M P Dory Co: ODOT bid record

M P Dory Co submitted 127 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 12 NOV 2026, and was the low bidder on 39 of them (31%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$41,829,833
Latest bid
12 NOV 2026
Data through
12 NOV 2026
127Bids
39Low bids
31Win rate, percent
+14%Median gap to the low bid when not low, 88 bids

By year

YearBidsLow bidsWin rate
202026519%
202117529%
202221733%
202319526%
202417635%
202517847%
202610330%
M P Dory Co, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 1014429%
District 514429%
FRA10880%
District 68113%
District 97343%
CUY6583%
District 76233%
District 4500%
LIC4375%
MRG300%
MEG2150%
District 11200%
M P Dory Co, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH7474 (100%)$1.00$1.00
Anchor assembly, MGS type T606E26550EACH6329 (46%)$1,150.00$1,260.00
Removal of ground mounted post support and disposal630E86002EACH4729 (62%)$15.00$23.50
Guardrail, type MGS with long posts606E15100FT4422 (50%)$21.00$23.60
Removal of ground mounted sign and reerection630E85100EACH3622 (61%)$50.00$75.00
Guardrail, type MGS606E15050FT5119 (37%)$20.00$22.73
Maintenance of traffic for shoulder closure614E13900EACH2519 (76%)$150.00$175.00
Guardrail rebuilt, type MGS, as per plan606E16051FT2318 (78%)$14.50$16.50
Guardrail removed202E38000FT5516 (29%)$2.50$2.50
Removal of ground mounted sign and disposal630E84900EACH4216 (38%)$12.00$20.00
Anchor assembly, MGS type B606E26050EACH3116 (52%)$2,050.00$2,225.00
Ground mounted support, no. 3 post630E03100FT3815 (39%)$12.50$15.20
M P Dory Co, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Lake Erie Construction Company11163 of 111
PDK Construction Inc2821 of 28
Cleveland Barricading Systems LLC2113 of 21
Cuyahoga Fence LLC1810 of 18
Perram Electric Inc1614 of 16
Complete General Construction Company1614 of 16
Miller Cable Company139 of 13
Jess Howard Electric Co51 of 5
A & A Safety Inc52 of 5
Trafftech Inc44 of 4
M P Dory Co, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260499DELDEL-/UNI-SIGN-FY2027 (SIGNING)3 of 3$792,822+92%
12 NOV 2026260522MUSMUS-Flat Sheet Signs 2027 (SIGNING)1 of 2$2,046,794Low, 13% under the second
01 OCT 2026260446District 9D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING)4 of 4$1,168,220+22%
16 JUL 2026260336District 5D05-GR FY2027 (Ding N Dent) (GUARDRAIL REBUILDING)2 of 2$1,296,346+10%
11 JUN 2026260289PERPER-CR VAR GR FY2027 (GUARDRAIL REBUILDING)2 of 3$249,7450.0%
11 JUN 2026260295District 6D06-GR-FY2027 (GUARDRAIL REBUILDING)2 of 2$899,476+8.0%
11 JUN 2026260300FRAFRA-GR-FY2027 (GUARDRAIL REBUILDING)1 of 2$1,858,557Low, 24% under the second
19 FEB 2026260082District 10D10-Extrusheet Sign FY2026 (SIGNING)1 of 2$1,072,887Low, 11% under the second
29 JAN 2026260073District 9D09-GR-FY2026 (GUARDRAIL REBUILDING)3 of 3$1,089,287+19%
15 JAN 2026260030WYAWYA-US 23-09.28 (SIGNING)3 of 3$388,930+54%
18 DEC 2025250584District 5D05-Guardrail FY2026 (GUARDRAIL REBUILDING)2 of 2$2,994,927+4.0%
18 DEC 2025250604District 7D07-GR FY 2026 (GUARDRAIL REBUILDING)1 of 2$511,844Low, 1.0% under the second
23 OCT 2025250494District 10D10-General System GR FY2026 (GUARDRAIL REBUILDING)2 of 3$2,419,389+8.0%
09 OCT 2025250483GUEGUE-Flat Sheet Signs 2026 (SIGNING)1 of 3$1,420,663Low, 7.0% under the second
14 AUG 2025250386FRAFRA-GR FY26 (GUARDRAIL REBUILDING)1 of 2$1,872,269Low, 15% under the second
26 JUN 2025250329District 5D05-GR FY2026 (Ding N Dent) (GUARDRAIL REBUILDING)3 of 3$1,218,491+6.0%
26 JUN 2025250331FRAFRA-IR 70-12.14 FEN (FENCING)1 of 2$168,837Low, 61% under the second
12 JUN 2025250313District 6D06-GR FY26 (GUARDRAIL REBUILDING)2 of 2$765,376+7.0%
22 MAY 2025250272COLCOL-US 30/VAR-25.09/VAR,TUS-IR 77-13.00 (SIGNING)1 of 2$1,722,285Low, 1.0% under the second
08 MAY 2025250247FRAFRA-US 23/VAR-23.26/VAR-SIGN (SIGNING)2 of 2$929,998+25%
08 MAY 2025250255LICLIC-SR 16-05.38 (MISCELLANEOUS)1 of 3$391,803Low, 4.0% under the second
08 MAY 2025250268District 12D12-SIGN FY2025 (SIGNING)2 of 2$343,821+4.0%
24 APR 2025250215District 5D05-Guardrail FY2025 (GUARDRAIL REBUILDING)1 of 3$1,859,786Low, 4.0% under the second
13 FEB 2025250110District 10D10-Extrusheet Sign FY2025 (SIGNING)1 of 2$813,279Low, 25% under the second
30 JAN 2025250045District 10D10-General System GR FY2025 (GUARDRAIL REBUILDING)2 of 3$2,415,809+8.0%
M P Dory Co: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way