ODOT letting results, May 22, 2025

30 contracts let by Ohio DOT on May 22, 2025, $76,505,438 in low bids, a median of 2.5 bidders per contract. On the 30 with an engineer's estimate, the low bid came in under it 20 times; median low bid -8.0% against the estimate.

Owner
Ohio DOT
Contracts
30
Low bids, total
$76,505,438
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
250263UNI-US 42-03.91 (MINOR RECONSTRUCTION)UNI6Shelly Company$7,959,354$8,372,353+5.0%-13%ODOT
250275FRA-IR 70-15.52 (FOUR LANE RESURFACING)FRA3Shelly Company$7,366,774$7,630,656+4.0%+4.0%ODOT
250274ERI-SR 2-15.89 (MINOR RECONSTRUCTION)ERI4Gerken Paving Inc$6,104,814$6,307,134+3.0%-3.0%ODOT
250287TUS-US 250-12.79 (FOUR LANE RESURFACING)TUS4Shelly & Sands Inc$5,027,975$5,133,405+2.0%-9.0%ODOT
250288WAS-SR 26-18.45 (TWO LANE RESURFACING)WAS1Shelly & Sands Inc$4,844,844+5.0%ODOT
250289WAS-SR 807-00.00 (TWO LANE RESURFACING)WAS1Shelly & Sands Inc$4,795,095-6.0%ODOT
250286STA-IR 77-00.00 (FOUR LANE RESURFACING)STA2Shelly Company$4,326,599$4,747,000+10%+12%ODOT
250281LAK-SR 2-14.38 (FOUR LANE RESURFACING)LAK3Shelly Company$3,768,846$3,775,0000.0%-8.0%ODOT
250285SEN-SR 4/SR 18-07.52/15.39 Resurf (TWO LANE RESURFACING)SEN4Kokosing Construction Company Inc$3,740,212$3,811,122+2.0%-13%ODOT
250291WYA-US 23-00.00/04.03 (FOUR LANE RESURFACING)WYA2Kokosing Construction Company Inc$3,478,616$3,510,412+1.0%-10%ODOT
250276HAM-BS FY 2026 (BRIDGE REPAIR)HAM2Aad Contracting Inc$3,172,616$3,084,871-3.0%+2.0%ODOT
250277HAM-SR 264-10.42 (RELOCATION)HAM5KT Holden Construction LLC$2,212,186$2,294,651+4.0%-14%ODOT
250284SCI-SR 125/SR 772-06.25/00.00 (TWO LANE RESURFACING)SCI1Shelly Company$2,163,145-6.0%ODOT
250282PIK-SR 124-14.96 (MINOR RECONSTRUCTION)PIK4Allard Excavation LLC$1,944,512$1,978,551+2.0%-30%ODOT
250273COS-SR 93-00.75 (SLIDE REPAIR)COS4Shelly & Sands Inc$1,936,739$2,014,304+4.0%-27%ODOT
250279JAC-SR 139/SR 776/SR 788-11.35/00.00/02.36 (TWO LANE RESURFACING)JAC2Shelly & Sands Inc$1,885,831$2,078,076+10%-9.0%ODOT
258011ATH-Madison St Bridge (BRIDGE REPLACEMENT (1 BRIDGE))ATH5Alan Stone Co Inc$1,869,559$1,895,253+1.0%-11%ODOT
250272COL-US 30/VAR-25.09/VAR,TUS-IR 77-13.00 (SIGNING)COL2M P Dory Co$1,722,285$1,735,325+1.0%-15%ODOT
250294D05-Spot Paving FY2026 (SPOT PATCHING / PAVEMENT REPAIR)District 53Shelly Company$1,477,240$1,505,000+2.0%+8.0%ODOT
258009AUG-St Marys Indiana Walks SA22 (SIGNALIZATION)AUG5Perram Electric Inc$1,310,400$1,415,587+8.0%-9.0%ODOT
250293D04-SP FY2025 (West) (SPOT PATCHING / PAVEMENT REPAIR)District 42Barbicas Construction Company Inc$1,273,386$1,475,000+16%+2.0%ODOT
250278HAM-/WAR-US 22-16.04/00.00 Ped (SPOT SAFETY)HAM2Complete General Construction Company$863,798$992,621+15%+15%ODOT
258008WAS-IR 77-00.31 (BRIDGE REPAIR)WAS1Evers Steel Construction LLC$798,085+56%ODOT
250292D04-SP FY2025 (East) (SPOT PATCHING / PAVEMENT REPAIR)District 42Shelly & Sands Inc$722,588$797,000+10%+9.0%ODOT
250299WAY-SR 3/SR 301-07.15/01.60 (CULVERT REPLACEMENT)WAY2Eclipse Co LLC$523,203$586,064+12%-11%ODOT
250297MRW-SR 61-SP-2025 (GENERAL) (TWO LANE RESURFACING)MRW2Kokosing Construction Company Inc$444,692$460,996+4.0%-5.0%ODOT
254017WAY-US 250-27.50 (Culvert Replacement)WAY3Crawford Construction Company Inc$210,450$298,128+42%+24%ODOT
250295D07-RPM FY25 (RAISED PAVEMENT MARKERS)District 72A & A Safety Inc$193,399$195,746+1.0%-11%ODOT
250298ROS-Tar Hollow SF Culverts FY25 (CULVERT REPLACEMENT)ROS5Parker Corporation$193,222$194,816+1.0%-18%ODOT
250296D12-TSG FY2025 (SIGNALIZATION)District 123Perram Electric Inc$174,974$223,923+28%-24%ODOT
ODOT contracts let on May 22, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy