Asplundh Construction LLC: ODOT bid record
Asplundh Construction LLC submitted 43 bids on Ohio DOT contracts in the data, from 23 APR 2020 to 09 OCT 2025, and was the low bidder on 7 of them (16%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $5,012,869
- Latest bid
- 09 OCT 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 2 | 25% |
| 2021 | 13 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
| 2023 | 5 | 2 | 40% |
| 2024 | 7 | 1 | 14% |
| 2025 | 7 | 2 | 29% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 11 | 2 | 18% |
| District 6 | 7 | 3 | 43% |
| District 8 | 3 | 0 | 0% |
| BEL | 2 | 0 | 0% |
| District 10 | 2 | 1 | 50% |
| District 1 | 2 | 0 | 0% |
| District 11 | 2 | 0 | 0% |
| LOR | 2 | 0 | 0% |
| DEL | 1 | 0 | 0% |
| WAR | 1 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
| HOL | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 37 | 37 (100%) | $1.00 | $1.00 |
| Luminaire, conventional, solid state (LED), as per plan | 625E26253 | EACH | 40 | 19 (48%) | $381.85 | $500.00 |
| Connection, fused pull apart | 625E00450 | EACH | 20 | 14 (70%) | $87.25 | $122.84 |
| Connection, unfused permanent | 625E00480 | EACH | 19 | 11 (58%) | $103.43 | $120.00 |
| Ground rod | 625E32000 | EACH | 22 | 9 (41%) | $203.88 | $285.00 |
| Trench | 625E29000 | FT | 17 | 8 (47%) | $5.87 | $12.00 |
| Ground rod, as per plan | 625E32001 | EACH | 12 | 8 (67%) | $200.50 | $280.00 |
| Connection, unfused pull apart | 625E00460 | EACH | 9 | 7 (78%) | $84.81 | $120.00 |
| Conduit, 2", 725.051 | 625E25408 | FT | 7 | 6 (86%) | $4.39 | $9.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 35 | 5 (14%) | $80.00 | $80.00 |
| Pull box, 725.08, 18" | 625E30700 | EACH | 19 | 5 (26%) | $1,060.70 | $1,000.00 |
| Repair integral luminaire lowering mechanism of tower lighting fixture, as per plan | 625E50401 | EACH | 14 | 5 (36%) | $2,863.39 | $3,957.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perram Electric Inc | 37 | 27 of 37 |
| Miller Cable Company | 31 | 18 of 31 |
| Complete General Construction Company | 28 | 16 of 28 |
| Cornerstone Electric Inc | 10 | 8 of 10 |
| U S Utility Contractor Company | 10 | 3 of 10 |
| Greenwich Electric Inc | 8 | 5 of 8 |
| Capital Electric Line Builders Inc | 7 | 3 of 7 |
| J Ranck Electric Inc | 7 | 0 of 7 |
| Ruhlin Company | 7 | 2 of 7 |
| Bansal Construction Inc | 4 | 1 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 OCT 2025 | 250461 | District 3 | D03-TSG FY2026 (M) (SIGNALIZATION) | 5 of 6 | $381,827 | +29% |
| 25 SEP 2025 | 250446 | District 3 | D03-TSG Radar FY2026 (SIGNALIZATION) | 2 of 6 | $231,000 | +10% |
| 17 JUL 2025 | 250343 | CUY | CUY-Mayfield Hts Signals (SIGNALIZATION) | 4 of 4 | $3,470,652 | +54% |
| 17 JUL 2025 | 250351 | District 6 | D06-ITS MAINT-FY2026 (SIGNALIZATION) | 1 of 7 | $1,202,169 | Low, 15% under the second |
| 27 MAR 2025 | 250171 | District 2 | D02-TSG FY2025 (SIGNALIZATION) | 5 of 5 | $487,453 | +21% |
| 27 MAR 2025 | 250175 | District 8 | D08-LG LED FY25 (LIGHTING) | 3 of 6 | $722,085 | +64% |
| 16 JAN 2025 | 250030 | District 7 | D07-ITS Maint-FY 2025 (SIGNALIZATION) | 1 of 5 | $809,467 | Low, 9.0% under the second |
| 19 DEC 2024 | 240595 | District 3 | D03-TSG FY2025 (M) (SIGNALIZATION) | 4 of 5 | $198,001 | +27% |
| 14 NOV 2024 | 240536 | District 3 | D03-LG TSG RM FY2025 (SIGNALIZATION) | 1 of 2 | $349,940 | Low, 1.0% under the second |
| 17 OCT 2024 | 240480 | District 6 | D06-ELEC FY25 (LIGHTING) | 3 of 4 | $598,717 | +10% |
| 26 SEP 2024 | 240454 | District 3 | D03-LG FY2025(A) (LIGHTING) | 5 of 6 | $131,959 | +38% |
| 22 AUG 2024 | 240411 | District 11 | D11-LG-FY2025 (LIGHTING) | 2 of 2 | $858,756 | +35% |
| 27 JUN 2024 | 240350 | MRG | MRG-/WAS-SR 266/SR 339-04.13/20.12 (LIGHTING) | 3 of 4 | $136,046 | +29% |
| 09 MAY 2024 | 240295 | District 12 | D12-D4/D12 ITS Camera Additions (SIGNALIZATION) | 4 of 5 | $4,837,487 | +14% |
| 14 DEC 2023 | 230595 | District 10 | D10-Lighting FY2024 (LIGHTING) | 1 of 5 | $1,170,556 | Low, 4.0% under the second |
| 30 NOV 2023 | 230585 | LOR | LOR-SR 2-01.51 (LIGHTING) | 4 of 6 | $377,848 | +21% |
| 09 NOV 2023 | 230544 | LOR | LOR-/MED-TSG FY2024 (SIGNALIZATION) | 3 of 7 | $177,311 | +5.0% |
| 26 OCT 2023 | 230528 | District 3 | D03-TSG FY2024(C) (SIGNALIZATION) | 1 of 5 | $91,866 | Low, 14% under the second |
| 12 OCT 2023 | 230506 | District 6 | D06-ELEC FY24 (LIGHTING) | 3 of 3 | $492,215 | +13% |
| 14 JUL 2022 | 220431 | District 1 | D01-Lighting Optimization W Ohio (LIGHTING) | 3 of 4 | $6,431,837 | +15% |
| 26 MAY 2022 | 220325 | District 5 | D05-Statewide Lighting Optimization SE Ohio | 2 of 9 | $6,004,201 | +18% |
| 13 JAN 2022 | 220028 | District 3 | D03-LG FY2022(A) (LIGHTING) | 3 of 4 | $217,494 | +10% |
| 28 OCT 2021 | 210579 | MED | MED-SR 57-03.19 TSG (SIGNALIZATION) | 4 of 7 | $327,078 | +12% |
| 16 SEP 2021 | 210487 | ALL | ALL-SR 81/SR 117/SR 309-Signals (SIGNALIZATION) | 6 of 6 | $750,701 | +27% |
| 16 SEP 2021 | 210499 | District 11 | D11-LG-FY2022 (LIGHTING) | 2 of 2 | $615,213 | +50% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.