ODOT contract 250110 bid tabulation
D10-Extrusheet Sign FY2025 (SIGNING). Let by Ohio DOT on February 13, 2025, District 10. 2 bids received; low bid $813,279 by M P Dory Co, -18% against the engineer's estimate of $996,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 43
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | M P Dory Co | $813,279 | Low | -18% |
| 2 | Lake Erie Construction Company | $1,014,550 | +25% | +2.0% |
Engineer's estimate: $996,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. M P Dory Co | 2. Lake Erie Construction Company |
|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 25 | $2.50 | $6.00 |
| 2 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $125.00 | $125.00 |
| 3 | Guardrail, type MGS (606E15050) | FT | 75 | $25.00 | $34.40 |
| 4 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,200.00 | $1,680.00 |
| 5 | Ground rod (625E32000) | EACH | 9 | $425.00 | $325.00 |
| 6 | Ground mounted support, no. 3 post (630E03100) | FT | 113 | $15.00 | $17.00 |
| 7 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 667.60 | $16.00 | $31.00 |
| 8 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 482.20 | $17.00 | $34.00 |
| 9 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 221.80 | $30.00 | $40.00 |
| 10 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 150.10 | $35.50 | $48.00 |
| 11 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 607.70 | $21.00 | $54.00 |
| 12 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 299.30 | $48.00 | $68.00 |
| 13 | Ground mounted support, pipe (630E08200) | EACH | 1 | $1,000.00 | $850.00 |
| 14 | Breakaway structural beam connection (630E09000) | EACH | 84 | $420.00 | $585.00 |
| 15 | Breakaway structural beam connection, as per plan (630E09001) | EACH | 2 | $1,250.00 | $1,150.00 |
| 16 | Triangular slip base connection (630E09050) | EACH | 1 | $250.00 | $550.00 |
| 17 | Overhead sign support, type TC-12.31, design 6 (630E72320) | EACH | 2 | $20,850 | $25,850 |
| 18 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 2 | $75,000 | $79,750 |
| 19 | Overhead sign support, type TC-15.116, design 3 (630E72430) | EACH | 1 | $112,750 | $126,150 |
| 20 | Overhead sign support, type TC-16.22, design 12 (630E72540) | EACH | 1 | $16,500 | $19,450 |
| 21 | Sign, flat sheet (630E80100) | SF | 109.63 | $17.50 | $20.00 |
| 22 | Sign, ground mounted extrusheet (630E80200) | SF | 3,964 | $21.00 | $24.00 |
| 23 | Sign, overhead extrusheet, as per plan (630E80225) | SF | 1,253 | $21.00 | $25.00 |
| 24 | Sign backing assembly (630E82000) | EACH | 1 | $275.00 | $195.00 |
| 25 | Ground mounted structural beam support foundation (630E84500) | EACH | 126 | $850.00 | $935.00 |
| 26 | Rigid overhead sign support foundation (630E84510) | EACH | 9 | $9,500.00 | $12,850 |
| 27 | Ground mounted pipe support foundation (630E84600) | EACH | 1 | $650.00 | $645.00 |
| 28 | Removal of ground mounted sign and disposal (630E84900) | EACH | 63 | $12.00 | $20.00 |
| 29 | Removal of ground mounted sign and reerection (630E85100) | EACH | 8 | $50.00 | $65.00 |
| 30 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 35 | $125.00 | $195.00 |
| 31 | Removal of ground mounted post support and disposal (630E86002) | EACH | 35 | $15.00 | $25.00 |
| 32 | Removal of ground mounted structural beam support (630E86102) | EACH | 96 | $200.00 | $245.00 |
| 33 | Removal of structure mounted sign and disposal (630E86310) | EACH | 3 | $300.00 | $275.00 |
| 34 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 16 | $300.00 | $380.00 |
| 35 | Removal of overhead sign support and disposal, type TC-16.21 (630E89704) | EACH | 3 | $1,750.00 | $1,275.00 |
| 36 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 2 | $1,750.00 | $1,975.00 |
| 37 | Removal of overhead sign support and disposal, type TC-7.65 (630E89802) | EACH | 2 | $2,500.00 | $2,620.00 |
| 38 | Removal of miscellaneous traffic control item - SI (630E89902) | EACH | 3 | $1,250.00 | $650.00 |
| 39 | Sign lighting misc.: - removal of sign lighting (631E97700) | EACH | 4 | $1,250.00 | $450.00 |
| 40 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 6 | $95.00 | $95.00 |
| 41 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $4,750.00 |
| 42 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $36,250 |
| 43 | Mobilization (624E10000) | LS | 1 | $10,000 | $28,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.