Fet Construction Services LLC: ODOT bid record

Fet Construction Services LLC submitted 15 bids on Ohio DOT contracts in the data, from 21 MAY 2020 to 22 AUG 2024, and was the low bidder on 3 of them (20%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$845,464
Latest bid
22 AUG 2024
Data through
12 NOV 2026
15Bids
3Low bids
20Win rate, percent
+6.0%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20203133%
2021500%
20222150%
20233133%
2024200%
Fet Construction Services LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
LUC7114%
District 26233%
District 1100%
WOO100%
Fet Construction Services LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1111 (100%)$1.00$1.00
Special - routine maintenance and inspection, pump690E98000EACH129 (75%)$460.00$500.00
Trench625E29000FT76 (86%)$5.00$12.00
Uninterruptible power supply (UPS), 1000 watt, as per plan633E75001EACH95 (56%)$5,864.00$6,500.00
Cabinet foundation, as per plan633E67101EACH85 (63%)$1,309.50$2,635.50
Law enforcement officer with patrol car for assistance614E11110HR75 (71%)$60.50$80.00
Commercial fertilizer659E20000TON94 (44%)$682.00$850.00
Topsoil659E00300CY74 (57%)$21.50$45.00
Cabinet, type TS-2, as per plan633E65511EACH73 (43%)$10,731$15,750
Conduit, 4", 725.051625E25604FT73 (43%)$13.00$17.50
Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan632E05007EACH63 (50%)$715.50$925.30
Stop line radar detection, as per plan809E69101EACH53 (60%)$8,753.00$8,500.00
Fet Construction Services LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
U S Utility Contractor Company114 of 11
Perram Electric Inc107 of 10
Miller Cable Company94 of 9
U S Utility Electrical Services Corp33 of 3
Asplundh Construction LLC11 of 1
Complete General Construction Company11 of 1
J Ranck Electric Inc11 of 1
Fet Construction Services LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
22 AUG 2024240409District 2D02-LG FY2025 (LIGHTING)2 of 3$1,196,833+7.0%
22 FEB 2024240133District 2D02-TSG FY2024 (SIGNALIZATION)2 of 4$363,101+5.0%
14 SEP 2023230454WOOWOO-SR 795-03.26 Intrsect Upgrade (SIGNALIZATION)4 of 4$381,331+12%
10 AUG 2023230426LUCLUC-/OTT-IR 280/SR 65/SR 163-FY24 Elec Mnt (BRIDGE REPAIR)2 of 2$149,764+4.0%
13 APR 2023230213District 2D02-TSG FY2023 (SIGNALIZATION)1 of 4$248,115Low, 5.0% under the second
28 JUL 2022220457LUCLUC-/OTT-IR 280/SR 65/SR 163-FY23 Elec Mnt (BRIDGE REPAIR)1 of 1$125,564Low
12 MAY 2022220312District 2D02-TSG FY2022 (SIGNALIZATION)3 of 4$335,750+4.0%
02 DEC 2021210635LUCLUC-CR 10-04.94 Lsky/Lewis Sfty (INTERSECTION)3 of 3$709,818+15%
18 NOV 2021210610LUCLUC-CR 10-00.85 Lasky/Talmge Sfty (INTERSECTION)2 of 4$430,896+1.0%
16 SEP 2021210500LUCLUC-/OTT-IR 280/SR 65/SR 163-FY22 Elec Mnt (BRIDGE REPAIR)2 of 2$128,6950.0%
25 FEB 2021210120District 2D02-TSG FY2021 (SIGNALIZATION)3 of 4$257,717+18%
14 JAN 2021210027LUCLUC-US 20-09.10 @McCord Sfty Grp A (SIGNALIZATION)3 of 4$443,848+14%
19 NOV 2020200539District 1D01-Lighting Upgrade FY2021 (LIGHTING)5 of 6$2,062,159+18%
27 AUG 2020200451LUCLUC-/OTT-IR 280/SR 65/SR 163 FY21 Elec Mnt (BRIDGE REPAIR)2 of 2$119,872+2.0%
21 MAY 2020200289District 2D02-TSG FY2020 (SIGNALIZATION)1 of 4$471,785Low, 2.0% under the second
Fet Construction Services LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy