ODOT contract 260430 bid tabulation

MOT-GMR Trail IMP CR22B (BIKEWAYS). Let by Ohio DOT on October 1, 2026, MOT. 8 bids received; low bid $1,642,320 by R B Jergens Contractors Inc, -7.8% against the engineer's estimate of $1,781,000.

Owner
Ohio DOT
Letting
01 OCT 2026
Pay items
90
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1R B Jergens Contractors Inc$1,642,320Low-8.0%
2Eagle Bridge Co$1,697,752+3.0%-5.0%
3Integrity Contractors LLC$1,767,639+8.0%-1.0%
4Milcon Concrete Inc$1,816,612+11%+2.0%
5Double Jay Construction Inc$1,814,568+10%+2.0%
6Barrett Paving Materials Inc$1,820,137+11%+2.0%
7Brumbaugh Construction Inc$1,842,662+12%+3.0%
8Sunesis Construction Co$1,950,697+19%+10%
ODOT contract 260430: bids by rank

Engineer's estimate: $1,781,000.

Bid tabulation

LinePay itemUnitQuantity1. R B Jergens Contractors Inc2. Eagle Bridge Co3. Integrity Contractors LLC4. Milcon Concrete Inc5. Double Jay Construction Inc6. Barrett Paving Materials Inc
1Clearing and grubbing (201E11000)LS1$5,759.40$7,500.00$19,450$4,750.00$7,175.00$6,000.00
2Pavement removed (202E23000)SY10,182$7.76$7.00$15.74$6.50$9.30$9.50
3Walk removed (202E30000)SF668$3.35$3.50$3.20$1.75$2.30$2.00
4Curb removed (202E32000)FT36$12.13$15.00$28.10$13.50$18.45$28.00
5Pipe removed, 24" and under (202E35100)FT86$45.30$15.00$18.29$26.00$33.30$40.00
6Guardrail removed (202E38000)FT77$20.77$13.00$30.31$14.50$12.50$13.00
7Catch basin removed (202E58100)EACH5$508.19$400.00$1,125.91$898.00$581.00$550.00
8Excavation (203E10000)CY1,204$22.84$28.00$21.83$30.50$22.90$20.00
9Embankment (203E20000)CY1,873$17.79$25.00$27.38$24.50$24.80$30.00
10Subgrade compaction (204E10000)SY13,665$2.94$2.50$3.40$2.00$1.80$2.05
11Excavation of subgrade (204E13000)CY50$39.08$20.00$64.24$70.50$24.30$80.00
12Granular material, type C (204E30020)CY50$62.72$50.00$81.96$106.00$61.90$100.00
13Proof rolling (204E45000)HR7$325.18$200.00$324.72$375.00$254.00$250.00
14Geotextile fabric (204E50000)SY20$46.94$3.00$119.95$5.60$18.75$13.00
15Guardrail, type MGS (606E15050)FT50$103.45$45.00$52.80$50.00$111.00$100.00
16Anchor assembly, MGS type E (606E26150)EACH1$3,103.47$2,850.00$3,372.73$3,180.00$3,330.00$3,000.00
17Anchor assembly, type T (606E26500)EACH1$1,551.73$1,500.00$1,774.84$1,675.00$1,665.00$1,500.00
184" concrete walk (608E10000)SF97$11.42$13.00$13.71$13.00$12.60$12.50
194" concrete walk, as per plan (608E10001)SF628$8.98$13.00$13.22$15.75$10.45$15.75
20Curb ramp (608E52000)SF159$26.84$26.00$34.17$31.00$21.25$30.00
21Curb, type 6, as per plan (609E26001)FT4,552$15.87$25.00$23.66$24.50$30.05$22.00
22Curb, misc.: concrete parking block (609E98100)EACH10$421.48$400.00$267.26$1,498.00$152.00$290.00
23Special - trash receptacle (680E14550)EACH3$1,993.18$2,750.00$2,539.77$2,635.00$2,412.00$2,300.00
24Special - bicycle rack (690E50560)EACH6$809.31$650.00$486.13$894.00$395.00$550.00
25Special - bench 48" backless with horizontal strap (690E98000)EACH1$2,476.12$3,000.00$3,132.83$2,870.00$2,826.00$2,700.00
26Special - bench 72" backed with horizontal strap S (690E98000)EACH2$2,511.74$3,750.00$3,269.06$3,090.00$3,048.00$2,900.00
27Special - bench 72" backless with horizontal strap (690E98000)EACH1$2,497.17$3,000.00$3,062.27$2,890.00$2,848.00$2,600.00
28Special - dog waste station, as per plan (690E98000)EACH2$1,215.57$1,550.00$844.00$1,030.00$968.00$1,025.00
29Special - ground water monitoring well adjust to G (690E98000)EACH1$528.47$2,150.00$1,494.77$1,670.00$1,522.00$3,700.00
30Tied concrete block mat with type 1 underlayment (601E21050)SY10$90.21$150.00$149.37$110.00$80.10$340.00
31Soil analysis test (659E00100)EACH2$206.90$150.00$236.64$700.00$84.00$50.00
32Topsoil (659E00300)CY950$42.20$15.00$51.25$55.00$72.15$70.00
33Seeding and mulching (659E10000)SY7,364$1.71$2.25$1.95$3.00$1.70$1.80
34Repair seeding and mulching (659E14000)SY369$1.03$2.00$1.18$3.00$1.65$1.80
35Commercial fertilizer (659E20000)TON1$1,551.73$1,200.00$1,774.84$1,060.00$910.00$700.00
36Lime (659E31000)ACRE1.53$206.90$1.00$236.97$112.42$60.00$0.50
37Water (659E35000)MGAL39.78$25.86$10.00$29.58$1.15$35.00$0.10
38Erosion control mat, type A (671E15000)SY1,184$2.43$2.50$2.78$4.25$4.15$1.90
39Storm water pollution prevention plan (832E15000)LS1$2,896.57$3,500.00$3,313.03$3,125.00$3,108.00$2,900.00
40Storm water pollution prevention inspections (832E15002)LS1$10,345$13,500$11,832$17,525$12,765$7,490.00
41Storm water pollution prevention inspection software (832E15010)LS1$13,448$13,500$16,565$16,715$15,540$11,990
42Erosion control (832E30000)EACH70,700$1.00$1.00$1.00$1.00$1.00$1.00
446" shallow pipe underdrains with geotextile fabric (605E11110)FT3,418$13.74$12.00$12.82$9.50$15.15$20.30
456" unclassified pipe underdrains (605E13300)FT20$40.83$10.00$42.61$41.00$19.15$55.00
46Aggregate drains (605E31100)FT20$32.54$10.00$54.00$36.50$24.95$47.00
476" conduit, type F (611E01500)FT280$34.38$20.00$36.82$18.75$34.75$45.00
48Catch basin, no. 3 (611E98150)EACH15$4,513.89$4,750.00$3,791.96$4,390.00$5,264.00$5,350.00
49Manhole, no. 3 (611E99574)EACH2$3,463.70$10,000$4,741.58$8,275.00$8,808.00$13,000
50Manhole adjusted to grade (611E99654)EACH7$866.78$750.00$586.65$902.00$463.00$1,200.00
51Precast reinforced concrete outlet (611E99710)EACH2$521.40$350.00$1,673.88$944.00$491.00$525.00
52Drainage structure, misc.: cleanout adjusted to (611E99900)EACH4$412.83$750.00$825.00$848.00$369.00$1,725.00
5512" conduit, type B (611E04400)FT1,724$93.13$95.00$74.84$122.25$107.40$109.00
5612" conduit, type B, as per plan (611E04401)FT143$102.68$135.00$84.88$185.00$249.15$155.00
57Asphalt concrete base, PG64-22, (449) (301E56000)CY305$303.65$285.00$337.22$318.00$316.35$260.00
58Aggregate base (304E20000)CY2,708$66.67$85.00$79.05$73.00$78.30$88.00
59Tack coat (407E10000)GAL679$1.07$4.25$5.03$5.00$4.70$4.50
60Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY396$383.56$330.00$390.46$368.00$366.30$300.00
61Asphalt concrete intermediate course, type 2, (449) (441E70300)CY533$356.92$300.00$354.97$335.00$333.00$265.00
62Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY29$426.17$400.00$473.29$446.00$444.00$320.00
63Fire hydrant adjusted to grade (638E10400)EACH1$2,152.88$1,750.00$2,067.93$1,175.00$2,533.00$4,500.00
64Valve box adjusted to grade (638E10800)EACH10$1,367.41$150.00$442.03$530.00$308.00$815.00
65Removal of delineator (620E31200)EACH7$37.83$30.00$218.19$41.00$41.00$35.00
66Ground rod (625E32000)EACH2$532.76$283.00$334.89$475.00$571.00$424.00
67Barrier reflector, type 2 (BI-directional) (626E00110)EACH3$12.31$14.00$16.64$13.00$13.20$15.00
68Ground mounted support, no. 3 post (630E03100)FT165$17.19$16.25$19.24$19.00$18.45$16.75
69Ground mounted support, no. 4 post, as per plan (630E04101)FT36$19.78$26.00$30.75$21.50$21.25$19.15
70Sign, flat sheet (630E80100)SF59$18.90$27.00$30.93$21.00$20.30$18.30
71Removal of ground mounted sign and disposal (630E84900)EACH22$17.61$25.00$29.60$19.00$18.90$17.05
72Removal of ground mounted sign and reerection (630E85100)EACH2$75.71$120.00$142.20$81.00$82.00$73.25
73Removal of ground mounted post support and disposal (630E86002)EACH9$23.48$35.00$41.37$25.00$25.00$22.75
74Signing, misc.: solar powered rectangular rapid FL (630E97700)EACH2$5,819.00$9,633.00$11,398$8,725.00$6,244.00$7,825.00
75Pedestal foundation (632E64020)EACH2$2,198.29$1,573.00$1,861.14$1,100.00$2,359.00$990.00
76Test hole performed (632E64950)EACH2$1,656.87$2,000.00$6,739.49$1,690.00$706.00$915.00
77Edge line, 4", type 1 (642E00100)MI1.04$1,003.45$1,428.00$1,689.87$1,080.00$1,075.00$970.00
78Center line, type 1 (642E00300)MI0.86$1,406.91$2,500.00$2,958.69$1,515.00$1,510.00$1,360.00
79Crosswalk line, 12", type 1 (642E00620)FT100$5.17$5.00$5.92$5.50$5.55$5.00
80Transverse/diagonal line, type 1 (642E00700)FT21$9.31$5.00$5.89$10.00$10.00$9.00
81Parking lot stall marking, type 1 (642E01200)FT190$1.55$10.00$11.83$2.00$1.65$1.50
82Handicap symbol marking, type 1 (642E01702)EACH1$103.45$75.41$89.01$112.00$111.00$100.00
83Work zone center line, class I (614E21000)MI0.49$1,137.94$3,500.00$4,140.51$1,225.00$3,890.00$1,100.00
84Work zone edge line, class I, 4" (614E22000)MI1.25$1,024.14$1,750.00$2,070.32$1,105.00$1,945.00$990.00
85Pavement for maintaining traffic, class B (615E25000)SY95$198.41$225.00$106.50$126.00$185.45$164.00
86Water (616E10000)MGAL1$2,834.82$50.00$118.32$1.00$116.00$175.00
87Premium for contract performance bond and for payment bond (103E05000)LS1$13,158$17,500$20,300$24,150$13,358$6,665.50
88Maintaining traffic (614E11000)LS1$47,373$50,000$4,667.77$95,160$73,148$85,000
89Construction layout stakes and surveying (623E10000)LS1$29,380$15,000$33,604$26,075$25,341$35,000
90Mobilization (624E10000)LS1$48,541$75,000$11,662$31,812$16,139$55,000
100Detour signing (614E12420)LS1$4,919.65$5,000.00$3,254.41$4,390.00$3,052.00$3,935.00
101Work zone stop line, class I (614E26000)FT24$9.31$6.00$7.10$10.00$6.65$9.00
102Work zone pavement marking, misc.: bike lane symbo (614E98200)EACH8$175.86$90.00$106.52$190.00$100.00$170.00
ODOT contract 260430: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy