Fechko Excavating LLC: ODOT bid record
Fechko Excavating LLC submitted 17 bids on Ohio DOT contracts in the data, from 11 FEB 2021 to 12 NOV 2026, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $44,440,445
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 3 | 1 | 33% |
| 2022 | 2 | 2 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 1 | 33% |
| 2025 | 2 | 0 | 0% |
| 2026 | 6 | 2 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MED | 4 | 3 | 75% |
| GEA | 2 | 0 | 0% |
| CUY | 2 | 1 | 50% |
| WAY | 2 | 1 | 50% |
| LOR | 2 | 0 | 0% |
| POR | 1 | 1 | 100% |
| KNO | 1 | 0 | 0% |
| ASD | 1 | 0 | 0% |
| HUR | 1 | 0 | 0% |
| SUM | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 19 | 19 (100%) | $1.00 | $1.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 23 | 13 (57%) | $30.00 | $34.00 |
| Removal of existing coatings from concrete surfaces | 512E74000 | SY | 13 | 12 (92%) | $28.00 | $27.00 |
| Concrete reinforcement, replacement of existing concrete reinforcement, as per plan | 509E20001 | LB | 12 | 12 (100%) | $2.00 | $3.41 |
| Patching concrete structure | 519E11100 | SF | 11 | 11 (100%) | $150.00 | $145.00 |
| Field painting of damaged structural steel, as per plan | 514E20001 | SF | 9 | 9 (100%) | $95.00 | $150.00 |
| Special - structures: cleaning of bridge seat | 530E00400 | EACH | 9 | 9 (100%) | $1,500.00 | $1,750.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 14 | 8 (57%) | $65.00 | $80.00 |
| Patching concrete structure, as per plan | 519E11101 | SF | 9 | 7 (78%) | $150.00 | $150.00 |
| Galvanic anode protection, as per plan | 844E20001 | EACH | 9 | 7 (78%) | $28.00 | $53.00 |
| Removal of existing pavement marking | 512E74500 | FT | 7 | 7 (100%) | $3.25 | $3.00 |
| Sign, flat sheet | 630E80100 | SF | 17 | 6 (35%) | $22.50 | $24.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 11 | 4 of 11 |
| Karvo Companies Inc | 8 | 4 of 8 |
| Eclipse Co LLC | 8 | 1 of 8 |
| Tri-Mor Corp | 7 | 1 of 7 |
| Digioia-Suburban Excavating LLC | 4 | 0 of 4 |
| Perk Company Inc | 4 | 1 of 4 |
| Great Lakes Construction Co | 3 | 1 of 3 |
| S E T Inc | 3 | 0 of 3 |
| D L Smith Concrete LLC | 3 | 1 of 3 |
| Fabrizi Trucking & Paving Co Inc | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260501 | GEA | GEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $2,600,049 | +16% |
| 12 NOV 2026 | 260505 | LOR | LOR-SR 252-03.65 (CULVERT REPLACEMENT) | 5 of 7 | $649,936 | +28% |
| 01 OCT 2026 | 260429 | MED | MED-SR 3-20.63 (INTERSECTION) | 1 of 6 | $1,840,224 | Low, 2.0% under the second |
| 13 AUG 2026 | 260371 | SUM | SUM-SR 21-01.07 (BRIDGE REPAIR) | 8 of 9 | $2,593,927 | +39% |
| 16 JUL 2026 | 260328 | CUY | CUY-/GEA BH FY2027 Misc (PART 1 AND PART 2) (BRIDGE REPAIR) | 1 of 4 | $8,838,828 | Low, 7.0% under the second |
| 07 MAY 2026 | 260253 | WAY | WAY-SR 94-18.21 (INTERSECTION) | 2 of 3 | $2,071,427 | 0.0% |
| 30 JAN 2025 | 250056 | LOR | LOR-US 20-02.05 (INTERSECTION) | 4 of 5 | $2,312,783 | +23% |
| 16 JAN 2025 | 250016 | HUR | HUR-SR 18-17.10 (INTERSECTION) | 3 of 7 | $1,689,764 | +11% |
| 18 APR 2024 | 240248 | WAY | WAY-SR 57-10.32 (INTERSECTION) | 1 of 5 | $1,462,896 | Low, 2.0% under the second |
| 22 FEB 2024 | 240124 | ASD | ASD-US 42-14.77 (PART 1 AND PART 2) (INTERSECTION) | 4 of 6 | $4,295,559 | +3.0% |
| 25 JAN 2024 | 240077 | KNO | KNO-SR 3-32.25 (BRIDGE REPAIR) | 3 of 6 | $201,712 | +3.0% |
| 09 FEB 2023 | 230081 | CUY | CUY-SR 175 Multi-Purpose Trail (SIDEWALK) | 3 of 8 | $731,459 | +5.0% |
| 13 OCT 2022 | 220529 | POR | POR-SR 43-18.65 (MINOR RECONSTRUCTION) | 1 of 7 | $5,902,535 | Low, 6.0% under the second |
| 10 MAR 2022 | 220147 | MED | MED-SR 57-01.36 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | 1 of 4 | $3,621,774 | Low, 1.0% under the second |
| 16 SEP 2021 | 210491 | GEA | GEA-US 422-00.30 Slope (SLIDE REPAIR) | 3 of 6 | $311,498 | +10% |
| 29 APR 2021 | 210240 | MED | MED-SR 3-09.04 (INTERSECTION) | 2 of 8 | $1,119,187 | +3.0% |
| 11 FEB 2021 | 210002 | MED | MED-SR 18-12.99 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION) | 1 of 8 | $22,774,188 | Low, 4.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.