ODOT contract 250255 bid tabulation
LIC-SR 16-05.38 (MISCELLANEOUS). Let by Ohio DOT on May 8, 2025, LIC. 3 bids received; low bid $391,803 by M P Dory Co, +1.0% against the engineer's estimate of $388,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 79
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | M P Dory Co | $391,803 | Low | +1.0% |
| 2 | Jess Howard Electric Co | $408,328 | +4.0% | +5.0% |
| 3 | Complete General Construction Company | $455,649 | +16% | +17% |
Engineer's estimate: $388,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. M P Dory Co | 2. Jess Howard Electric Co | 3. Complete General Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,125.00 | $5,394.78 | $4,000.00 |
| 2 | Pavement removed (202E23000) | SY | 5 | $160.00 | $189.49 | $125.00 |
| 3 | Curb and gutter removed (202E32500) | FT | 17 | $31.00 | $39.32 | $38.00 |
| 4 | Removal misc.: mulch removed (202E98000) | LS | 1 | $460.00 | $605.30 | $1,200.00 |
| 5 | Removal misc.:parking block removal (202E98100) | EACH | 1 | $46.00 | $178.98 | $400.00 |
| 6 | Excavation (203E10000) | CY | 82 | $230.00 | $233.19 | $178.00 |
| 7 | Embankment (203E20000) | CY | 24 | $230.00 | $237.07 | $68.00 |
| 8 | Soil analysis test (659E00100) | EACH | 2 | $205.00 | $613.18 | $150.00 |
| 9 | Topsoil (659E00300) | CY | 82 | $125.00 | $85.83 | $90.00 |
| 10 | Seeding and mulching, class 1 (659E00500) | SY | 735 | $5.40 | $3.55 | $4.56 |
| 11 | Repair seeding and mulching (659E14000) | SY | 37 | $1.00 | $11.99 | $4.56 |
| 12 | Inter-seeding (659E15000) | SY | 37 | $0.01 | $11.99 | $4.56 |
| 13 | Commercial fertilizer (659E20000) | TON | 0.07 | $1,540.00 | $3,910.14 | $1,250.00 |
| 14 | Lime (659E31000) | ACRE | 0.15 | $205.00 | $1,859.87 | $150.00 |
| 15 | Water (659E35000) | MGAL | 4 | $1.00 | $222.38 | $1.00 |
| 16 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 | $1.00 |
| 17 | 6" conduit, type C (611E01100) | FT | 25 | $36.00 | $42.10 | $155.00 |
| 18 | 12" conduit, type B (611E04400) | FT | 89 | $115.00 | $117.28 | $298.00 |
| 19 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,700.00 | $2,921.08 | $4,200.00 |
| 20 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $1,025.00 | $1,118.44 | $2,500.00 |
| 21 | Inlet, misc.: replace catch basin top with 2-2A (611E99500) | EACH | 2 | $640.00 | $723.70 | $3,400.00 |
| 22 | Inlet, misc.:yard drain, type B (611E99500) | EACH | 4 | $1,740.00 | $2,559.22 | $3,200.00 |
| 23 | Pavement repair, as per plan (253E01001) | SY | 4 | $640.00 | $690.80 | $950.00 |
| 24 | Aggregate base (304E20000) | CY | 60 | $310.00 | $323.24 | $155.00 |
| 25 | 4" concrete walk (608E10000) | SF | 3,676 | $14.50 | $13.73 | $10.00 |
| 26 | Curb ramp (608E52000) | SF | 394 | $20.00 | $20.60 | $30.00 |
| 27 | Detectable warning (608E53020) | SF | 100 | $36.00 | $38.17 | $42.00 |
| 28 | Combination curb and gutter, type 2 (609E12000) | FT | 17 | $110.00 | $119.32 | $275.00 |
| 29 | Valve box adjusted to grade (638E10800) | EACH | 4 | $460.00 | $506.58 | $780.00 |
| 30 | Service box adjusted to grade (638E10900) | EACH | 1 | $614.00 | $763.20 | $945.00 |
| 31 | Ground mounted support, no. 3 post (630E03100) | FT | 75 | $24.00 | $11.61 | $49.00 |
| 32 | Sign post reflector (630E08600) | EACH | 1 | $50.00 | $200.04 | $250.00 |
| 33 | Sign support assembly, pole mounted (630E79500) | EACH | 4 | $225.00 | $101.32 | $425.00 |
| 34 | Sign, flat sheet (630E80100) | SF | 7.50 | $36.00 | $53.34 | $160.00 |
| 35 | Removal of ground mounted sign and reerection (630E85100) | EACH | 12 | $35.00 | $69.91 | $175.00 |
| 36 | Removal of ground mounted post support and disposal (630E86002) | EACH | 5 | $66.00 | $74.11 | $75.00 |
| 37 | Stop line (644E00500) | FT | 53 | $9.40 | $18.03 | $8.50 |
| 38 | Crosswalk line, 12" (644E00620) | FT | 219 | $4.40 | $5.24 | $4.00 |
| 39 | Transverse/diagonal line (644E00700) | FT | 60 | $9.40 | $10.52 | $8.50 |
| 40 | Removal of pavement marking (644E30020) | EACH | 2 | $670.00 | $1,513.18 | $605.00 |
| 41 | Conduit, 2", 725.04 (625E25400) | FT | 195 | $40.00 | $31.25 | $25.00 |
| 42 | Conduit, 4", 725.04 (625E25600) | FT | 16 | $66.00 | $180.70 | $68.00 |
| 43 | Trench (625E29000) | FT | 207 | $18.50 | $26.57 | $18.00 |
| 44 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $2,110.00 | $2,001.49 | $1,500.00 |
| 45 | Ground rod (625E32000) | EACH | 10 | $400.00 | $340.30 | $300.00 |
| 46 | Underground warning marking tape (625E36010) | FT | 207 | $1.20 | $0.75 | $1.75 |
| 47 | Arc flash calculations and label, traffic signal C (625E76000) | EACH | 1 | $3,800.00 | $121.10 | $4,000.00 |
| 48 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 4 | $1,270.00 | $1,651.09 | $1,200.00 |
| 49 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 4 | $2,230.00 | $2,027.71 | $2,000.00 |
| 50 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 6 | $690.00 | $626.64 | $700.00 |
| 51 | Covering of pedestrian signal head (632E25010) | EACH | 6 | $33.00 | $64.31 | $35.00 |
| 52 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 6 | $500.00 | $317.41 | $325.00 |
| 53 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,281 | $5.00 | $3.41 | $3.00 |
| 54 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 724 | $5.50 | $4.58 | $4.00 |
| 55 | Pedestal foundation (632E64020) | EACH | 6 | $1,750.00 | $1,144.21 | $1,700.00 |
| 56 | Test hole performed (632E64950) | EACH | 6 | $500.00 | $1,277.77 | $700.00 |
| 57 | Loop detector lead-in cable (632E65200) | FT | 1,257 | $3.20 | $2.05 | $2.25 |
| 58 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 183 | $5.00 | $5.37 | $4.25 |
| 59 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 30 | $7.50 | $19.78 | $5.25 |
| 60 | Power service, as per plan (632E70001) | EACH | 1 | $500.00 | $1,516.02 | $2,000.00 |
| 61 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $1,500.00 | $2,210.94 | $1,300.00 |
| 62 | Pedestal, 11', transformer base, as per plan (632E90001) | EACH | 6 | $2,200.00 | $1,775.79 | $2,000.00 |
| 63 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $2,500.00 | $12,071 | $6,000.00 |
| 64 | Reuse of traffic control itemwireless equipment (632E90104) | EACH | 1 | $500.00 | $76.34 | $1,000.00 |
| 65 | Reuse of controller, as per plan (632E90213) | EACH | 1 | $2,585.00 | $1,655.28 | $1,600.00 |
| 66 | Signalization, misc.:power meter cabinet, base mou (632E90400) | EACH | 1 | $5,700.00 | $5,133.96 | $6,000.00 |
| 67 | Signalization, misc.:unlash and relash messenger W (632E90400) | EACH | 225 | $2.50 | $17.53 | $4.00 |
| 68 | GPS (global positioning system) clock assembly (633E45000) | EACH | 1 | $650.00 | $2,037.47 | $650.00 |
| 69 | Cabinet foundation (633E67100) | EACH | 1 | $5,280.00 | $4,322.80 | $5,000.00 |
| 70 | Controller work pad, as per plan (633E67201) | EACH | 1 | $770.00 | $1,436.74 | $3,000.00 |
| 71 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $7,800.00 | $7,945.24 | $6,800.00 |
| 72 | Controller item, misc.:controller unit, type TS2/A (633E99000) | EACH | 1 | $29,200 | $26,708 | $30,000 |
| 73 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $9,500.00 | $9,094.00 | $8,800.00 |
| 74 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $90.00 | $101.33 | $81.00 |
| 75 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $2,400.00 | $4,080.00 | $2,400.00 |
| 76 | Maintaining traffic (614E11000) | LS | 1 | $2,000.00 | $7,763.20 | $30,000 |
| 77 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,500.00 | $6,081.60 | $19,200 |
| 78 | Mobilization (624E10000) | LS | 1 | $10,000 | $13,544 | $25,000 |
| 79 | Special - record construction drawings (690E98400) | LS | 1 | $1,650.00 | $2,049.60 | $6,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.