ODOT letting results, April 13, 2023
38 contracts let by Ohio DOT on April 13, 2023, $54,694,917 in low bids, a median of 3 bidders per contract. On the 38 with an engineer's estimate, the low bid came in under it 19 times; median low bid -1.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 38
- Low bids, total
- $54,694,917
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230180 | CUY-SR 8/SR 10-02.26/08.69 (BRIDGE REPAIR) | CUY | 2 | Corrosion Resistance LTD | $9,364,862 | $10,313,433 | +10% | +31% | ODOT |
| 230226 | MUS-SR 60-14.61/17.93 (TWO LANE RESURFACING) | MUS | 3 | Shelly Company | $5,373,523 | $5,777,218 | +8.0% | +17% | ODOT |
| 230222 | LOG-US 33/SR 47/SR 235/SR 540-VAR (TWO LANE RESURFACING) | LOG | 1 | Shelly Company | $4,951,403 | +10% | ODOT | ||
| 230234 | CUY-IR 90-03.65 Super (MISCELLANEOUS) | CUY | 1 | Shelly Company | $4,692,395 | +31% | ODOT | ||
| 230231 | WAR-IR 71-01.69/11.04/13.71 (BRIDGE REPAIR) | WAR | 4 | Prus Construction Company | $4,208,147 | $4,309,753 | +2.0% | +33% | ODOT |
| 230225 | MOT-SR 48-01.02 (INTERSECTION) | MOT | 3 | Barrett Paving Materials Inc | $2,565,165 | $2,671,934 | +4.0% | +15% | ODOT |
| 230227 | NOB-CR 47-03.49 (BRIDGE REPLACEMENT (1 BRIDGE)) | NOB | 3 | Complete General Construction Company | $2,183,186 | $2,213,393 | +1.0% | +2.0% | ODOT |
| 230221 | LAW-SR 775-01.20 (TWO LANE RESURFACING) | LAW | 1 | Shelly Company | $1,987,310 | +19% | ODOT | ||
| 230218 | HEN-SR 110-06.72 Resurfacing (TWO LANE RESURFACING) | HEN | 2 | Shelly Company | $1,807,577 | $1,855,939 | +3.0% | +9.0% | ODOT |
| 230217 | HAM-SIGNS FY 2022 (SIGNING) | HAM | 2 | A & A Safety Inc | $1,783,936 | $1,978,775 | +11% | +4.0% | ODOT |
| 230207 | ATB-US 6/SR 7-20.28/VAR (TWO LANE RESURFACING) | ATB | 3 | Ronyak Paving Inc | $1,392,100 | $1,747,005 | +25% | -11% | ODOT |
| 230206 | ADA-SR 770-03.41 (BRIDGE REPLACEMENT (1 BRIDGE)) | ADA | 4 | Allard Excavation LLC | $1,368,843 | $1,460,777 | +7.0% | -3.0% | ODOT |
| 238001 | HAR-CR 75-18.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | HAR | 3 | Miller Bros Const Inc | $1,285,207 | $1,317,419 | +3.0% | -5.0% | ODOT |
| 230224 | MOT-Free Pike Resurfacing (TWO LANE RESURFACING) | MOT | 2 | John R Jurgensen Company | $1,050,648 | $1,321,617 | +26% | -7.0% | ODOT |
| 230220 | LAW-US 52-17.57 Slide Repair (SLIDE REPAIR) | LAW | 5 | Allard Excavation LLC | $918,923 | $1,048,959 | +14% | -4.0% | ODOT |
| 230237 | JEF-CR 10-02.10 (SPOT PATCHING / PAVEMENT REPAIR) | JEF | 3 | Cast & Baker Corporation | $876,588 | $878,982 | 0.0% | +11% | ODOT |
| 230242 | TRU-SR 7-12.64 (TWO LANE RESURFACING) | TRU | 3 | Shelly & Sands Inc | $854,625 | $1,048,967 | +23% | -19% | ODOT |
| 230235 | CUY-SIGN FY2023 (SIGNING) | CUY | 2 | M P Dory Co | $612,658 | $656,195 | +7.0% | -11% | ODOT |
| 230210 | CLA-SR 235-03.95 (TWO LANE RESURFACING) | CLA | 3 | Shelly Company | $607,170 | $658,586 | +8.0% | +12% | ODOT |
| 230209 | CHP-US 36-14.04 (TWO LANE RESURFACING) | CHP | 3 | A & B Asphalt Corporation | $550,128 | $558,243 | +1.0% | +1.0% | ODOT |
| 230208 | BEL-US 250-07.90 (SLIDE REPAIR) | BEL | 6 | Dennison Bridge Inc | $503,740 | $535,034 | +6.0% | -11% | ODOT |
| 230203 | NOB-CR 5A-00.00 (CHIP SEAL) | NOB | 2 | Shelly Company | $485,973 | $558,306 | +15% | -8.0% | ODOT |
| 230241 | SCI-US 52-35.72- Bridge Repair (BRIDGE REPAIR) | SCI | 1 | Evers Steel Construction LLC | $477,236 | +31% | ODOT | ||
| 230238 | LIC-SR 16-29.80 (BRIDGE REPAIR) | LIC | 2 | Suburban Maintenance & Construction Inc | $473,249 | $548,624 | +16% | -2.0% | ODOT |
| 230223 | MEG-TR 231-00.93 (BRIDGE REPLACEMENT (1 BRIDGE)) | MEG | 2 | D G M Inc | $462,899 | $598,850 | +29% | -8.0% | ODOT |
| 230211 | CLE-US 52/SR 232-12.89/01.54 (CULVERT REPLACEMENT) | CLE | 4 | Axis Civil Construction LLC | $453,108 | $529,097 | +17% | +5.0% | ODOT |
| 230228 | PER-SR 13-05.74 (CULVERT REPLACEMENT) | PER | 4 | Axis Civil Construction LLC | $443,723 | $463,854 | +5.0% | +22% | ODOT |
| 230229 | RIC-BH FY2023 (CULVERT REPLACEMENT) | RIC | 3 | BCC Ohio Inc | $436,036 | $530,340 | +22% | -21% | ODOT |
| 238000 | ALL-SRTS Delphos (SIDEWALK) | ALL | 2 | Fenson Contracting LLC | $420,820 | $491,093 | +17% | -9.0% | ODOT |
| 230214 | ERI-SR 2-29.50 (LIGHTING) | ERI | 2 | Perram Electric Inc | $419,779 | $459,500 | +9.0% | -15% | ODOT |
| 230215 | GAL-US 35-15.96 (SPOT PATCHING / PAVEMENT REPAIR) | GAL | 2 | Shelly Company | $315,302 | $389,933 | +24% | 0.0% | ODOT |
| 230230 | SUM-Valley View Rd (Macedonia) (TWO LANE RESURFACING) | SUM | 5 | Chagrin Valley Paving Inc | $295,056 | $296,145 | 0.0% | -11% | ODOT |
| 238002 | PIC-SR 56-20.41 (SLIDE REPAIR) | PIC | 4 | Complete General Construction Company | $252,292 | $307,173 | +22% | +1.0% | ODOT |
| 230213 | D02-TSG FY2023 (SIGNALIZATION) | District 2 | 4 | Fet Construction Services LLC | $248,115 | $259,292 | +5.0% | -14% | ODOT |
| 230239 | ROS-Tar Hollow ODNR FY23 (CULVERT REPLACEMENT) | ROS | 4 | Skeens Excavating Inc | $226,791 | $306,590 | +35% | -46% | ODOT |
| 230240 | SCI-Shawnee State Forest ODNR (TWO LANE RESURFACING) | SCI | 2 | Shelly Company | $167,782 | $191,311 | +14% | +27% | ODOT |
| 230219 | HOL-US 62-20.66 (CULVERT REPLACEMENT) | HOL | 4 | BCC Ohio Inc | $107,738 | $127,405 | +18% | -18% | ODOT |
| 230233 | CHP-SR 29-15.69 (BRIDGE REPAIR) | CHP | 2 | BCC Ohio Inc | $70,883 | $237,697 | +235% | -11% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.