ODOT contract 260430 bid tabulation
MOT-GMR Trail IMP CR22B (BIKEWAYS). Let by Ohio DOT on October 1, 2026, MOT. 8 bids received; low bid $1,642,320 by R B Jergens Contractors Inc, -7.8% against the engineer's estimate of $1,781,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 90
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | R B Jergens Contractors Inc | $1,642,320 | Low | -8.0% |
| 2 | Eagle Bridge Co | $1,697,752 | +3.0% | -5.0% |
| 3 | Integrity Contractors LLC | $1,767,639 | +8.0% | -1.0% |
| 4 | Milcon Concrete Inc | $1,816,612 | +11% | +2.0% |
| 5 | Double Jay Construction Inc | $1,814,568 | +10% | +2.0% |
| 6 | Barrett Paving Materials Inc | $1,820,137 | +11% | +2.0% |
| 7 | Brumbaugh Construction Inc | $1,842,662 | +12% | +3.0% |
| 8 | Sunesis Construction Co | $1,950,697 | +19% | +10% |
Engineer's estimate: $1,781,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R B Jergens Contractors Inc | 2. Eagle Bridge Co | 3. Integrity Contractors LLC | 4. Milcon Concrete Inc | 5. Double Jay Construction Inc | 6. Barrett Paving Materials Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,759.40 | $7,500.00 | $19,450 | $4,750.00 | $7,175.00 | $6,000.00 |
| 2 | Pavement removed (202E23000) | SY | 10,182 | $7.76 | $7.00 | $15.74 | $6.50 | $9.30 | $9.50 |
| 3 | Walk removed (202E30000) | SF | 668 | $3.35 | $3.50 | $3.20 | $1.75 | $2.30 | $2.00 |
| 4 | Curb removed (202E32000) | FT | 36 | $12.13 | $15.00 | $28.10 | $13.50 | $18.45 | $28.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 86 | $45.30 | $15.00 | $18.29 | $26.00 | $33.30 | $40.00 |
| 6 | Guardrail removed (202E38000) | FT | 77 | $20.77 | $13.00 | $30.31 | $14.50 | $12.50 | $13.00 |
| 7 | Catch basin removed (202E58100) | EACH | 5 | $508.19 | $400.00 | $1,125.91 | $898.00 | $581.00 | $550.00 |
| 8 | Excavation (203E10000) | CY | 1,204 | $22.84 | $28.00 | $21.83 | $30.50 | $22.90 | $20.00 |
| 9 | Embankment (203E20000) | CY | 1,873 | $17.79 | $25.00 | $27.38 | $24.50 | $24.80 | $30.00 |
| 10 | Subgrade compaction (204E10000) | SY | 13,665 | $2.94 | $2.50 | $3.40 | $2.00 | $1.80 | $2.05 |
| 11 | Excavation of subgrade (204E13000) | CY | 50 | $39.08 | $20.00 | $64.24 | $70.50 | $24.30 | $80.00 |
| 12 | Granular material, type C (204E30020) | CY | 50 | $62.72 | $50.00 | $81.96 | $106.00 | $61.90 | $100.00 |
| 13 | Proof rolling (204E45000) | HR | 7 | $325.18 | $200.00 | $324.72 | $375.00 | $254.00 | $250.00 |
| 14 | Geotextile fabric (204E50000) | SY | 20 | $46.94 | $3.00 | $119.95 | $5.60 | $18.75 | $13.00 |
| 15 | Guardrail, type MGS (606E15050) | FT | 50 | $103.45 | $45.00 | $52.80 | $50.00 | $111.00 | $100.00 |
| 16 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $3,103.47 | $2,850.00 | $3,372.73 | $3,180.00 | $3,330.00 | $3,000.00 |
| 17 | Anchor assembly, type T (606E26500) | EACH | 1 | $1,551.73 | $1,500.00 | $1,774.84 | $1,675.00 | $1,665.00 | $1,500.00 |
| 18 | 4" concrete walk (608E10000) | SF | 97 | $11.42 | $13.00 | $13.71 | $13.00 | $12.60 | $12.50 |
| 19 | 4" concrete walk, as per plan (608E10001) | SF | 628 | $8.98 | $13.00 | $13.22 | $15.75 | $10.45 | $15.75 |
| 20 | Curb ramp (608E52000) | SF | 159 | $26.84 | $26.00 | $34.17 | $31.00 | $21.25 | $30.00 |
| 21 | Curb, type 6, as per plan (609E26001) | FT | 4,552 | $15.87 | $25.00 | $23.66 | $24.50 | $30.05 | $22.00 |
| 22 | Curb, misc.: concrete parking block (609E98100) | EACH | 10 | $421.48 | $400.00 | $267.26 | $1,498.00 | $152.00 | $290.00 |
| 23 | Special - trash receptacle (680E14550) | EACH | 3 | $1,993.18 | $2,750.00 | $2,539.77 | $2,635.00 | $2,412.00 | $2,300.00 |
| 24 | Special - bicycle rack (690E50560) | EACH | 6 | $809.31 | $650.00 | $486.13 | $894.00 | $395.00 | $550.00 |
| 25 | Special - bench 48" backless with horizontal strap (690E98000) | EACH | 1 | $2,476.12 | $3,000.00 | $3,132.83 | $2,870.00 | $2,826.00 | $2,700.00 |
| 26 | Special - bench 72" backed with horizontal strap S (690E98000) | EACH | 2 | $2,511.74 | $3,750.00 | $3,269.06 | $3,090.00 | $3,048.00 | $2,900.00 |
| 27 | Special - bench 72" backless with horizontal strap (690E98000) | EACH | 1 | $2,497.17 | $3,000.00 | $3,062.27 | $2,890.00 | $2,848.00 | $2,600.00 |
| 28 | Special - dog waste station, as per plan (690E98000) | EACH | 2 | $1,215.57 | $1,550.00 | $844.00 | $1,030.00 | $968.00 | $1,025.00 |
| 29 | Special - ground water monitoring well adjust to G (690E98000) | EACH | 1 | $528.47 | $2,150.00 | $1,494.77 | $1,670.00 | $1,522.00 | $3,700.00 |
| 30 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 10 | $90.21 | $150.00 | $149.37 | $110.00 | $80.10 | $340.00 |
| 31 | Soil analysis test (659E00100) | EACH | 2 | $206.90 | $150.00 | $236.64 | $700.00 | $84.00 | $50.00 |
| 32 | Topsoil (659E00300) | CY | 950 | $42.20 | $15.00 | $51.25 | $55.00 | $72.15 | $70.00 |
| 33 | Seeding and mulching (659E10000) | SY | 7,364 | $1.71 | $2.25 | $1.95 | $3.00 | $1.70 | $1.80 |
| 34 | Repair seeding and mulching (659E14000) | SY | 369 | $1.03 | $2.00 | $1.18 | $3.00 | $1.65 | $1.80 |
| 35 | Commercial fertilizer (659E20000) | TON | 1 | $1,551.73 | $1,200.00 | $1,774.84 | $1,060.00 | $910.00 | $700.00 |
| 36 | Lime (659E31000) | ACRE | 1.53 | $206.90 | $1.00 | $236.97 | $112.42 | $60.00 | $0.50 |
| 37 | Water (659E35000) | MGAL | 39.78 | $25.86 | $10.00 | $29.58 | $1.15 | $35.00 | $0.10 |
| 38 | Erosion control mat, type A (671E15000) | SY | 1,184 | $2.43 | $2.50 | $2.78 | $4.25 | $4.15 | $1.90 |
| 39 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,896.57 | $3,500.00 | $3,313.03 | $3,125.00 | $3,108.00 | $2,900.00 |
| 40 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,345 | $13,500 | $11,832 | $17,525 | $12,765 | $7,490.00 |
| 41 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $13,448 | $13,500 | $16,565 | $16,715 | $15,540 | $11,990 |
