ODOT contract 250277 bid tabulation
HAM-SR 264-10.42 (RELOCATION). Let by Ohio DOT on May 22, 2025, HAM. 5 bids received; low bid $2,212,186 by KT Holden Construction LLC, -14% against the engineer's estimate of $2,577,000.
- Owner
- Ohio DOT
- Letting
- 22 MAY 2025
- Pay items
- 111
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | KT Holden Construction LLC | $2,212,186 | Low | -14% |
| 2 | Great Lakes Construction Co | $2,294,651 | +4.0% | -11% |
| 3 | Eagle Bridge Co | $2,305,951 | +4.0% | -11% |
| 4 | Sunesis Construction Co | $2,591,780 | +17% | +1.0% |
| 5 | John R Jurgensen Company | $2,845,185 | +29% | +10% |
Engineer's estimate: $2,577,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. KT Holden Construction LLC | 2. Great Lakes Construction Co | 3. Eagle Bridge Co | 4. Sunesis Construction Co | 5. John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $15,000 | $10,000 | $12,500 | $6,730.05 | $7,368.75 |
| 2 | Headwall removed (202E20010) | EACH | 2 | $800.00 | $235.00 | $1,000.00 | $302.31 | $1,425.15 |
| 3 | Pavement removed (202E23000) | SY | 53 | $73.50 | $55.00 | $85.00 | $63.20 | $78.86 |
| 4 | Walk removed (202E30000) | SF | 377 | $4.75 | $3.25 | $4.00 | $4.52 | $8.68 |
| 5 | Curb removed (202E32000) | FT | 158 | $11.00 | $3.75 | $10.00 | $9.29 | $16.02 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 56 | $38.00 | $23.50 | $20.00 | $28.75 | $49.63 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 58 | $39.00 | $40.50 | $30.00 | $37.01 | $52.57 |
| 8 | Guardrail removed (202E38000) | FT | 301 | $2.00 | $2.00 | $2.00 | $7.50 | $7.50 |
| 9 | Anchor assembly removed, type T (202E42040) | EACH | 2 | $160.00 | $160.00 | $160.00 | $150.00 | $150.00 |
| 10 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $140.00 | $140.00 | $140.00 | $200.00 | $200.00 |
| 11 | Catch basin removed (202E58100) | EACH | 4 | $660.00 | $300.00 | $325.00 | $604.63 | $1,147.22 |
| 12 | Fence removed (202E75000) | FT | 136 | $4.50 | $4.50 | $10.00 | $10.00 | $10.00 |
| 13 | Removal misc.: rock channel protection (202E98000) | LS | 1 | $1,500.00 | $1,700.00 | $1,500.00 | $3,060.00 | $2,779.38 |
| 14 | Excavation (203E10000) | CY | 271 | $29.00 | $27.00 | $23.00 | $21.90 | $35.13 |
| 15 | Embankment (203E20000) | CY | 3,885 | $30.00 | $24.00 | $35.00 | $41.13 | $45.07 |
| 16 | Embankment, as per plan (203E20001) | CY | 6,524 | $48.70 | $80.00 | $67.00 | $122.80 | $53.52 |
| 17 | Subgrade compaction (204E10000) | SY | 1,435 | $2.50 | $4.25 | $5.00 | $4.02 | $3.18 |
| 18 | Excavation of subgrade (204E13000) | CY | 180 | $50.00 | $55.00 | $16.00 | $39.42 | $62.07 |
| 19 | Granular material, type C (204E30020) | CY | 558 | $75.00 | $80.00 | $90.00 | $85.27 | $95.76 |
| 20 | Proof rolling (204E45000) | HR | 1 | $320.00 | $300.00 | $150.00 | $395.98 | $248.26 |
| 21 | Geotextile fabric (204E50000) | SY | 1,435 | $1.10 | $1.90 | $2.00 | $2.96 | $2.38 |
| 22 | Guardrail, type MGS with long posts (606E15100) | FT | 288 | $33.40 | $33.40 | $33.40 | $33.00 | $33.00 |
| 23 | 5" concrete walk (608E12000) | SF | 2,166 | $11.00 | $12.50 | $12.00 | $15.20 | $13.75 |
| 24 | Monument assembly, type C (623E38500) | EACH | 5 | $2,000.00 | $1,900.00 | $1,750.00 | $1,294.05 | $1,492.57 |
| 25 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $6,480.00 | $6,500.00 | $7,500.00 | $740.00 | $10,582 |
| 26 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $21,811 | $46,500 | $70,000 | $46,158 | $52,454 |
| 27 | Water (616E10000) | MGAL | 41 | $22.50 | $50.00 | $20.00 | $4.07 | $47.54 |
| 28 | Topsoil (659E00300) | CY | 109 | $62.50 | $75.00 | $65.00 | $68.41 | $40.66 |
| 29 | Seeding and mulching (659E10000) | SY | 980 | $5.00 | $5.00 | $5.00 | $3.64 | $3.65 |
| 30 | Repair seeding and mulching (659E14000) | SY | 49 | $1.00 | $1.00 | $3.00 | $0.28 | $3.65 |
| 31 | Commercial fertilizer (659E20000) | TON | 0.13 | $1,500.00 | $1,500.00 | $1,750.00 | $1,400.00 | $1,000.00 |
| 32 | Lime (659E31000) | ACRE | 0.20 | $200.00 | $200.00 | $10.00 | $200.00 | $100.00 |
| 33 | Water (659E35000) | MGAL | 5.40 | $1.00 | $1.00 | $15.00 | $1.39 | $10.00 |
| 34 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | Paved gutter, type 1-2 (601E37500) | FT | 113 | $100.00 | $72.00 | $100.00 | $65.00 | $74.87 |
| 36 | Paved gutter, type 1-2, as per plan (601E37501) | FT | 35 | $97.00 | $88.00 | $100.00 | $75.00 | $88.34 |
| 37 | 4" base pipe underdrains (605E06000) | FT | 285 | $12.00 | $15.00 | $25.00 | $18.93 | $30.27 |
| 38 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 40 | $37.00 | $18.00 | $20.00 | $29.36 | $30.23 |
| 39 | 12" conduit, type B (611E04400) | FT | 108 | $175.00 | $160.00 | $115.00 | $111.01 | $113.71 |
| 43 | Catch basin, no. 3A (611E98180) | EACH | 5 | $3,700.00 | $5,400.00 | $3,750.00 | $2,840.25 | $2,429.10 |
| 44 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $1,890.00 | $3,550.00 | $2,150.00 | $1,765.40 | $1,829.21 |
| 45 | Catch basin, no. 2-4 (611E98540) | EACH | 1 | $18,500 | $15,000 | $17,500 | $15,853 | $8,747.65 |
| 46 | Catch basin grate (611E98644) | EACH | 1 | $400.00 | $525.00 | $400.00 | $821.74 | $471.02 |
| 47 | Manhole, no. 3 (611E99574) | EACH | 2 | $9,425.00 | $11,250 | $8,750.00 | $6,656.55 | $11,091 |
| 48 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 320 | $261.84 | $298.00 | $298.00 | $255.00 | $320.00 |
| 49 | Aggregate base (304E20000) | CY | 234 | $103.00 | $110.00 | $110.00 | $123.94 | $122.09 |
| 50 | Non-tracking tack coat (407E20000) | GAL | 254 | $10.27 | $3.00 | $3.00 | $10.00 | $5.50 |
| 51 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 61 | $492.87 | $410.00 | $410.00 | $480.00 | $545.00 |
| 52 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 67 | $462.07 | $370.00 | $370.00 | $450.00 | $560.00 |
| 53 | Curb, type 6 (609E26000) | FT | 591 | $34.00 | $48.00 | $37.00 | $33.02 | $33.86 |
| 54 | RPM (621E00100) | EACH | 47 | $88.80 | $88.80 | $88.80 | $81.96 | $88.80 |
| 55 | Raised pavement marker removed (621E54000) | EACH | 47 | $18.00 | $12.50 | $15.00 | $81.96 | $27.06 |
| 56 | Light pole removed (625E75400) | EACH | 1 | $11,000 | $8,750.00 | $8,750.00 | $34,571 | $8,750.00 |
| 57 | Barrier reflector, type 2, (one-way) (626E00110) | EACH | 3 | $15.60 | $15.60 | $15.60 | $15.00 | $15.00 |
| 58 | Lane line, 4" (644E00200) | MI | 0.27 | $2,145.00 | $2,145.00 | $2,145.00 | $4,166.00 | $2,145.00 |
| 59 | Center line (644E00300) | MI | 0.17 | $10,420 | $10,420 | $10,420 | $16,000 | $10,420 |
| 60 | Channelizing line, 8" (644E00400) | FT | 227 | $2.40 | $2.40 | $2.40 | $2.50 | $2.40 |
| 61 | Stop line (644E00500) | FT | 110 | $15.40 | $15.40 | $15.40 | $7.00 | $15.40 |
| 62 | Lane arrow (644E01300) | EACH | 2 | $150.00 | $150.00 | $150.00 | $200.00 | $150.00 |
| 63 | Dotted line, 4" (644E01500) | FT | 228 | $1.30 | $1.30 | $1.30 | $2.00 | $1.30 |
| 64 | Dotted line, 4", as per plan (644E01501) | FT | 91 | $1.55 | $1.55 | $1.55 | $4.00 | $1.55 |
| 65 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 160 | $80.00 | $104.70 | $135.00 | $110.00 | $120.90 |
| 66 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 8 | $1,897.96 | $1,897.96 | $1,898.00 | $1,897.96 | $1,897.96 |
| 67 | Barrier reflector, type 1, (BI-directional) (614E13310) | EACH | 23 | $11.64 | $11.64 | $12.00 | $11.64 | $11.64 |
| 68 | Object marker, one way (614E13350) | EACH | 23 | $20.23 | $20.23 | $20.00 | $20.23 | $20.23 |
| 69 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.27 | $2,175.00 | $2,175.00 | $2,175.00 | $2,500.00 | $2,175.00 |
| 70 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.29 | $12,377 | $12,377 | $12,377 | $34,145 | $12,377 |
| 71 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.17 | $3,780.00 | $3,780.00 | $3,780.00 | $7,500.00 | $3,780.00 |
| 72 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.69 | $8,697.58 | $8,697.58 | $8,697.58 | $17,060 | $8,697.58 |
| 73 | Work zone channelizing line, class I, 12" (614E23010) | FT | 377 | $2.87 | $2.87 | $2.87 | $1.00 | $2.87 |
| 74 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 120 | $0.95 | $0.95 | $0.95 | $2.00 | $0.95 |
| 75 | Work zone dotted line, class I, 4", 740.06, type I (614E24400) | FT | 980 | $1.23 | $1.23 | $1.23 | $1.10 | $1.23 |
| 76 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 319 | $0.85 | $0.85 | $0.85 | $1.00 | $0.85 |
| 77 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 44 | $6.38 | $6.38 | $6.38 | $10.30 | $6.38 |
| 78 | Work zone stop line, class III, 642 paint (614E26610) | FT | 110 | $4.50 | $4.50 | $4.50 | $3.00 | $4.50 |
| 79 | Pavement for maintaining traffic, class B (615E25000) | SY | 255 | $190.00 | $110.00 | $120.00 | $176.82 | $120.00 |
| 80 | Portable barrier, unanchored (622E41100) | FT | 413 | $27.00 | $22.50 | $34.00 | $27.05 | $27.15 |
| 81 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $1.00 | $15,000 | $1.00 | $341.02 | $12,994 |
| 82 | Special - misc.: work invloving asbestos containin (690E98400) | LS | 1 | $420.00 | $250.00 | $150.00 | $500.00 | $4,800.00 |
| 84 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 444 | $25.00 | $25.00 | $25.00 | $28.00 | $28.00 |
| 85 | Vandal protection fence, 6' straight, coated fabric (607E39900) | FT | 159 | $132.00 | $136.00 | $132.00 | $193.00 | $193.00 |
| 86 | Mechanically stabilized earth wall, as per plan (840E20001) | SF | 3,988 | $71.00 | $50.00 | $60.00 | $69.02 | $71.99 |
| 87 | Wall excavation (840E21000) | CY | 652 | $26.00 | $32.00 | $20.00 | $26.54 | $49.52 |
| 88 | Foundation preparation, as per plan (840E22001) | SY | 336 | $54.00 | $60.00 | $65.00 | $81.76 | $66.71 |
| 89 | 6" drainage pipe, perforated (840E25010) | FT | 323 | $9.60 | $9.00 | $12.00 | $6.48 | $41.85 |
| 90 | 6" drainage pipe, non-perforated (840E25020) | FT | 2.50 | $142.00 | $100.00 | $25.00 | $115.36 | $255.51 |
| 91 | Concrete coping (840E26000) | FT | 159 | $240.00 | $275.00 | $230.00 | $239.73 | $561.79 |
| 92 | Aesthetic surface treatment (840E26050) | SF | 3,988 | $1.00 | $10.25 | $3.00 | $0.02 | $1.34 |
| 93 | On-site assistance (840E27000) | DAY | 5 | $1,000.00 | $250.00 | $750.00 | $1,226.53 | $537.34 |
| 94 | Temporary wire faced mechanically stabilized earth wall, as per plan (867E00101) | LS | 1 | $102,515 | $90,000 | $80,000 | $125,871 | $95,384 |
| 95 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $182,250 | $150,000 | $210,000 | $146,311 | $375,000 |
| 96 | Approach slab removed (202E22900) | SY | 396 | $88.00 | $70.00 | $45.00 | $43.40 | $140.00 |
| 97 | Wearing course removed (202E23500) | SY | 396 | $6.40 | $12.00 | $20.00 | $6.23 | $25.00 |
| 98 | Bridge railing removed, as per plan (202E38501) | FT | 286 | $39.00 | $12.00 | $25.00 | $13.93 | $25.00 |
| 99 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $57,100 | $11,000 | $25,000 | $13,785 | $55,000 |
| 100 | Unclassified excavation (503E21300) | LS | 1 | $46,100 | $7,500.00 | $30,000 | $18,205 | $15,000 |
| 101 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 355 | $15.00 | $15.00 | $15.00 | $12.00 | $12.00 |
| 102 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 71 | $36.50 | $36.50 | $36.50 | $30.00 | $30.00 |
| 103 | 1/2" preformed expansion joint filler (516E13200) | SF | 8 | $9.00 | $15.00 | $7.00 | $7.30 | $40.00 |
| 105 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,960 | $20,000 | $25,000 | $14,077 | $21,334 |
| 106 | Maintaining traffic (614E11000) | LS | 1 | $69,250 | $121,000 | $75,000 | $15,251 | $249,802 |
| 107 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,300 | $20,000 | $20,000 | $10,800 | $10,332 |
| 108 | Mobilization (624E10000) | LS | 1 | $108,385 | $114,000 | $110,000 | $86,293 | $140,000 |
| 200 | 12" conduit, type B (611E04400) | FT | 105 | $128.00 | $160.00 | $140.00 | $111.29 | $129.26 |
| 201 | 36" conduit, type B (611E16400) | FT | 4 | $2,700.00 | $1,300.00 | $1,000.00 | $2,451.44 | $1,676.58 |
| 202 | 36" conduit, type B (611E16400) | FT | 6 | $1,230.00 | $1,000.00 | $850.00 | $770.08 | $923.51 |
| 203 | 36" conduit, type B (611E16400) | FT | 65 | $332.00 | $340.00 | $350.00 | $648.57 | $407.24 |
| 204 | Roads for maintaining traffic (615E10000) | LS | 1 | $8,400.00 | $2,000.00 | $15,000 | $4,068.63 | $6,058.78 |
| 205 | Special - settlement platform (203E65000) | EACH | 3 | $2,970.00 | $1,750.00 | $2,000.00 | $1,552.30 | $3,185.98 |
| 206 | Portable barrier, anchored (622E41110) | FT | 798 | $30.00 | $35.00 | $35.00 | $30.42 | $29.25 |
| 300 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 444 | $25.00 | $25.00 | $25.00 | $20.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.