ODOT contract 260090 bid tabulation

MOT-Trotwood Olive Rd Walks SA22 (SPOT SAFETY). Let by Ohio DOT on February 19, 2026, MOT. 5 bids received; low bid $828,511 by Performance Site Development, -8.6% against the engineer's estimate of $906,000.

Owner
Ohio DOT
Letting
19 FEB 2026
Pay items
110
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Performance Site Development$828,511Low-9.0%
2Brumbaugh Construction Inc$844,632+2.0%-7.0%
3Double Jay Construction Inc$943,828+14%+4.0%
4Perram Electric Inc$1,113,500+34%+23%
5Complete General Construction Company$1,157,319+40%+28%
ODOT contract 260090: bids by rank

Engineer's estimate: $906,000.

Bid tabulation

LinePay itemUnitQuantity1. Performance Site Development2. Brumbaugh Construction Inc3. Double Jay Construction Inc4. Perram Electric Inc5. Complete General Construction Company
1Clearing and grubbing (201E11000)LS1$44,150$46,000$45,550$32,500$50,000
2Pavement removed (202E23000)SY613$6.40$17.00$17.45$11.00$45.00
3Walk removed (202E30000)SF925$4.00$4.00$1.80$5.00$6.50
4Curb removed (202E32000)FT210$11.00$15.00$15.10$17.50$28.00
5Guardrail removed (202E38000)FT330$6.35$7.00$6.60$2.40$2.50
6Fence removed (202E75000)FT70$6.35$12.00$11.10$14.00$9.50
7Excavation (203E10000)CY431$29.55$30.00$30.10$50.00$150.00
8Embankment (203E20000)CY345$25.00$38.00$31.20$45.00$11.50
9Subgrade compaction (204E10000)SY417$4.00$3.00$2.95$3.25$11.50
10Guardrail, type MGS with long posts (606E15100)FT682.50$28.36$28.00$29.70$26.40$26.00
11Anchor assembly, MGS type T (606E26550)EACH3$1,392.00$1,400.00$1,458.00$1,420.00$1,420.00
124" concrete walk, as per plan (608E10001)SF7,940$8.85$9.00$7.85$8.00$12.30
136" concrete walk (608E13000)SF180$12.25$12.00$9.90$11.50$21.50
148" concrete walk (608E15000)SF460$12.95$14.00$11.85$11.50$30.00
15Curb ramp (608E52000)SF1,195$22.25$23.00$18.00$26.00$13.50
16Detectable warning (608E53020)SF80$29.00$56.00$53.00$33.00$8.75
17Topsoil (659E00300)CY360$68.30$60.00$71.50$30.00$47.00
18Seeding and mulching, class 2 (659E00510)SY3,235$2.40$1.00$2.50$2.50$1.75
19Commercial fertilizer (659E20000)TON0.45$800.00$1,400.00$840.00$750.00$1,500.00
20Water (659E35000)MGAL18$31.75$5.00$33.00$100.00$1.00
21Slope erosion protection (670E00500)SY2,680$4.75$2.25$4.95$2.25$1.95
22Erosion control (832E30000)EACH30,000$1.00$1.00$1.00$1.00$1.00
23Concrete masonry (602E20000)CY3.46$995.00$3,200.00$3,380.00$2,100.00$3,050.00
2412" conduit, type B (611E04400)FT200$97.60$87.00$74.20$110.00$235.00
2512" conduit, type C (611E04600)FT25$89.20$85.00$70.45$135.00$180.00
2618" conduit, type B (611E07400)FT110$114.85$104.00$92.95$135.00$250.00
27Manhole, no. 3 (611E99574)EACH1$3,220.00$3,300.00$4,496.00$3,700.00$4,700.00
28Manhole adjusted to grade (611E99654)EACH1$1,750.00$325.00$1,903.00$600.00$1,550.00
29Pavement planing, asphalt concrete, 1.5" (254E01000)SY249$42.25$19.00$19.90$50.00$50.00
30Asphalt concrete base, PG64-22, (449) (301E56000)CY71$241.55$490.00$512.60$575.00$575.00
31Aggregate base (304E20000)CY71$86.15$95.00$99.00$145.00$180.00
32Non-tracking tack coat (407E20000)GAL87$31.55$12.00$13.20$10.00$10.00
33Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY36$1,087.85$532.00$556.60$975.00$975.00
34Asphalt concrete surface course, 12.5 MM, type A (449) (driveways) (442E22120)CY14$787.55$554.00$578.60$1,460.00$1,460.00
356" non-reinforced concrete pavement, class QC 1P (452E10010)SY28$115.00$105.00$127.25$125.00$135.00
368" non-reinforced concrete pavement, class QC 1P (452E12010)SY85$126.00$11.00$122.95$125.00$130.00
37Combination curb and gutter, type 2 (609E12000)FT200$53.00$60.00$63.85$88.00$78.50
38Curb, type 6 (609E26000)FT590$39.00$45.00$43.15$56.00$38.00
39Fire hydrant removed and reset, as per plan (638E10501)EACH1$1,125.00$4,900.00$2,660.00$3,300.00$2,600.00
40Ground mounted support, no. 3 post (630E03100)FT145.50$18.95$20.00$19.80$23.90$17.00
41Sign post reflector (630E08600)EACH8$47.26$64.00$49.50$125.00$45.00
42Sign hanger assembly, span wire (630E79000)EACH13$302.42$298.00$317.00$160.00$500.00
43Sign support assembly, pole mounted, as per plan (630E79501)EACH14$241.55$373.00$253.00$135.00$395.00
44Sign, flat sheet (630E80100)SF160.25$26.26$20.00$27.60$30.00$26.00
45Sign, double faced, street name (630E80500)EACH4$120.76$271.00$126.50$275.00$210.00
46Removal of ground mounted sign and storage (630E85000)EACH4$21.20$22.00$22.00$110.00$35.00
47Removal of ground mounted sign and reerection (630E85100)EACH4$26.26$71.00$27.50$220.00$65.00
48Removal of ground mounted post support and storage (630E86006)EACH5$31.55$30.00$33.00$110.00$50.00
49Removal of ground mounted post support and reerection (630E86010)EACH2$36.76$122.00$38.50$220.00$125.00
50Edge line, 6" (644E00104)MI0.07$11,191$11,200$11,725$8,755.00$10,658
51Center line (644E00300)MI0.40$10,501$10,500$11,000$10,175$10,000
52Channelizing line, 12" (644E00404)FT350$2.16$2.00$2.20$2.25$2.00
53Stop line (644E00500)FT49$8.46$8.00$8.80$5.25$8.00
54Crosswalk line, 24" (644E00630)FT290$8.45$8.00$8.80$5.20$8.00
55Transverse/diagonal line (644E00700)FT155$8.45$8.00$8.80$5.00$8.00
56Chevron marking (644E00720)FT115$8.45$8.00$8.80$5.00$8.00
57Lane arrow (644E01300)EACH5$157.75$158.00$165.00$175.00$150.00
58Removal of pavement marking (644E30000)FT460$5.50$5.25$5.50$5.05$5.00
59Removal of pavement marking (644E30020)EACH2$157.75$158.00$165.00$400.00$150.00
60Connection, fused pull apart (625E00450)EACH2$89.26$89.00$203.35$175.00$150.00
61Connection, unfused pull apart (625E00460)EACH2$72.46$73.00$201.35$170.00$150.00
62Bracket arm, 20' (625E18400)EACH2$1,121.85$1,125.00$1,372.00$1,010.00$2,000.00
63No. 10 AWG 600 volt distribution cable (625E23306)FT1,320$0.80$0.80$2.55$3.15$2.00
64No. 10 AWG pole and bracket cable (625E23400)FT360$0.63$0.60$2.50$1.10$3.25
65Conduit, 2", 725.051 (625E25408)FT780$1.25$1.25$6.70$12.90$11.25
66Conduit, jacked or drilled, 725.04, 4" (625E25902)FT49$57.76$58.00$178.85$152.00$100.00
67Luminaire, conventional, solid state (LED), type I (625E26252)EACH2$623.75$626.00$680.00$660.00$500.00
68Trench (625E29000)FT780$17.35$17.00$14.05$14.00$12.00
69Pull box, 725.08, 18" (625E30700)EACH2$866.26$868.00$1,067.00$2,050.00$1,300.00
70Pull box removed (625E31510)EACH7$787.55$789.00$437.00$250.00$450.00
71Ground rod (625E32000)EACH11$141.76$142.00$286.00$350.00$290.00
72Underground warning marking tape (625E36010)FT780$1.45$1.40$1.75$1.30$3.00
73Sign lighting misc.: warning sign flasher assembly (631E97700)EACH2$7,855.90$7,875.00$1,615.00$1,805.00$1,500.00
74Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006)EACH10$753.60$755.00$1,252.00$970.00$1,150.00
75Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate (632E05064)EACH4$1,023.76$1,026.00$1,426.00$1,070.00$1,300.00
76Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086)EACH1$1,407.65$1,400.00$1,997.00$1,635.00$1,900.00
77Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH8$455.05$455.00$813.00$568.00$800.00
78Accessible pedestrian pushbutton, as per plan (632E20751)EACH8$1,414.78$1,420.00$1,242.00$1,300.00$1,250.00
79Covering of vehicular signal head (632E25000)EACH14$47.26$47.00$93.80$10.00$38.00
80Covering of pedestrian signal head (632E25010)EACH8$47.26$47.00$93.80$5.00$32.00
81Messenger wire, 7 strand, 3/8" diameter with accessories (632E30200)FT410$9.90$10.00$13.60$14.65$20.00
82Signal cable, 3 conductor, no. 14 AWG (632E40300)FT200$0.72$0.75$2.50$3.35$2.50
83Signal cable, 5 conductor, no. 14 AWG (632E40500)FT3,200$1.15$1.15$3.05$3.57$3.00
84Signal cable, 7 conductor, no. 14 AWG (632E40700)FT2,120$1.50$1.50$3.70$3.90$3.75
85Strain pole foundation (632E64000)EACH3$2,362.55$2,400.00$7,773.00$10,555$9,000.00
86Pedestal foundation (632E64020)EACH8$787.55$790.00$1,312.00$1,610.00$1,500.00
87Power cable, 3 conductor, no. 8 AWG (632E67300)FT60$2.95$2.90$4.05$6.25$5.00
88Strain pole, type TC-81.11, design 10 (632E86130)EACH1$13,908$13,950$13,408$12,740$12,000
89Combination strain pole, type TC-81.11, design 10 (632E87130)EACH1$14,717$14,750$14,101$13,285$12,000
90Combination strain pole, type TC-81.11, design 12 (632E87140)EACH1$16,270$16,300$15,431$14,340$14,000
91Pedestal, 5', transformer base (632E89802)EACH1$497.70$500.00$938.00$1,010.00$1,000.00
92Pedestal, 10', transformer base (632E89904)EACH5$611.50$613.00$1,147.00$1,090.00$1,000.00
93Pedestal, 15', transformer base (632E90008)EACH2$796.30$800.00$2,780.00$1,220.00$2,000.00
94Removal of traffic signal installation (632E90100)EACH1$6,300.05$6,300.00$7,458.00$7,040.00$6,000.00
95Reuse of traffic control item: pull box (632E90104)EACH1$787.60$790.00$746.00$490.00$275.00
96Reuse of strain pole (632E90208)EACH1$787.60$790.00$1,645.00$2,420.00$825.00
97Cabinet, type TS-2, as per plan (633E65511)EACH1$16,275$16,300$24,723$22,385$20,000
98Advance radar detection, as per plan (809E69001)EACH2$10,734$10,750$10,794$10,150$9,300.00
99Stop line radar detection, as per plan (809E69101)EACH4$10,308$10,300$10,415$10,075$9,000.00
100Atc controller, as per plan (809E69123)EACH1$6,825.50$6,840.00$6,542.00$7,385.00$5,500.00
101Emergency vehicle preemption (809E69200)EACH1$995.35$1,000.00$1,880.00$850.00$1,200.00
102Preempt receiving unit (809E69210)EACH1$3,334.00$3,350.00$3,091.00$805.00$800.00
103Preempt detector cable (809E69220)FT700$1.60$1.50$4.00$3.95$5.00
104Preempt phase selector (809E69230)EACH1$5,452.90$5,470.00$1,480.00$2,455.00$6,000.00
105Preempt confirmation light (809E69240)EACH1$1,143.60$1,150.00$1,143.00$2,855.00$750.00
106Law enforcement officer with patrol car for assistance (614E11110)HR25$89.30$100.00$99.00$120.00$100.00
107Premium for contract performance bond and for payment bond (103E05000)LS1$17,025$7,010.00$7,202.00$20,059$7,000.00
108Maintaining traffic (614E11000)LS1$18,995$40,000$77,452$189,008$70,000
109Construction layout stakes and surveying (623E10000)LS1$19,995$15,000$9,878.00$8,000.00$10,000
110Mobilization (624E10000)LS1$17,950$33,000$37,510$40,000$87,000
ODOT contract 260090: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy