ODOT contract 258009 bid tabulation

AUG-St Marys Indiana Walks SA22 (SIGNALIZATION). Let by Ohio DOT on May 22, 2025, AUG. 5 bids received; low bid $1,310,400 by Perram Electric Inc, -8.7% against the engineer's estimate of $1,436,000.

Owner
Ohio DOT
Letting
22 MAY 2025
Pay items
110
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Perram Electric Inc$1,310,400Low-9.0%
2Brumbaugh Construction Inc$1,415,587+8.0%-1.0%
3L J Deweese Co Inc$1,452,994+11%+1.0%
4R B Jergens Contractors Inc$1,457,416+11%+1.0%
5D L Smith Concrete LLC$1,591,596+21%+11%
ODOT contract 258009: bids by rank

Engineer's estimate: $1,436,000.

Bid tabulation

LinePay itemUnitQuantity1. Perram Electric Inc2. Brumbaugh Construction Inc3. L J Deweese Co Inc4. R B Jergens Contractors Inc5. D L Smith Concrete LLC
1Clearing and grubbing (201E11000)LS1$1.00$5,000.00$2,500.00$11,462$10,500
2Pavement removed (202E23000)SY845$38.00$14.00$36.00$21.31$9.00
3Walk removed (202E30000)SF576$4.00$7.00$5.00$5.31$4.00
4Curb removed (202E32000)FT276$12.00$28.00$15.00$10.71$15.00
5Valve box removed (202E75610)EACH2$250.00$330.00$250.00$532.64$500.00
6Removal misc.:boulder (202E98100)EACH1$425.00$250.00$25.00$4,420.12$500.00
7Excavation (203E10000)CY881$40.00$40.00$35.00$30.66$60.00
8Embankment (203E20000)CY284$35.00$40.00$55.00$21.44$35.00
9Subgrade compaction (204E10000)SY347$3.50$4.00$3.00$15.43$2.50
104" concrete walk, as per plan (608E10001)SF16,318$9.00$9.25$11.00$8.93$15.00
11Curb ramp (608E52000)SF1,554$9.00$28.00$22.00$20.63$20.00
12Monument, misc.:post construction monument verific (623E40900)EACH1$1,560.00$4,000.00$5,000.00$2,466.08$4,000.00
13Monument, misc.:reconstruction monument verificati (623E40900)EACH1$1,960.00$4,000.00$5,000.00$2,466.08$4,000.00
14Topsoil (659E00300)CY500$60.00$97.00$55.00$71.71$35.00
15Seeding and mulching, class 1 (659E00500)SY4,500$2.05$2.00$2.00$2.11$4.50
16Repair seeding and mulching (659E14000)SY225$3.00$1.00$10.00$1.06$3.00
17Inter-seeding (659E15000)SY225$3.00$1.00$5.00$1.06$2.00
18Commercial fertilizer (659E20000)TON0.61$1,500.00$1,000.00$1,200.00$634.15$650.00
19Lime (659E31000)ACRE0.10$1,200.00$5.00$1,200.00$105.70$200.00
20Water (659E35000)MGAL12.15$50.05$5.00$50.00$10.57$25.00
21Erosion control (832E30000)EACH15,000$1.00$1.00$1.00$1.00$1.00
22Concrete masonry (602E20000)CY1$900.00$1,575.00$3,500.00$2,474.94$650.00
234" base pipe underdrains (605E06000)FT162$20.00$40.00$10.00$12.97$20.00
2412" conduit, type C (611E04600)FT10$130.00$105.00$250.00$126.66$95.00
25Conduit, misc.:type B for drainage discharge conti (611E97400)FT10$130.00$35.00$30.00$72.99$68.00
26Conduit, misc.:type C for drainage discharge conti (611E97400)FT10$130.00$27.00$30.00$72.99$68.00
27Conduit, misc.:type E for drainage discharge conti (611E97400)FT10$130.00$35.00$30.00$72.99$68.00
28Conduit, misc.:type F for drainage discharge conti (611E97400)FT10$130.00$27.00$30.00$72.99$68.00
29Catch basin adjusted to grade (611E98630)EACH2$1,100.00$450.00$900.00$807.61$1,850.00
30Manhole adjusted to grade (611E99654)EACH4$1,100.00$500.00$1,200.00$1,377.65$1,500.00
31Inspection well (611E99720)EACH1$1,000.00$1,100.00$1,500.00$2,580.96$1,500.00
32Asphalt concrete base, PG64-22, (449) (301E56000)CY5$545.00$950.00$600.00$575.48$305.00
33Aggregate base (304E20000)CY147$80.00$115.00$125.00$102.19$78.00
34Non-tracking tack coat (407E20000)GAL12$5.25$100.00$50.00$5.55$15.00
35Stabilized crushed aggregate (411E10000)CY162$80.00$115.00$125.00$190.37$85.00
36Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100)CY7$627.00$950.00$800.00$663.20$365.00
37Asphalt concrete surface course, 12.5 MM, type A (449) (driveways) (442E22120)CY2$627.00$950.00$800.00$663.20$365.00
38Asphalt concrete intermediate course, 19 MM, type A (449) (442E22400)CY12$576.00$950.00$800.00$608.77$335.00
39Asphalt concrete intermediate course, 19 MM, type A (449) (driveways) (442E22420)CY3$576.00$950.00$800.00$608.77$335.00
406" non-reinforced concrete pavement, class QC 1P (452E10010)SY657$77.00$110.00$135.00$87.25$115.00
419" non-reinforced concrete pavement, class QC 1P (452E13010)SY45$102.00$150.00$175.00$328.67$130.00
42Combination curb and gutter, type 2, as per plan (609E12001)FT378$53.00$60.00$65.00$49.68$42.00
43Curb, type 6, as per plan (609E26001)FT225$38.00$45.00$55.00$35.78$38.00
446" fire hydrant (638E10200)EACH1$11,500$12,500$9,800.00$7,147.53$8,500.00
45Fire hydrant removed (638E10480)EACH1$5,000.00$1,500.00$1,200.00$1,190.44$1,500.00
46Valve box adjusted to grade (638E10800)EACH4$250.00$150.00$800.00$665.36$950.00
47Ground mounted support, no. 3 post (630E03100)FT83$22.30$17.00$15.00$21.68$16.50
48Sign hanger assembly, mast arm, as per plan (630E79101)EACH24$380.00$445.00$400.00$524.78$440.00
49Sign, flat sheet (630E80100)SF45$28.00$27.00$24.00$21.45$26.40
50Sign, flat sheet, as per plan (630E80101)SF115$36.85$36.00$32.00$25.04$64.24
51Sign, street name, as per plan (630E80511)EACH8$515.00$305.00$275.00$411.43$302.50
52Removal of ground mounted sign and disposal (630E84900)EACH15$54.65$30.00$25.00$17.52$27.50
53Removal of ground mounted post support and disposal (630E86002)EACH9$56.95$30.00$25.00$23.37$27.50
54Removal of pavement marking (642E30000)FT1,045$3.00$3.00$3.00$4.91$3.30
55Stop line (644E00500)FT360$10.00$8.00$7.00$5.76$7.70
56Crosswalk line, 12" (644E00620)FT1,458$3.00$4.00$4.00$4.39$4.40
57Lane arrow (644E01300)EACH1$200.00$125.00$125.00$274.79$110.00
584" conduit, type E (611E00400)FT180$4.80$4.80$5.00$5.28$5.50
59Bracket arm, 15', as per plan (625E18201)EACH9$1,065.00$1,065.00$1,200.00$1,162.58$1,210.00
60Conduit, 2", 725.051 (625E25408)FT171$11.85$11.80$12.00$12.68$13.20
61Conduit, 3", 725.051 (625E25504)FT112$15.15$15.15$16.00$14.80$15.40
62Conduit, 4", 725.051 (625E25604)FT92$19.65$19.65$20.00$21.14$22.00
63Conduit, jacked or drilled, 725.052, as per plan (625E25909)FT449$33.55$33.55$34.00$48.62$50.60
64Conduit, jacked or drilled, 725.052, as per plan (625E25909)FT285$47.82$47.82$48.00$49.67$51.70
65Conduit, jacked or drilled, 725.052, as per plan (625E25909)FT498$52.10$52.10$53.00$56.02$58.30
66Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH9$515.00$515.00$520.00$581.29$605.00
67Trench (625E29000)FT329$19.35$19.35$20.00$15.85$16.50
68Pull box, 725.08, 18" (625E30700)EACH6$1,855.00$1,855.00$2,000.00$1,109.74$1,155.00
69Pull box, 725.08, 24" (625E30706)EACH3$2,055.00$2,055.00$2,200.00$1,426.81$1,485.00
70Ground rod (625E32000)EACH20$340.00$340.00$350.00$317.07$330.00
71Underground warning marking tape (625E36010)FT329$1.30$1.30$1.30$3.17$3.30
72Light pole removed (625E75400)EACH2$615.00$615.00$620.00$369.91$385.00
73Light pole foundation removed (625E75500)EACH2$615.00$615.00$620.00$264.22$275.00
74Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007)EACH23$928.00$928.00$950.00$1,585.34$1,650.00
75Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate, as per plan (632E05065)EACH4$1,125.00$1,125.00$1,200.00$1,849.56$1,925.00
76Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH16$600.00$600.00$600.00$951.20$990.00
77Accessible pedestrian pushbutton, as per plan (632E20751)EACH16$1,018.00$1,018.00$1,200.00$1,004.05$1,045.00
78Covering of vehicular signal head (632E25000)EACH27$10.00$10.00$10.00$42.28$44.00
79Covering of pedestrian signal head (632E25010)EACH16$5.00$5.00$5.00$31.71$3.30
80Signal cable, 3 conductor, no. 14 AWG (632E40300)FT3,438$2.40$2.40$2.50$3.06$3.19
81Signal cable, 5 conductor, no. 14 AWG (632E40500)FT4,505$2.86$2.86$3.00$3.38$3.52
82Signal cable, 7 conductor, no. 14 AWG (632E40700)FT3,513$3.30$3.30$3.40$3.59$3.74
83Signal cable, 3 conductor, no. 12 AWG (632E42300)FT2,408$2.93$2.93$3.00$2.75$2.86
84Signal support foundation, as per plan (632E64011)EACH7$8,066.00$8,066.00$9,500.00$8,243.77$8,580.00
85Signal support foundation, as per plan (632E64011)EACH1$18,130$18,130$21,000$25,894$26,950
86Pedestal foundation (632E64020)EACH10$1,520.00$1,520.00$1,700.00$1,532.50$1,595.00
87Power cable, 3 conductor, no. 6 AWG (632E68300)FT58$7.60$7.60$8.00$9.51$9.90
88Power cable, misc.:1/0, 600 volts (632E69350)FT496$16.15$16.15$17.00$10.57$11.00
89Power service, as per plan (632E70001)EACH2$3,920.00$3,920.00$5,000.00$2,642.23$2,750.00
90Combination signal support, type TC-81.22, design 4, as per plan (632E79111)EACH1$11,550$11,550$13,000$13,317$13,860
91Combination signal support, type TC-81.22, design 13, as per plan (632E79141)EACH2$18,855$18,855$21,000$22,618$23,540
92Combination signal support, type TC-81.22, design 14, as per plan (632E79151)EACH4$21,190$21,190$23,000$25,894$26,950
93Pedestal, 5', transformer base, as per plan (632E89803)EACH1$1,115.00$1,115.00$1,300.00$660.56$687.50
94Pedestal, 8', transformer base, as per plan (632E89901)EACH9$1,133.00$1,133.00$1,300.00$845.51$880.00
95Removal of traffic signal installation, as per plan (632E90101)EACH2$6,560.00$6,560.00$7,500.00$4,016.19$4,180.00
96Signalization, misc.:combination signal support (S (632E90400)EACH1$24,430$24,430$26,000$29,857$31,075
97Cabinet, type TS-2, as per plan (633E65511)EACH2$17,340$16,720$18,000$21,032$21,890
98Cabinet foundation (633E67100)EACH2$3,550.00$3,550.00$4,000.00$3,382.06$3,520.00
99Controller work pad, as per plan (633E67201)EACH2$630.00$630.00$700.00$665.84$693.00
100Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH2$5,735.00$5,735.00$6,000.00$6,658.43$6,930.00
101Advance radar detection, as per plan (809E69001)EACH4$9,455.00$9,150.00$9,500.00$10,886$11,330
102Stop line radar detection, as per plan (809E69101)EACH8$9,165.00$8,877.00$9,000.00$10,516$10,945
103Atc controller, as per plan (809E69123)EACH2$5,765.00$5,545.00$5,750.00$7,715.32$8,030.00
104Spread spectrum radio, as per plan (815E30001)EACH2$3,495.00$3,495.00$3,700.00$4,227.57$4,400.00
105Law enforcement officer with patrol car for assistance (614E11110)HR16$100.00$100.00$120.00$158.53$75.00
106Water (616E10000)MGAL15$50.00$5.00$50.00$193.60$1.00
107Premium for contract performance bond and for payment bond (103E05000)LS1$22,040$12,500$15,000$15,676$45,729
108Maintaining traffic (614E11000)LS1$60,700$53,326$38,000$26,905$49,000
109Construction layout stakes and surveying (623E10000)LS1$10,550$18,500$15,000$36,498$15,000
110Mobilization (624E10000)LS1$40,000$70,000$38,000$55,000$45,500
ODOT contract 258009: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy