ODOT contract 250197 bid tabulation
PRE-SR 725-13.60 (CULVERT REPLACEMENT). Let by Ohio DOT on April 10, 2025, PRE. 6 bids received; low bid $931,294 by Double Jay Construction Inc, -4.3% against the engineer's estimate of $973,000.
- Owner
- Ohio DOT
- Letting
- 10 APR 2025
- Pay items
- 73
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Double Jay Construction Inc | $931,294 | Low | -4.0% |
| 2 | Brumbaugh Construction Inc | $969,889 | +4.0% | 0.0% |
| 3 | Fillmore Construction | $978,716 | +5.0% | +1.0% |
| 4 | John R Jurgensen Company | $1,067,222 | +15% | +10% |
| 5 | Sunesis Construction Co | $1,092,151 | +17% | +12% |
| 6 | Performance Site Development | $1,139,339 | +22% | +17% |
Engineer's estimate: $973,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Double Jay Construction Inc | 2. Brumbaugh Construction Inc | 3. Fillmore Construction | 4. John R Jurgensen Company | 5. Sunesis Construction Co | 6. Performance Site Development |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $6,700.00 | $13,882 | $10,000 | $7,787.43 | $1,806.21 | $17,184 |
| 2 | Headwall removed (202E20010) | EACH | 8 | $1,111.00 | $200.00 | $1,000.00 | $1,242.70 | $1,377.97 | $515.00 |
| 3 | Pavement removed (202E23000) | SY | 252 | $18.85 | $13.00 | $20.00 | $24.37 | $18.49 | $14.74 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 185 | $17.00 | $26.00 | $10.00 | $55.67 | $23.60 | $32.00 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 289 | $38.40 | $30.00 | $20.00 | $95.45 | $46.42 | $42.00 |
| 6 | Guardrail removed (202E38000) | FT | 300 | $5.50 | $5.50 | $5.00 | $5.50 | $5.00 | $6.00 |
| 7 | Anchor assembly removed, type E (202E42010) | EACH | 8 | $140.00 | $200.00 | $300.00 | $175.00 | $192.36 | $190.00 |
| 8 | Mailbox removed (202E53100) | EACH | 3 | $95.00 | $100.00 | $50.00 | $94.09 | $124.92 | $49.00 |
| 9 | Fence removed (202E75000) | FT | 138 | $10.00 | $4.00 | $10.00 | $7.50 | $4.47 | $8.10 |
| 10 | Removal misc.: inlet box (202E98100) | EACH | 1 | $360.00 | $300.00 | $500.00 | $1,090.52 | $789.84 | $850.00 |
| 11 | Removal misc.: concrete riprap (202E98400) | SF | 54 | $13.25 | $8.00 | $10.00 | $11.44 | $16.29 | $25.00 |
| 12 | Excavation (203E10000) | CY | 3,960 | $19.90 | $27.00 | $20.00 | $19.39 | $20.61 | $29.95 |
| 13 | Excavation, as per plan (203E10001) | CY | 402 | $44.90 | $33.00 | $35.00 | $58.20 | $61.42 | $38.00 |
| 14 | Embankment (203E20000) | CY | 2,094 | $17.30 | $17.00 | $30.00 | $17.49 | $9.27 | $27.00 |
| 15 | Embankment, as per plan (203E20001) | CY | 402 | $17.50 | $26.00 | $35.00 | $30.32 | $86.79 | $34.00 |
| 16 | Subgrade compaction (204E10000) | SY | 428 | $2.00 | $1.25 | $3.00 | $4.19 | $5.90 | $7.00 |
| 17 | Reference monument, type A (623E40500) | EACH | 8 | $295.00 | $750.00 | $2,000.00 | $985.35 | $1,003.43 | $1,250.00 |
| 18 | Special - mailbox support system, single (690E50100) | EACH | 3 | $355.00 | $450.00 | $300.00 | $736.21 | $322.38 | $455.00 |
| 19 | Riprap, type D, as per plan (601E11001) | SY | 62 | $114.00 | $175.00 | $140.00 | $423.13 | $326.62 | $195.00 |
| 20 | Rock channel protection, type B with filter (601E32100) | CY | 35 | $206.00 | $144.00 | $160.00 | $349.27 | $228.65 | $225.00 |
| 21 | Rock channel protection, type C with filter (601E32200) | CY | 8 | $203.00 | $148.00 | $180.00 | $414.72 | $365.82 | $205.00 |
| 22 | Soil analysis test (659E00100) | EACH | 2 | $560.00 | $100.00 | $150.00 | $135.00 | $25.00 | $81.25 |
| 23 | Topsoil (659E00300) | CY | 157 | $63.75 | $65.00 | $50.00 | $65.01 | $75.00 | $70.25 |
| 24 | Seeding and mulching, class 2 (659E00510) | SY | 10,900 | $2.30 | $1.25 | $1.00 | $0.87 | $4.12 | $1.50 |
| 25 | Repair seeding and mulching (659E14000) | SY | 545 | $1.10 | $3.00 | $2.00 | $0.87 | $0.15 | $1.50 |
| 26 | Inter-seeding (659E15000) | SY | 545 | $1.10 | $3.00 | $2.00 | $0.75 | $0.10 | $1.50 |
| 27 | Commercial fertilizer (659E20000) | TON | 1.52 | $1,700.00 | $750.00 | $1,400.00 | $950.00 | $800.00 | $821.00 |
| 28 | Lime (659E31000) | ACRE | 2.25 | $224.00 | $100.00 | $450.00 | $80.00 | $5.00 | $32.50 |
| 29 | Water (659E35000) | MGAL | 60 | $11.00 | $5.00 | $1.00 | $1.00 | $5.00 | $50.00 |
| 30 | Slope erosion protection (670E00500) | SY | 1,412 | $2.15 | $3.50 | $2.00 | $2.90 | $2.50 | $4.30 |
| 31 | Ditch erosion protection mat, type B (670E00720) | SY | 1,937 | $2.15 | $3.50 | $3.50 | $2.75 | $2.50 | $4.30 |
| 32 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,350.00 | $2,650.00 | $5,000.00 | $2,540.00 | $2,540.00 | $3,175.00 |
| 33 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,080 | $6,500.00 | $5,000.00 | $3,700.00 | $3,780.00 | $11,150 |
| 34 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $11,200 | $10,000 | $5,000.00 | $9,644.71 | $9,644.71 | $12,995 |
| 35 | Erosion control (832E30000) | EACH | 32,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $3,600.00 | $2,500.00 | $3,500.00 | $11,581 | $21,418 | $19,995 |
| 37 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $11,290 | $47,500 | $3,500.00 | $11,581 | $21,418 | $22,550 |
| 38 | Concrete masonry (602E20000) | CY | 13.50 | $1,725.00 | $1,950.00 | $2,000.00 | $2,578.58 | $2,646.12 | $3,550.00 |
| 39 | Aggregate drains (605E31100) | FT | 80 | $20.00 | $20.00 | $30.00 | $61.12 | $9.16 | $25.00 |
| 40 | 4" conduit, type F (611E00406) | FT | 50 | $28.50 | $29.00 | $30.00 | $29.35 | $26.69 | $25.00 |
| 41 | 6" conduit, type F (611E01500) | FT | 50 | $30.00 | $30.00 | $40.00 | $35.78 | $27.80 | $26.00 |
| 42 | 8" conduit, type F (611E02600) | FT | 50 | $33.25 | $33.00 | $50.00 | $44.52 | $36.49 | $27.00 |
| 43 | 12" conduit, type E (611E05100) | FT | 42 | $55.00 | $48.00 | $100.00 | $123.70 | $84.12 | $74.00 |
| 44 | 12" conduit, type F (611E05200) | FT | 50 | $42.00 | $40.00 | $100.00 | $71.64 | $83.79 | $65.00 |
| 45 | 24" conduit, type D (611E10900) | FT | 84 | $90.45 | $70.00 | $120.00 | $95.86 | $127.25 | $108.00 |
| 46 | 24" conduit, type D (611E10900) | FT | 28 | $135.00 | $125.00 | $120.00 | $150.62 | $192.97 | $129.00 |
| 47 | 36" conduit, type D (611E16900) | FT | 36 | $134.00 | $107.00 | $150.00 | $151.80 | $178.19 | $145.75 |
| 48 | 63" X 98" conduit, type A, 706.04 (611E53500) | FT | 180 | $1,292.00 | $1,320.00 | $1,850.00 | $1,608.10 | $1,704.66 | $1,469.00 |
| 49 | Pavement repair, as per plan (253E02001) | CY | 50 | $698.00 | $315.00 | $300.00 | $600.00 | $500.00 | $148.00 |
| 50 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 7,444 | $2.60 | $4.00 | $2.00 | $2.25 | $2.35 | $4.45 |
| 51 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 33 | $612.00 | $315.00 | $240.00 | $900.00 | $547.00 | $469.90 |
| 52 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 16 | $675.00 | $315.00 | $300.00 | $1,250.00 | $605.00 | $669.70 |
| 53 | Aggregate base (304E20000) | CY | 64 | $71.00 | $100.00 | $100.00 | $194.00 | $101.70 | $84.60 |
| 54 | Non-tracking tack coat (407E20000) | GAL | 480 | $5.00 | $6.00 | $3.00 | $5.00 | $4.50 | $5.45 |
| 55 | Stabilized crushed aggregate (411E10000) | CY | 252 | $102.00 | $126.00 | $50.00 | $89.63 | $101.96 | $85.00 |
| 56 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 327 | $257.50 | $250.00 | $240.00 | $205.00 | $233.10 | $292.50 |
| 57 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 6 | $761.50 | $315.00 | $500.00 | $1,250.00 | $680.00 | $1,622.00 |
| 58 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 9 | $214.50 | $165.00 | $100.00 | $550.73 | $470.25 | $550.00 |
| 59 | RPM (621E00100) | EACH | 30 | $107.25 | $100.00 | $95.85 | $95.85 | $95.85 | $159.00 |
| 60 | Raised pavement marker removed (621E54000) | EACH | 30 | $49.00 | $25.00 | $20.00 | $19.97 | $43.75 | $16.55 |
| 61 | Edge line, 6" (644E00104) | MI | 0.88 | $5,400.00 | $5,000.00 | $4,830.00 | $4,830.00 | $4,830.00 | $7,311.00 |
| 62 | Center line (644E00300) | MI | 0.44 | $7,210.00 | $6,750.00 | $6,440.00 | $6,440.00 | $6,440.00 | $9,402.00 |
| 63 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $83.50 | $145.00 | $200.00 | $43.83 | $74.84 | $85.00 |
| 64 | Traffic compacted surface, type C (410E13000) | CY | 50 | $104.75 | $145.00 | $200.00 | $43.83 | $89.52 | $85.00 |
| 65 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $95.00 | $100.00 | $1,000.00 | $118.74 | $85.00 | $155.00 |
| 66 | Detour signing (614E12420) | LS | 1 | $8,575.00 | $8,000.00 | $10,000 | $7,655.00 | $7,655.00 | $11,950 |
| 67 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,175.00 | $1,100.00 | $1,500.00 | $1,050.00 | $1,050.00 | $995.00 |
| 68 | Water (616E10000) | MGAL | 50 | $106.40 | $5.00 | $1.00 | $104.00 | $13.86 | $55.00 |
| 69 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,240.00 | $7,000.00 | $7,500.00 | $5,582.15 | $6,584.42 | $29,995 |
| 70 | Maintaining traffic (614E11000) | LS | 1 | $11,506 | $22,000 | $10,000 | $7,459.17 | $12,093 | $22,500 |
| 71 | Field office, type B (619E16010) | MNTH | 3 | $2,500.00 | $2,275.00 | $1,000.00 | $2,578.78 | $1,551.67 | $4,450.00 |
| 72 | Construction layout stakes and surveying (623E10000) | LS | 1 | $16,800 | $7,000.00 | $7,500.00 | $11,998 | $11,800 | $16,700 |
| 73 | Mobilization (624E10000) | LS | 1 | $32,876 | $40,000 | $10,000 | $50,000 | $52,137 | $19,950 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 10, 2025. Compiled by Mirage Metrics.