS | 1 | $1,722.00 | $8,500.00 |
| 34 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,720.00 | $3,000.00 |
| 35 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $19,150 | $6,000.00 |
| 36 | Construction layout stakes and surveying (623E10000) | LS | 1 | $9,120.00 | $10,500 |
| 37 | Mobilization (624E10000) | LS | 1 | $15,378 | $35,000 |
| 100 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.