ODOT contract 250461 bid tabulation

D03-TSG FY2026 (M) (SIGNALIZATION). Let by Ohio DOT on October 9, 2025, District 3. 6 bids received; low bid $296,336 by Greenwich Electric Inc, -22% against the engineer's estimate of $380,000.

Owner
Ohio DOT
Letting
09 OCT 2025
Pay items
39
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Greenwich Electric Inc$296,336Low-22%
2Perram Electric Inc$303,579+2.0%-20%
3Miller Cable Company$329,146+11%-13%
4Complete General Construction Company$363,426+23%-4.0%
5Asplundh Construction LLC$381,827+29%0.0%
6U S Utility Contractor Company$435,423+47%+15%
ODOT contract 250461: bids by rank

Engineer's estimate: $380,000.

Bid tabulation

LinePay itemUnitQuantity1. Greenwich Electric Inc2. Perram Electric Inc3. Miller Cable Company4. Complete General Construction Company5. Asplundh Construction LLC6. U S Utility Contractor Company
1Erosion control (832E30000)EACH1,500$1.00$1.00$1.00$1.00$1.00$1.00
2Conduit, 3", 725.04 (625E25500)FT10$50.00$59.80$28.00$85.00$37.00$34.82
3Pull box removed (625E31510)EACH17$230.00$192.00$200.00$425.00$336.00$447.50
4Ground rod (625E32000)EACH1$310.00$317.00$300.00$400.00$292.00$273.75
5Light pole removed (625E75400)EACH1$250.00$384.00$100.00$400.00$596.00$635.00
6Light pole foundation removed (625E75500)EACH1$788.00$576.00$250.00$1,000.00$1,267.00$635.00
7Power service removed, as per plan (625E75511)EACH1$950.00$1,060.00$350.00$750.00$1,139.00$837.50
8Disconnect circuit (625E75800)EACH1$350.00$192.00$100.00$500.00$149.00$38.25
9Sign flasher assembly, as per plan (631E92001)EACH4$5,769.80$5,244.00$5,700.00$5,300.00$5,321.00$6,785.80
10School speed limit sign assembly, solar-powered, as per plan (631E93241)EACH4$4,505.90$4,406.00$4,600.00$5,000.00$6,098.00$8,263.85
11Removal, misc.: school speed limit sign assembly (631E94490)EACH4$375.00$384.00$400.00$540.00$285.00$895.00
12Sign lighting misc.: RTC timer and modem (631E97700)EACH2$2,050.45$2,167.00$2,450.00$2,300.00$2,483.00$2,180.45
13Sign lighting, misc.: cable removed (631E97900)FT1,874$1.10$0.61$0.70$2.50$2.00$1.23
14Vehicular signal head, misc.: removal (632E04000)EACH120$56.00$96.00$50.00$120.00$36.00$260.00
15Vehicular signal head, (LED), 1-section, 12" lens, 1-way, polycarbonate, as per plan (632E04803)EACH8$573.20$619.00$575.00$725.00$840.00$1,011.05
16Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007)EACH130$907.15$1,005.50$1,200.00$1,200.00$1,463.00$1,300.85
17Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087)EACH3$1,568.75$1,797.00$1,850.00$2,000.00$2,289.00$2,127.75
18Relamp existing signal section with LED lamp unit, as per plan (632E10101)EACH14$123.90$111.00$115.00$136.00$124.00$194.40
19Relamp existing signal section with LED lamp unit, as per plan (632E10101)EACH14$123.90$111.00$115.00$136.00$124.00$194.40
20Relamp existing signal section with LED lamp unit, as per plan (632E10101)EACH14$123.90$111.00$115.00$136.00$124.00$194.40
21Messenger wire, misc.: unlash and relash (632E30500)FT315$5.60$5.96$4.50$11.00$3.00$8.30
22Signal cable, 5 conductor, no. 14 AWG, as per plan (632E40501)FT1,783$3.20$3.62$2.65$3.00$3.00$2.51
23Signal support foundation (632E64010)EACH1$1,800.00$2,136.00$1,500.00$3,600.00$5,388.00$1,787.50
24Power cable, 2 conductor, no. 6 AWG, as per plan (632E68201)FT100$5.15$5.50$5.25$5.00$7.00$4.55
25Reuse of signal support, as per plan (632E90207)EACH1$300.00$768.00$500.00$730.00$580.00$1,212.50
26Signalization, misc.: meter base (632E90400)EACH1$1,000.00$1,502.00$700.00$1,500.00$596.00$2,135.00
27Cabinet, type TS-2, as per plan (633E65511)EACH1$14,900$15,362$16,400$17,500$17,170$19,966
28Cabinet foundation (633E67100)EACH1$2,800.00$2,320.00$2,900.00$5,000.00$2,717.00$1,528.75
29Controller work pad (633E67200)EACH1$750.00$242.00$1,000.00$3,000.00$4,393.00$1,096.25
30Uninterruptible power supply (UPS), battery replacement (633E67500)EACH5$1,675.00$1,214.00$1,200.00$1,700.00$1,172.00$1,726.25
31Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH1$7,958.50$7,937.00$8,400.00$8,000.00$352.00$8,842.75
32Controller item, misc.: 12" cabinet riser (633E99000)EACH1$625.00$476.00$500.00$1,000.00$557.00$1,552.90
33Advance radar detection, as per plan (809E69001)EACH5$1,075.00$1,060.00$1,100.00$1,200.00$843.00$1,847.50
34Stop line radar detection, as per plan (809E69101)EACH4$1,075.00$1,060.00$1,100.00$1,200.00$763.00$1,847.50
35Law enforcement officer with patrol car for assistance (614E11110)HR200$75.00$85.00$75.00$90.00$91.00$89.13
36Premium for contract performance bond and for payment bond (103E05000)LS1$7,300.00$5,428.00$3,586.90$2,500.00$1,607.00$6,670.00
37Maintaining traffic (614E11000)LS1$9,300.00$5,072.00$8,500.00$10,000$1,179.00$11,085
38Construction layout stakes and surveying (623E10000)LS1$100.00$100.00$5,320.00$800.00$5,143.00$6,325.00
39Mobilization (624E10000)LS1$12,000$10,000$10,000$10,000$23,964$17,325
ODOT contract 250461: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy