D L Smith Concrete LLC: ODOT bid record

D L Smith Concrete LLC submitted 31 bids on Ohio DOT contracts in the data, from 04 JUN 2020 to 29 OCT 2026, and was the low bidder on 10 of them (32%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,908,696
Latest bid
29 OCT 2026
Data through
12 NOV 2026
31Bids
10Low bids
32Win rate, percent
+15%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
202022100%
2021300%
20223133%
20234125%
20249333%
20255120%
20265240%
D L Smith Concrete LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
AUG3267%
ALL2150%
ERI200%
CUY200%
HUR22100%
WAY200%
WOO2150%
WYA200%
UNI100%
SAN100%
TUS100%
SEN100%
D L Smith Concrete LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2929 (100%)$1.00$1.00
Aggregate base304E20000CY2115 (71%)$65.00$90.00
Commercial fertilizer659E20000TON2013 (65%)$453.00$850.00
Subgrade compaction204E10000SY1911 (58%)$1.50$3.00
Walk removed202E30000SF1611 (69%)$2.50$4.00
Water659E35000MGAL219 (43%)$18.00$1.00
Lime659E31000ACRE159 (60%)$55.00$150.00
Topsoil659E00300CY208 (40%)$55.00$45.00
Pavement removed202E23000SY208 (40%)$16.00$17.00
Law enforcement officer with patrol car for assistance614E11110HR168 (50%)$82.50$80.00
Excavation203E10000CY236 (26%)$40.00$27.00
Sign, flat sheet630E80100SF216 (29%)$27.50$24.00
D L Smith Concrete LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Smith Paving & Excavating Inc149 of 14
Shelly & Sands Inc91 of 9
Madex Construction Co60 of 6
Perk Company Inc51 of 5
Great Lakes Demolition Company43 of 4
Eclipse Co LLC41 of 4
Complete General Construction Company30 of 3
R M H Concrete & Foundations Inc32 of 3
Fechko Excavating LLC32 of 3
Tri-Mor Corp31 of 3
D L Smith Concrete LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026264029LAKLAK-SR 283-03.29 Sidewalk (SIDEWALK)1 of 4$476,153Low, 15% under the second
09 APR 2026260176HARHAR-SR 67-Sidewalks (SIDEWALK)1 of 2$1,068,922Low, 7.0% under the second
09 APR 2026260187WYAWYA-Carey SRTS Phase 2 (SIDEWALK)3 of 6$290,883+11%
19 FEB 2026260100VANVAN-Fox Road Walk Connections (SIDEWALK)2 of 3$511,763+49%
29 JAN 2026260059MERMER-FT RECOVERY SIDEWALKS SA22 (SIDEWALK)2 of 4$1,012,635+14%
18 DEC 2025250595PAUPAU-US 24-00.00 (SPOT PATCHING / PAVEMENT REPAIR)2 of 3$2,785,249+15%
28 AUG 2025250393DELDEL-SR 750-02.57 (SPOT SAFETY)3 of 5$208,111+11%
26 JUN 2025250324PUTPUT-Ottawa Ped. Improvements (SPOT SAFETY)3 of 4$298,808+61%
22 MAY 2025258009AUGAUG-St Marys Indiana Walks SA22 (SIGNALIZATION)5 of 5$1,591,596+21%
16 JAN 2025250016HURHUR-SR 18-17.10 (INTERSECTION)1 of 7$1,519,776Low, 3.0% under the second
31 OCT 2024240487CRACRA-US 30-00.00 (FOUR LANE RESURFACING)3 of 4$3,227,586+20%
25 JUL 2024240374ERIERI-SR 4-00.45 GSM (SLIDE REPAIR)6 of 6$738,163+40%
25 JUL 2024240382WYAWYA-US 23-06.63 (INTERSECTION)3 of 6$342,157+22%
11 JUL 2024248007WOOWOO-IR 75-27.80 Noisewall (NOISE WALLS)1 of 3$1,161,386Low, 2.0% under the second
27 JUN 2024240341AUGAUG-SR 66-Crosswalk SA23 (SPOT SAFETY)1 of 2$124,586Low, 22% under the second
09 MAY 2024240273MEDMED-SR 94-07.64 (TWO LANE RESURFACING)1 of 4$467,063Low, 16% under the second
18 APR 2024240248WAYWAY-SR 57-10.32 (INTERSECTION)2 of 5$1,493,906+2.0%
04 APR 2024240225WOOWOO-SR 199-09.36 Roundabout (INTERSECTION)2 of 5$1,569,616+9.0%
08 FEB 2024240112WAYWAY-US 30-11.64 (SPOT PATCHING / PAVEMENT REPAIR)3 of 7$1,294,122+13%
14 DEC 2023230588ALLALL-/HAN-US 30-19.02/00.00 (SPOT PATCHING / PAVEMENT REPAIR)2 of 4$3,549,547+7.0%
30 NOV 2023230580HURHUR-SR 61-00.38 (Plymouth walk) (INTERSECTION)1 of 5$153,966Low, 8.0% under the second
09 FEB 2023230081CUYCUY-SR 175 Multi-Purpose Trail (SIDEWALK)6 of 8$825,443+19%
09 FEB 2023230083CUYCUY-SRTS FY2023 Bay Village (SIDEWALK)4 of 5$315,989+26%
29 SEP 2022220525MARMAR-SR 309-14.03 (MINOR RECONSTRUCTION)1 of 5$474,561Low, 0.0% under the second
14 APR 2022220251SENSEN-US 224-03.64 Roundabout Grp B (INTERSECTION)2 of 4$1,781,163+19%
D L Smith Concrete LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy