Greenwich Electric Inc: ODOT bid record
Greenwich Electric Inc submitted 18 bids on Ohio DOT contracts in the data, from 15 OCT 2020 to 09 OCT 2025, and was the low bidder on 7 of them (39%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,691,315
- Latest bid
- 09 OCT 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 1 | 100% |
| 2021 | 4 | 1 | 25% |
| 2022 | 4 | 2 | 50% |
| 2023 | 4 | 1 | 25% |
| 2024 | 3 | 1 | 33% |
| 2025 | 2 | 1 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 8 | 3 | 38% |
| LOR | 3 | 0 | 0% |
| COS | 2 | 1 | 50% |
| MED | 1 | 0 | 0% |
| HOL | 1 | 1 | 100% |
| RIC | 1 | 1 | 100% |
| District 12 | 1 | 1 | 100% |
| HAN | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 15 | 15 (100%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 16 | 4 (25%) | $72.50 | $80.00 |
| Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan | 632E05007 | EACH | 8 | 4 (50%) | $839.50 | $925.30 |
| Relamp existing signal section with LED lamp unit, as per plan | 632E10101 | EACH | 19 | 3 (16%) | $76.00 | $83.25 |
| Sign, flat sheet | 630E80100 | SF | 7 | 3 (43%) | $27.00 | $24.00 |
| Connection, fused pull apart | 625E00450 | EACH | 6 | 3 (50%) | $116.00 | $122.84 |
| Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan | 632E05087 | EACH | 5 | 3 (60%) | $1,322.60 | $1,450.00 |
| Ground rod | 625E32000 | EACH | 12 | 2 (17%) | $290.00 | $285.00 |
| Controller work pad | 633E67200 | EACH | 9 | 2 (22%) | $450.00 | $825.00 |
| Trench | 625E29000 | FT | 7 | 2 (29%) | $12.00 | $12.00 |
| Underground warning marking tape | 625E36010 | FT | 6 | 1 (17%) | $1.07 | $1.50 |
| Cabinet foundation | 633E67100 | EACH | 6 | 1 (17%) | $2,900.00 | $2,760.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perram Electric Inc | 18 | 8 of 18 |
| Miller Cable Company | 17 | 5 of 17 |
| Asplundh Construction LLC | 8 | 3 of 8 |
| Complete General Construction Company | 8 | 0 of 8 |
| Cornerstone Electric Inc | 5 | 4 of 5 |
| J Ranck Electric Inc | 4 | 0 of 4 |
| Ruhlin Company | 3 | 0 of 3 |
| U S Utility Contractor Company | 2 | 1 of 2 |
| M P Dory Co | 2 | 0 of 2 |
| Shelly Company | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 OCT 2025 | 250461 | District 3 | D03-TSG FY2026 (M) (SIGNALIZATION) | 1 of 6 | $296,336 | Low, 2.0% under the second |
| 30 JAN 2025 | 250055 | LOR | LOR-IR 90-20.20 (LIGHTING) | 4 of 4 | $353,247 | +18% |
| 19 DEC 2024 | 240595 | District 3 | D03-TSG FY2025 (M) (SIGNALIZATION) | 1 of 5 | $155,423 | Low, 11% under the second |
| 17 OCT 2024 | 240462 | COS | COS-CR 271-06.26 (SIGNALIZATION) | 3 of 9 | $456,139 | +6.0% |
| 11 JUL 2024 | 240369 | LOR | LOR-TSG FY2025(B) (SIGNALIZATION) | 2 of 4 | $235,083 | +9.0% |
| 09 NOV 2023 | 230544 | LOR | LOR-/MED-TSG FY2024 (SIGNALIZATION) | 4 of 7 | $196,130 | +17% |
| 26 OCT 2023 | 230528 | District 3 | D03-TSG FY2024(C) (SIGNALIZATION) | 2 of 5 | $104,984 | +14% |
| 24 AUG 2023 | 230413 | COS | COS-VAR Signal Upgrades (SIGNALIZATION) | 1 of 6 | $591,511 | Low, 5.0% under the second |
| 10 AUG 2023 | 230415 | HAN | HAN-US 224-17.67 Signal (SIGNALIZATION) | 2 of 4 | $252,961 | 0.0% |
| 01 DEC 2022 | 220648 | District 3 | D03-TSG FY2023 (SIGNALIZATION) | 2 of 5 | $197,792 | +2.0% |
| 26 MAY 2022 | 220351 | RIC | RIC-SR 314-04.91 TSG (SIGNALIZATION) | 1 of 5 | $235,725 | Low, 1.0% under the second |
| 26 MAY 2022 | 220359 | District 12 | D12-TSG FY2022 (SIGNALIZATION) | 1 of 3 | $246,066 | Low, 8.0% under the second |
| 13 JAN 2022 | 220028 | District 3 | D03-LG FY2022(A) (LIGHTING) | 2 of 4 | $197,388 | 0.0% |
| 30 SEP 2021 | 210523 | District 3 | D03-TSG FY2022 (SIGNALIZATION) | 3 of 3 | $78,120 | +12% |
| 29 JUL 2021 | 210434 | District 3 | D03-LG FY2022 (LIGHTING) | 5 of 7 | $626,731 | +14% |
| 29 APR 2021 | 210267 | HOL | HOL-US 62-19.65 (SIGNALIZATION) | 1 of 5 | $66,467 | Low, 2.0% under the second |
| 28 JAN 2021 | 210065 | MED | MED-SR 3-14.95 (SIGNALIZATION) | 4 of 4 | $130,804 | +15% |
| 15 OCT 2020 | 200507 | District 3 | D03-TSG FY2021 (SIGNALIZATION) | 1 of 5 | $99,787 | Low, 5.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.