Fechko Excavating LLC: ODOT bid record

Fechko Excavating LLC submitted 17 bids on Ohio DOT contracts in the data, from 11 FEB 2021 to 12 NOV 2026, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +10% above the low bid.

Owner
Ohio DOT
Low bid volume
$44,440,445
Latest bid
12 NOV 2026
Data through
12 NOV 2026
17Bids
6Low bids
35Win rate, percent
+10%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
20213133%
202222100%
2023100%
20243133%
2025200%
20266233%
Fechko Excavating LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
MED4375%
GEA200%
CUY2150%
WAY2150%
LOR200%
POR11100%
KNO100%
ASD100%
HUR100%
SUM100%
Fechko Excavating LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1919 (100%)$1.00$1.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY2313 (57%)$30.00$34.00
Removal of existing coatings from concrete surfaces512E74000SY1312 (92%)$28.00$27.00
Concrete reinforcement, replacement of existing concrete reinforcement, as per plan509E20001LB1212 (100%)$2.00$3.41
Patching concrete structure519E11100SF1111 (100%)$150.00$145.00
Field painting of damaged structural steel, as per plan514E20001SF99 (100%)$95.00$150.00
Special - structures: cleaning of bridge seat530E00400EACH99 (100%)$1,500.00$1,750.00
Law enforcement officer with patrol car for assistance614E11110HR148 (57%)$65.00$80.00
Patching concrete structure, as per plan519E11101SF97 (78%)$150.00$150.00
Galvanic anode protection, as per plan844E20001EACH97 (78%)$28.00$53.00
Removal of existing pavement marking512E74500FT77 (100%)$3.25$3.00
Sign, flat sheet630E80100SF176 (35%)$22.50$24.00
Fechko Excavating LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Fechko Excavating LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260501GEAGEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE))3 of 4$2,600,049+16%
12 NOV 2026260505LORLOR-SR 252-03.65 (CULVERT REPLACEMENT)5 of 7$649,936+28%
01 OCT 2026260429MEDMED-SR 3-20.63 (INTERSECTION)1 of 6$1,840,224Low, 2.0% under the second
13 AUG 2026260371SUMSUM-SR 21-01.07 (BRIDGE REPAIR)8 of 9$2,593,927+39%
16 JUL 2026260328CUYCUY-/GEA BH FY2027 Misc (PART 1 AND PART 2) (BRIDGE REPAIR)1 of 4$8,838,828Low, 7.0% under the second
07 MAY 2026260253WAYWAY-SR 94-18.21 (INTERSECTION)2 of 3$2,071,4270.0%
30 JAN 2025250056LORLOR-US 20-02.05 (INTERSECTION)4 of 5$2,312,783+23%
16 JAN 2025250016HURHUR-SR 18-17.10 (INTERSECTION)3 of 7$1,689,764+11%
18 APR 2024240248WAYWAY-SR 57-10.32 (INTERSECTION)1 of 5$1,462,896Low, 2.0% under the second
22 FEB 2024240124ASDASD-US 42-14.77 (PART 1 AND PART 2) (INTERSECTION)4 of 6$4,295,559+3.0%
25 JAN 2024240077KNOKNO-SR 3-32.25 (BRIDGE REPAIR)3 of 6$201,712+3.0%
09 FEB 2023230081CUYCUY-SR 175 Multi-Purpose Trail (SIDEWALK)3 of 8$731,459+5.0%
13 OCT 2022220529PORPOR-SR 43-18.65 (MINOR RECONSTRUCTION)1 of 7$5,902,535Low, 6.0% under the second
10 MAR 2022220147MEDMED-SR 57-01.36 (PART 1 AND PART 2) (MINOR RECONSTRUCTION)1 of 4$3,621,774Low, 1.0% under the second
16 SEP 2021210491GEAGEA-US 422-00.30 Slope (SLIDE REPAIR)3 of 6$311,498+10%
29 APR 2021210240MEDMED-SR 3-09.04 (INTERSECTION)2 of 8$1,119,187+3.0%
11 FEB 2021210002MEDMED-SR 18-12.99 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION)1 of 8$22,774,188Low, 4.0% under the second
Fechko Excavating LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy