34 contracts let by Ohio DOT on April 27, 2023, $82,235,128 in low bids, a median of 2.5 bidders per contract. On the 34 with an engineer's estimate, the low bid came in under it 10 times; median low bid +4.0% against the estimate.

Owner
Ohio DOT
Contracts
34
Low bids, total
$82,235,128
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
230256FRA-SR 315-02.78 (BRIDGE REPAIR)FRA2Complete General Construction Company$10,590,326$10,980,590+4.0%+26%ODOT
230248BEL-SR 149-10.99 (MAJOR RECONSTRUCTION)BEL2Shelly & Sands Inc$9,869,260$10,004,000+1.0%+14%ODOT
230212CUY-BH FY2023 Misc (BRIDGE REPAIR)CUY1Great Lakes Construction Co$8,757,582+39%ODOT
230255FRA-US 40-07.00 (MAJOR RECONSTRUCTION)FRA4Shelly & Sands Inc$8,419,695$10,245,107+22%+8.0%ODOT
230254DEL-US 36-17.95 over IR 71 (BRIDGE REPAIR)DEL3Shelly & Sands Inc$6,716,896$7,205,866+7.0%+20%ODOT
230249BEL-IR 470-00.00 (FOUR LANE RESURFACING)BEL2Shelly & Sands Inc$6,396,630$6,521,800+2.0%+3.0%ODOT
230278D12-PPM FY2023 (FOUR LANE RESURFACING)District 124Kokosing Construction Company Inc$3,704,276$3,995,152+8.0%+8.0%ODOT
230253DEL-US 36-18.79 (at Galena) (INTERSECTION)DEL5Shelly & Sands Inc$2,800,112$3,041,930+9.0%-1.0%ODOT
230279FRA-IR 270 SP FY23 (SPOT PATCHING / PAVEMENT REPAIR)FRA1Kokosing Construction Company Inc$1,874,188-6.0%ODOT
230272TRU-SR 46-01.05 (MISCELLANEOUS)TRU5Digioia-Suburban Excavating LLC$1,860,662$1,966,473+6.0%-8.0%ODOT
233004STA-US 30-32.63 (BRIDGE REPAIR)STA1Beaver Excavating Company$1,635,501+7.0%ODOT
230267ROS-SR 772/SR 50-10.30/23.37 (TWO LANE RESURFACING)ROS2Shelly & Sands Inc$1,591,521$1,596,7940.0%+11%ODOT
230274CLI-IR 71-11.21 Weigh Station (PARKING AREAS)CLI5R B Jergens Contractors Inc$1,573,811$1,633,815+4.0%+6.0%ODOT
230247ASD-/RIC-CHIP FY2023 (CHIP SEAL)ASD4Allied Construction, LLC$1,444,055$1,561,699+8.0%-11%ODOT
230276D09-BH-FY2023 (BRIDGE REPAIR)District 93Axis Civil Construction LLC$1,417,014$1,450,319+2.0%+18%ODOT
230259HAM-IR 75-05.53 (SLIDE REPAIR)HAM2John R Jurgensen Company$1,385,386$1,641,349+18%+87%ODOT
230275D07-PPM FY23 (PAVEMENT MARKING)District 72The Aero-Mark Company LLC$1,234,568$1,494,497+21%-9.0%ODOT
230251BUT-CR 19-05.88 (BIKEWAYS)BUT5R B Jergens Contractors Inc$1,229,103$1,340,384+9.0%+6.0%ODOT
230260HIG-SR 41-08.67 (CULVERT REPLACEMENT)HIG3Axis Civil Construction LLC$1,145,471$895,004-22%+15%ODOT
230262LIC-CR 813/MR 491-01.03/00.43 (CULVERT REPLACEMENT)LIC3Eclipse Co LLC$1,111,380$1,228,898+11%+5.0%ODOT
230252COL-Park Drive Bridge (BRIDGE REPLACEMENT (1 BRIDGE))COL2A P O'Horo Company$936,000$1,031,223+10%-13%ODOT
234014D12-GR FY2023 (GUARDRAIL REBUILDING)District 121Cuyahoga Fence LLC$920,108+3.0%ODOT
230266SUM-/POR-CR 10/45-00.00/03.33 (TWO LANE RESURFACING)SUM5Barbicas Construction Company Inc$793,071$806,723+2.0%+10%ODOT
230263MEG-TR 109/TR 126-00.58/00.58 (BRIDGE REPLACEMENT (2 BRIDGES))MEG2D G M Inc$767,925$964,709+26%+4.0%ODOT
230270SUM-CR 662-00.00 (4th St) (TWO LANE RESURFACING)SUM4Karvo Companies Inc$665,009$696,903+5.0%+4.0%ODOT
230268SCI-US 23-16.41 (CULVERT REPLACEMENT)SCI2Axis Civil Construction LLC$663,636$733,871+11%+2.0%ODOT
230250BEL-US 250-06.45 (SLIDE REPAIR)BEL5Dennison Bridge Inc$442,449$443,3280.0%-7.0%ODOT
230282SCI-Shawnee SF (CULVERT REPLACEMENT)SCI4Coopers Excavating LLC$433,976$435,6070.0%-12%ODOT
230261JEF-SR 164-08.80 (SLIDE REPAIR)JEF5Ohio-West Virginia Excavating Co$427,234$538,811+26%-20%ODOT
230277D10-RPM FY2023 (RAISED PAVEMENT MARKERS)District 102W L Markers Inc$372,448$390,998+5.0%-5.0%ODOT
230280GEA-TSG FY2023 (SIGNALIZATION)GEA3Perram Electric Inc$344,344$348,000+1.0%0.0%ODOT
234015RIC-SR 98-00.37 (CULVERT REPLACEMENT)RIC2Crawford Construction Company Inc$269,536$298,400+11%+1.0%ODOT
230281MOT-Second St Market Parking Lot (SPOT PATCHING / PAVEMENT REPAIR)MOT2Barrett Paving Materials Inc$246,649$288,174+17%+7.0%ODOT
238004MOT-Market St. Resurfacing (TWO LANE RESURFACING)MOT2Walls Bros Asphalt Co Inc$195,306$218,477+12%+14%ODOT
ODOT contracts let on April 27, 2023, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy