ODOT contract 250393 bid tabulation

DEL-SR 750-02.57 (SPOT SAFETY). Let by Ohio DOT on August 28, 2025, DEL. 5 bids received; low bid $186,713 by J & J Schlaegel Inc, +8.6% against the engineer's estimate of $172,000.

Owner
Ohio DOT
Letting
28 AUG 2025
Pay items
49
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J & J Schlaegel Inc$186,713Low+9.0%
2Strawser Paving Co Inc$199,968+7.0%+16%
3D L Smith Concrete LLC$208,111+11%+21%
4Complete General Construction Company$239,309+28%+39%
5Axis Civil Construction LLC$244,739+31%+42%
ODOT contract 250393: bids by rank

Engineer's estimate: $172,000.

Bid tabulation

LinePay itemUnitQuantity1. J & J Schlaegel Inc2. Strawser Paving Co Inc3. D L Smith Concrete LLC4. Complete General Construction Company5. Axis Civil Construction LLC
1Clearing and grubbing (201E11000)LS1$500.00$2,000.00$1,800.00$2,000.00$5,000.00
2Pavement removed (202E23000)SY104$30.00$60.00$15.00$35.00$30.00
3Walk removed (202E30000)SF66$7.00$40.00$2.00$10.00$20.00
4Curb removed (202E32000)FT88$12.00$25.00$18.00$10.00$30.00
5Curb and gutter removed (202E32500)FT55$14.00$35.00$18.00$15.00$30.00
6Gutter removed (202E32600)FT63$12.00$35.00$18.00$10.00$30.00
7Catch basin removed (202E58100)EACH1$400.00$800.00$500.00$500.00$1,900.00
8Removal misc.: paver curb ramp removed (202E98400)SF101$14.00$14.00$2.00$10.00$15.00
9Removal misc.: paver sidewalk removed and reset (202E98400)SF99$35.00$20.00$2.00$10.00$30.00
10Excavation (203E10000)CY5$60.00$135.00$50.00$400.00$130.00
11Embankment (203E20000)CY15$60.00$155.00$50.00$100.00$130.00
12Subgrade compaction (204E10000)SY81$4.00$10.00$2.00$10.00$4.00
13Curb ramp, as per plan (608E52001)SF291$23.00$35.00$38.00$40.00$32.00
14Walkway, misc.: paver sidewalk (608E98000)SF386$54.00$40.00$66.00$75.00$55.00
15Walkway, misc.: paver border (608E98100)FT16$60.00$32.00$66.00$90.00$80.00
16Topsoil (659E00300)CY11$65.00$140.00$50.00$115.00$70.00
17Seeding and mulching (659E10000)SY90$10.00$25.00$10.00$25.00$25.00
18Repair seeding and mulching (659E14000)SY5$3.00$25.00$5.00$25.00$25.00
19Inter-seeding (659E15000)SY5$3.00$25.00$5.00$25.00$25.00
20Commercial fertilizer (659E20000)TON0.01$1,200.00$1,250.00$200.00$1,250.00$1,250.00
21Lime (659E31000)ACRE0.02$250.00$150.00$200.00$150.00$150.00
22Water (659E35000)MGAL0.50$100.00$1.00$200.00$1.00$1.00
23Erosion control (832E30000)EACH5,000$1.00$1.00$1.00$1.00$1.00
24Underdrains, misc.: underdrain replacement (605E98000)FT142$20.00$18.00$25.00$35.00$25.00
254" conduit, type F for underdrain outlet (611E00410)FT10$30.00$35.00$25.00$30.00$100.00
2612" conduit, type B (611E04400)FT10$160.00$250.00$100.00$300.00$180.00
27Catch basin, no. 3A (611E98180)EACH1$3,800.00$5,000.00$4,200.00$6,000.00$5,500.00
28Catch basin, misc.: connect to existing structure (611E98690)EACH1$3,500.00$950.00$1,250.00$700.00$1,500.00
29Asphalt concrete base, PG64-22, (449) (301E56000)CY8$550.00$1,100.00$285.00$600.00$800.00
30Aggregate base, as per plan (304E20001)CY14$140.00$150.00$50.00$170.00$250.00
31Non-tracking tack coat (407E20000)GAL7$20.00$5.00$6.00$5.00$7.00
32Crack sealing, misc.: sealant at sawcut joint (423E98200)FT220$5.00$3.00$2.00$4.50$6.00
33Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY4$650.00$2,200.00$285.00$700.00$850.00
34Combination curb and gutter, type 2, as per plan (609E12001)FT132$60.00$85.00$62.00$70.00$90.00
35Curb, type 6 (609E26000)FT12$50.00$85.00$62.00$140.00$120.00
36Ground mounted support, no. 3 post, as per plan (630E03101)FT94$26.73$35.00$31.00$16.00$35.00
37Sign, flat sheet (630E80100)SF26$28.49$35.00$33.00$18.00$35.00
38Removal of ground mounted sign and disposal (630E84900)EACH4$15.00$35.00$20.00$30.00$35.00
39Removal of ground mounted sign and reerection (630E85100)EACH2$83.05$150.00$91.00$55.00$150.00
40Removal of ground mounted post support and disposal (630E86002)EACH3$20.00$35.00$25.00$35.00$35.00
41Signing, misc.: solar-powered rectangular rapid FL (630E97700)EACH6$8,110.00$8,000.00$12,500$9,951.50$9,600.00
42Pedestal foundation (632E64020)EACH6$2,200.00$1,000.00$1,800.00$4,500.00$3,600.00
43Crosswalk line, 24" (644E00630)FT270$9.50$9.50$14.00$9.50$9.50
44Removal of pavement marking (644E30000)FT276$4.90$4.90$9.00$4.90$4.90
45Water (616E10000)MGAL0.50$100.00$15.00$200.00$150.00$1.00
46Premium for contract performance bond and for payment bond (103E05000)LS1$1,980.00$1,400.00$5,000.00$1,150.00$3,000.00
47Maintaining traffic (614E11000)LS1$16,030$15,000$7,800.00$27,000$25,000
48Construction layout stakes and surveying (623E10000)LS1$4,000.00$4,000.00$7,800.00$5,000.00$7,500.00
49Mobilization (624E10000)LS1$15,900$12,500$14,000$10,000$15,000
ODOT contract 250393: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of August 28, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy