Allied Construction, LLC: ODOT bid record

Allied Construction, LLC submitted 20 bids on Ohio DOT contracts in the data, from 17 FEB 2022 to 11 JAN 2024, and was the low bidder on 6 of them (30%). When it was not low, its total sat a median +23% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,452,457
Latest bid
11 JAN 2024
Data through
12 NOV 2026
20Bids
6Low bids
30Win rate, percent
+23%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
202210220%
20239444%
2024100%
Allied Construction, LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BRO4250%
PIK3133%
District 7200%
LAW2150%
ATH100%
SCI100%
CLI100%
District 10100%
HOC100%
ASD11100%
COS100%
ALL11100%
Allied Construction, LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH99 (100%)$1.00$1.00
RPM621E00100EACH178 (47%)$35.00$52.92
Center line, type 1642E00300MI178 (47%)$1,100.00$5,500.00
Stop line, type 1642E00500FT117 (64%)$5.00$5.00
Aggregate, single chip seal, type A422E11000SY126 (50%)$0.68$1.06
Work zone marking sign614E12460EACH116 (55%)$105.00$92.00
Edge line, 6", type 1642E00104MI165 (31%)$852.50$3,200.00
Fog seal886E11000GAL105 (50%)$2.98$3.20
Water659E35000MGAL75 (71%)$1.00$1.00
Work zone center line, class III, 642 paint614E21550MI124 (33%)$974.50$1,186.00
Commercial fertilizer659E20000TON73 (43%)$800.00$850.00
Lime659E31000ACRE63 (50%)$110.90$150.00
Allied Construction, LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Allied Construction, LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
11 JAN 2024240014JEFJEF-SR 152-06.45 (CHIP SEAL)3 of 3$1,342,577+76%
28 SEP 2023230453PIKPIK-CR 50-02.55 OH18-01 (SLIDE REPAIR)9 of 9$1,846,776+64%
14 SEP 2023230442ALLALL-SR 115-01.11 (SLIDE REPAIR)1 of 6$600,000Low, 16% under the second
24 AUG 2023230422BROBRO-SR 131/SR 251-03.89/00.00 (CHIP SEAL)1 of 3$500,648Low, 5.0% under the second
27 JUL 2023230401LAWLAW-/SCI-SR 93/SR 217/SR 218/SR 348-21.52/05.70 (CHIP SEAL)1 of 2$1,409,811Low, 4.0% under the second
22 JUN 2023230364COSCOS-/LIC-SR 79/SR 657-00.00/00.00 (CHIP SEAL)4 of 4$1,599,431+10%
27 APR 2023230247ASDASD-/RIC-CHIP FY2023 (CHIP SEAL)1 of 4$1,444,055Low, 8.0% under the second
13 APR 2023230220LAWLAW-US 52-17.57 Slide Repair (SLIDE REPAIR)5 of 5$1,507,976+64%
30 MAR 2023230181District 7D07-CHIP-FY23 (B) (CHIP SEAL)3 of 5$798,139+11%
30 MAR 2023230193PIKPIK-SR 772-02.09 (CHIP SEAL)2 of 4$510,963+5.0%
03 NOV 2022220572District 7D07-CHIP-FY23 (C) (CHIP SEAL)5 of 5$1,107,463+26%
03 NOV 2022220578HOCHOC-SR 216/SR 595-00.10/00.80 (CHIP SEAL)3 of 3$762,671+21%
13 OCT 2022220546District 10D10-Chip Seal FY2023 North (CHIP SEAL)2 of 2$2,427,206+3.0%
25 AUG 2022220480CLICLI-/GRE-CHIP FY2022 (CHIP SEAL)2 of 4$1,133,413+6.0%
11 AUG 2022220470SCISCI-SR 73-11.95 (CHIP SEAL)3 of 4$601,221+9.0%
26 MAY 2022220355BROBRO-US 62-10.75 (SLIDE REPAIR)4 of 5$656,511+24%
14 APR 2022220249PIKPIK-CR 50-03.32 OH16-01 (SLIDE REPAIR)1 of 6$802,334Low, 10% under the second
14 APR 2022220258ATHATH-SR 329-05.26 (SLIDE REPAIR)3 of 7$2,356,363+24%
17 FEB 2022220081BROBRO-SR 286/SR 763/SR 774-00.00 (CHIP SEAL)1 of 4$695,609Low, 16% under the second
17 FEB 2022220114BROBRO-US 52-16.22 Slide (SLIDE REPAIR)5 of 5$1,352,558+31%
Allied Construction, LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy