ODOT contract 250055 bid tabulation
LOR-IR 90-20.20 (LIGHTING). Let by Ohio DOT on January 30, 2025, LOR. 4 bids received; low bid $298,474 by Cornerstone Electric Inc, -19% against the engineer's estimate of $370,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 36
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Electric Inc | $298,474 | Low | -19% |
| 2 | Miller Cable Company | $303,500 | +2.0% | -18% |
| 3 | Perram Electric Inc | $334,034 | +12% | -10% |
| 4 | Greenwich Electric Inc | $353,247 | +18% | -5.0% |
Engineer's estimate: $370,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cornerstone Electric Inc | 2. Miller Cable Company | 3. Perram Electric Inc | 4. Greenwich Electric Inc |
|---|---|---|---|---|---|---|---|
| 1 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $500.00 | $5,000.00 | $1,400.00 | $2,400.00 |
| 2 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 3 | 4" conduit, type E, as per plan (611E00401) | FT | 260 | $4.50 | $1.90 | $6.75 | $9.75 |
| 4 | Connection, fused pull apart (625E00450) | EACH | 36 | $150.00 | $100.00 | $183.50 | $130.00 |
| 5 | Connection, unfused permanent (625E00480) | EACH | 78 | $100.00 | $100.00 | $128.50 | $115.00 |
| 6 | Light pole, conventional, AT12B35 (625E10490) | EACH | 5 | $3,250.00 | $3,200.00 | $2,820.00 | $3,050.00 |
| 7 | Light pole, conventional, AT15B35 (625E10490) | EACH | 9 | $3,500.00 | $3,300.00 | $2,880.00 | $3,115.00 |
| 8 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 14 | $1,250.00 | $1,550.00 | $1,435.00 | $1,450.00 |
| 9 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 4,092 | $2.68 | $3.00 | $2.95 | $3.60 |
| 10 | No. 10 AWG pole and bracket cable (625E23400) | FT | 2,655 | $1.20 | $2.00 | $0.92 | $1.50 |
| 11 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 5,461 | $9.00 | $13.00 | $11.08 | $11.20 |
| 12 | Conduit, 3", 725.04 (625E25500) | FT | 8 | $35.00 | $30.00 | $42.40 | $32.00 |
| 13 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 386 | $62.00 | $42.00 | $73.45 | $62.00 |
| 14 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 18 | $325.00 | $375.00 | $447.00 | $330.00 |
| 15 | Trench (625E29000) | FT | 5,173 | $9.00 | $5.00 | $7.81 | $8.90 |
| 16 | Pull box, 725.08, 18" (625E30700) | EACH | 8 | $1,200.00 | $850.00 | $1,270.00 | $1,050.00 |
| 17 | Pull box, 725.08, 24" (625E30706) | EACH | 5 | $1,400.00 | $1,100.00 | $1,445.00 | $1,250.00 |
| 18 | Pull box removed (625E31510) | EACH | 10 | $250.00 | $150.00 | $187.00 | $210.00 |
| 19 | Ground rod (625E32000) | EACH | 15 | $200.00 | $225.00 | $312.00 | $290.00 |
| 20 | Power service, as per plan (625E34001) | EACH | 1 | $6,500.00 | $6,800.00 | $9,400.00 | $9,545.00 |
| 21 | Underground warning marking tape (625E36010) | FT | 5,173 | $1.40 | $2.00 | $1.43 | $2.00 |
| 22 | Special - maintain existing lighting (625E40000) | LS | 1 | $2,000.00 | $100.00 | $750.00 | $1,500.00 |
| 23 | Light pole removed, as per plan (625E75401) | EACH | 14 | $500.00 | $200.00 | $455.00 | $325.00 |
| 24 | Light pole foundation removed (625E75500) | EACH | 14 | $250.00 | $200.00 | $560.00 | $425.00 |
| 25 | Luminaire removed for storage (625E75504) | EACH | 18 | $100.00 | $50.00 | $95.00 | $50.00 |
| 26 | Power service removed (625E75510) | EACH | 2 | $500.00 | $500.00 | $750.00 | $700.00 |
| 27 | Distribution cable removed (625E75550) | FT | 5,191 | $1.00 | $0.10 | $0.36 | $0.95 |
| 28 | Arc flash calculations and label, power service (625E76000) | EACH | 1 | $500.00 | $2,600.00 | $1,800.00 | $3,500.00 |
| 29 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $500.00 | $500.00 | $645.00 | $660.00 |
| 30 | Controller work pad (633E67200) | EACH | 1 | $1,200.00 | $400.00 | $260.00 | $750.00 |
| 31 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $65.00 | $80.00 | $55.00 | $80.00 |
| 32 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $2,800.00 | $3,419.90 | $5,583.94 | $9,500.00 |
| 33 | Maintaining traffic (614E11000) | LS | 1 | $2,500.00 | $6,500.00 | $4,500.00 | $8,800.00 |
| 34 | Field office, type B (619E16010) | MNTH | 4 | $500.00 | $850.00 | $3,280.00 | $2,400.00 |
| 35 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,000.00 | $8,100.00 | $2,100.00 | $5,800.00 |
| 36 | Mobilization (624E10000) | LS | 1 | $5,000.00 | $10,000 | $10,000 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.