| 42 | Erosion control (832E30000) | EACH | 70,700 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 44 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 3,418 | $13.74 | $12.00 | $12.82 | $9.50 | $15.15 | $20.30 |
| 45 | 6" unclassified pipe underdrains (605E13300) | FT | 20 | $40.83 | $10.00 | $42.61 | $41.00 | $19.15 | $55.00 |
| 46 | Aggregate drains (605E31100) | FT | 20 | $32.54 | $10.00 | $54.00 | $36.50 | $24.95 | $47.00 |
| 47 | 6" conduit, type F (611E01500) | FT | 280 | $34.38 | $20.00 | $36.82 | $18.75 | $34.75 | $45.00 |
| 48 | Catch basin, no. 3 (611E98150) | EACH | 15 | $4,513.89 | $4,750.00 | $3,791.96 | $4,390.00 | $5,264.00 | $5,350.00 |
| 49 | Manhole, no. 3 (611E99574) | EACH | 2 | $3,463.70 | $10,000 | $4,741.58 | $8,275.00 | $8,808.00 | $13,000 |
| 50 | Manhole adjusted to grade (611E99654) | EACH | 7 | $866.78 | $750.00 | $586.65 | $902.00 | $463.00 | $1,200.00 |
| 51 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $521.40 | $350.00 | $1,673.88 | $944.00 | $491.00 | $525.00 |
| 52 | Drainage structure, misc.: cleanout adjusted to (611E99900) | EACH | 4 | $412.83 | $750.00 | $825.00 | $848.00 | $369.00 | $1,725.00 |
| 55 | 12" conduit, type B (611E04400) | FT | 1,724 | $93.13 | $95.00 | $74.84 | $122.25 | $107.40 | $109.00 |
| 56 | 12" conduit, type B, as per plan (611E04401) | FT | 143 | $102.68 | $135.00 | $84.88 | $185.00 | $249.15 | $155.00 |
| 57 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 305 | $303.65 | $285.00 | $337.22 | $318.00 | $316.35 | $260.00 |
| 58 | Aggregate base (304E20000) | CY | 2,708 | $66.67 | $85.00 | $79.05 | $73.00 | $78.30 | $88.00 |
| 59 | Tack coat (407E10000) | GAL | 679 | $1.07 | $4.25 | $5.03 | $5.00 | $4.70 | $4.50 |
| 60 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 396 | $383.56 | $330.00 | $390.46 | $368.00 | $366.30 | $300.00 |
| 61 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 533 | $356.92 | $300.00 | $354.97 | $335.00 | $333.00 | $265.00 |
| 62 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 29 | $426.17 | $400.00 | $473.29 | $446.00 | $444.00 | $320.00 |
| 63 | Fire hydrant adjusted to grade (638E10400) | EACH | 1 | $2,152.88 | $1,750.00 | $2,067.93 | $1,175.00 | $2,533.00 | $4,500.00 |
| 64 | Valve box adjusted to grade (638E10800) | EACH | 10 | $1,367.41 | $150.00 | $442.03 | $530.00 | $308.00 | $815.00 |
| 65 | Removal of delineator (620E31200) | EACH | 7 | $37.83 | $30.00 | $218.19 | $41.00 | $41.00 | $35.00 |
| 66 | Ground rod (625E32000) | EACH | 2 | $532.76 | $283.00 | $334.89 | $475.00 | $571.00 | $424.00 |
| 67 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 3 | $12.31 | $14.00 | $16.64 | $13.00 | $13.20 | $15.00 |
| 68 | Ground mounted support, no. 3 post (630E03100) | FT | 165 | $17.19 | $16.25 | $19.24 | $19.00 | $18.45 | $16.75 |
| 69 | Ground mounted support, no. 4 post, as per plan (630E04101) | FT | 36 | $19.78 | $26.00 | $30.75 | $21.50 | $21.25 | $19.15 |
| 70 | Sign, flat sheet (630E80100) | SF | 59 | $18.90 | $27.00 | $30.93 | $21.00 | $20.30 | $18.30 |
| 71 | Removal of ground mounted sign and disposal (630E84900) | EACH | 22 | $17.61 | $25.00 | $29.60 | $19.00 | $18.90 | $17.05 |
| 72 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $75.71 | $120.00 | $142.20 | $81.00 | $82.00 | $73.25 |
| 73 | Removal of ground mounted post support and disposal (630E86002) | EACH | 9 | $23.48 | $35.00 | $41.37 | $25.00 | $25.00 | $22.75 |
| 74 | Signing, misc.: solar powered rectangular rapid FL (630E97700) | EACH | 2 | $5,819.00 | $9,633.00 | $11,398 | $8,725.00 | $6,244.00 | $7,825.00 |
| 75 | Pedestal foundation (632E64020) | EACH | 2 | $2,198.29 | $1,573.00 | $1,861.14 | $1,100.00 | $2,359.00 | $990.00 |
| 76 | Test hole performed (632E64950) | EACH | 2 | $1,656.87 | $2,000.00 | $6,739.49 | $1,690.00 | $706.00 | $915.00 |
| 77 | Edge line, 4", type 1 (642E00100) | MI | 1.04 | $1,003.45 | $1,428.00 | $1,689.87 | $1,080.00 | $1,075.00 | $970.00 |
| 78 | Center line, type 1 (642E00300) | MI | 0.86 | $1,406.91 | $2,500.00 | $2,958.69 | $1,515.00 | $1,510.00 | $1,360.00 |
| 79 | Crosswalk line, 12", type 1 (642E00620) | FT | 100 | $5.17 | $5.00 | $5.92 | $5.50 | $5.55 | $5.00 |
| 80 | Transverse/diagonal line, type 1 (642E00700) | FT | 21 | $9.31 | $5.00 | $5.89 | $10.00 | $10.00 | $9.00 |
| 81 | Parking lot stall marking, type 1 (642E01200) | FT | 190 | $1.55 | $10.00 | $11.83 | $2.00 | $1.65 | $1.50 |
| 82 | Handicap symbol marking, type 1 (642E01702) | EACH | 1 | $103.45 | $75.41 | $89.01 | $112.00 | $111.00 | $100.00 |
| 83 | Work zone center line, class I (614E21000) | MI | 0.49 | $1,137.94 | $3,500.00 | $4,140.51 | $1,225.00 | $3,890.00 | $1,100.00 |
| 84 | Work zone edge line, class I, 4" (614E22000) | MI | 1.25 | $1,024.14 | $1,750.00 | $2,070.32 | $1,105.00 | $1,945.00 | $990.00 |
| 85 | Pavement for maintaining traffic, class B (615E25000) | SY | 95 | $198.41 | $225.00 | $106.50 | $126.00 | $185.45 | $164.00 |
| 86 | Water (616E10000) | MGAL | 1 | $2,834.82 | $50.00 | $118.32 | $1.00 | $116.00 | $175.00 |
| 87 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,158 | $17,500 | $20,300 | $24,150 | $13,358 | $6,665.50 |
| 88 | Maintaining traffic (614E11000) | LS | 1 | $47,373 | $50,000 | $4,667.77 | $95,160 | $73,148 | $85,000 |
| 89 | Construction layout stakes and surveying (623E10000) | LS | 1 | $29,380 | $15,000 | $33,604 | $26,075 | $25,341 | $35,000 |
| 90 | Mobilization (624E10000) | LS | 1 | $48,541 | $75,000 | $11,662 | $31,812 | $16,139 | $55,000 |
| 100 | Detour signing (614E12420) | LS | 1 | $4,919.65 | $5,000.00 | $3,254.41 | $4,390.00 | $3,052.00 | $3,935.00 |
| 101 | Work zone stop line, class I (614E26000) | FT | 24 | $9.31 | $6.00 | $7.10 | $10.00 | $6.65 | $9.00 |
| 102 | Work zone pavement marking, misc.: bike lane symbo (614E98200) | EACH | 8 | $175.86 | $90.00 | $106.52 | $190.00 | $100.00 | $170.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.