ODOT contract 250056 bid tabulation
LOR-US 20-02.05 (INTERSECTION). Let by Ohio DOT on January 30, 2025, LOR. 5 bids received; low bid $1,885,439 by Great Lakes Demolition Company, -31% against the engineer's estimate of $2,744,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 137
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Demolition Company | $1,885,439 | Low | -31% |
| 2 | Smith Paving & Excavating Inc | $2,073,591 | +10% | -24% |
| 3 | Karvo Companies Inc | $2,218,439 | +18% | -19% |
| 4 | Fechko Excavating LLC | $2,312,783 | +23% | -16% |
| 5 | Eclipse Co LLC | $2,445,202 | +30% | -11% |
Engineer's estimate: $2,744,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Demolition Company | 2. Smith Paving & Excavating Inc | 3. Karvo Companies Inc | 4. Fechko Excavating LLC | 5. Eclipse Co LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,000.00 | $38,000 | $40,000 | $1,750.00 | $6,500.00 |
| 2 | Pavement removed (202E23000) | SY | 7,074 | $5.00 | $8.00 | $11.00 | $10.50 | $16.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 2,448 | $12.00 | $3.00 | $14.00 | $29.00 | $25.00 |
| 4 | Guardrail removed (202E38000) | FT | 113 | $2.00 | $2.00 | $2.00 | $2.00 | $3.00 |
| 5 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $100.00 | $95.00 | $100.00 | $95.00 | $105.00 |
| 6 | Anchor assembly removed, type B (202E42050) | EACH | 1 | $100.00 | $145.00 | $100.00 | $145.00 | $158.00 |
| 7 | Bridge terminal assembly removed (202E47000) | EACH | 2 | $100.00 | $75.00 | $100.00 | $75.00 | $79.00 |
| 8 | Catch basin removed (202E58100) | EACH | 9 | $450.00 | $550.00 | $195.00 | $850.00 | $565.00 |
| 9 | Special - fill and plug existing conduit (202E70000) | FT | 20 | $50.00 | $50.00 | $33.00 | $29.00 | $98.00 |
| 10 | Removal misc.: concrete bin blocks (202E98100) | EACH | 12 | $100.00 | $50.00 | $38.00 | $260.00 | $110.00 |
| 11 | Excavation (203E10000) | CY | 4,027 | $15.00 | $22.50 | $24.50 | $38.00 | $31.00 |
| 12 | Embankment (203E20000) | CY | 1,672 | $12.00 | $19.00 | $20.00 | $11.00 | $20.00 |
| 13 | Subgrade compaction (204E10000) | SY | 783 | $2.00 | $2.00 | $1.90 | $4.00 | $1.00 |
| 14 | Proof rolling (204E45000) | HR | 5 | $200.00 | $100.00 | $255.00 | $420.00 | $979.00 |
| 15 | Cement (205E10550) | TON | 252 | $185.00 | $200.00 | $200.00 | $185.00 | $190.00 |
| 16 | Curing coat (206E11000) | SY | 8,320 | $1.60 | $1.15 | $1.15 | $1.30 | $1.40 |
| 17 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 8,320 | $3.15 | $3.65 | $3.20 | $4.85 | $5.00 |
| 18 | Reshaping under guardrail (209E15000) | STA | 3 | $55.00 | $50.00 | $45.00 | $50.00 | $150.00 |
| 19 | Guardrail, type 5 (606E13000) | FT | 50 | $16.00 | $25.60 | $16.00 | $25.60 | $26.00 |
| 20 | Guardrail, type MGS (606E15050) | FT | 175 | $18.00 | $26.40 | $18.00 | $26.40 | $29.00 |
| 21 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,300.00 | $2,720.00 | $2,300.00 | $2,720.00 | $2,984.00 |
| 22 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,150.00 | $1,440.00 | $1,150.00 | $1,440.00 | $1,639.00 |
| 23 | Bridge terminal assembly, type 4 (606E35140) | EACH | 2 | $1,100.00 | $1,250.00 | $1,100.00 | $1,250.00 | $1,450.00 |
| 24 | Barrier reflector, type 2, bidirectional (614E13312) | EACH | 2 | $11.00 | $14.50 | $11.00 | $14.50 | $14.00 |
| 25 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $3,000.00 | $3,000.00 | $2,980.00 | $4,000.00 | $3,940.00 |
| 26 | Special - pavement overlay fabric composite (690E12060) | SY | 179 | $54.00 | $58.00 | $5.00 | $53.75 | $40.00 |
| 27 | Special - mailbox support system, single (690E50100) | EACH | 1 | $200.00 | $340.00 | $145.00 | $340.00 | $163.00 |
| 28 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 9 | $120.00 | $150.00 | $195.00 | $84.00 | $201.00 |
| 29 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 77 | $60.00 | $100.00 | $110.00 | $86.00 | $140.00 |
| 30 | Rock channel protection, type C with filter (601E32200) | CY | 3 | $350.00 | $215.00 | $585.00 | $125.00 | $300.00 |
| 31 | Soil analysis test (659E00100) | EACH | 2 | $200.00 | $200.00 | $300.00 | $150.00 | $210.00 |
| 32 | Topsoil (659E00300) | CY | 1,029 | $50.00 | $30.00 | $27.00 | $38.00 | $59.00 |
| 33 | Seeding and mulching (659E10000) | SY | 8,209 | $2.00 | $1.55 | $0.89 | $2.00 | $2.50 |
| 34 | Repair seeding and mulching (659E14000) | SY | 411 | $1.00 | $2.50 | $3.00 | $2.00 | $1.00 |
| 35 | Inter-seeding (659E15000) | SY | 411 | $1.00 | $2.50 | $0.10 | $2.00 | $0.11 |
| 36 | Commercial fertilizer (659E20000) | TON | 1.15 | $1,000.00 | $1,500.00 | $1,500.00 | $1,650.00 | $736.00 |
| 37 | Lime (659E31000) | ACRE | 1.70 | $800.00 | $600.00 | $0.10 | $200.00 | $92.00 |
| 38 | Water (659E35000) | MGAL | 45 | $1.00 | $10.00 | $0.10 | $50.00 | $1.00 |
| 39 | Mowing (659E40000) | MSF | 19 | $100.00 | $50.00 | $0.10 | $36.00 | $58.00 |
| 40 | Ditch erosion protection (670E00700) | SY | 1,061 | $3.00 | $2.50 | $2.50 | $4.00 | $3.00 |
| 41 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,500.00 | $1,100.00 | $3,475.00 | $3,475.00 | $3,652.00 |
| 42 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,500.00 | $3,300.00 | $6,720.00 | $14,280 | $10,719 |
| 43 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,500 | $12,600 | $7,500.00 | $12,820 | $13,467 |
| 44 | Erosion control (832E30000) | EACH | 69,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 45 | Concrete masonry (602E20000) | CY | 1.03 | $1,800.00 | $4,000.00 | $3,100.00 | $2,000.00 | $2,436.00 |
| 46 | 6" unclassified pipe underdrains (605E13300) | FT | 708 | $10.00 | $11.00 | $12.00 | $23.00 | $24.00 |
| 47 | 6" unclassified pipe underdrains, as per plan (605E13301) | FT | 100 | $12.00 | $11.00 | $15.00 | $23.00 | $38.00 |
| 48 | 6" base pipe underdrains (605E14000) | FT | 3,611 | $10.00 | $11.00 | $9.25 | $13.00 | $24.00 |
| 49 | Aggregate drains (605E31100) | FT | 50 | $20.00 | $9.00 | $25.00 | $25.00 | $19.00 |
| 50 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 186 | $25.00 | $10.50 | $19.00 | $10.00 | $45.00 |
| 51 | 6" conduit, type F, as per plan (611E01501) | FT | 100 | $25.00 | $10.50 | $18.00 | $15.00 | $38.00 |
| 52 | 12" conduit, type B (611E04400) | FT | 91 | $70.00 | $87.70 | $108.00 | $73.00 | $122.00 |
| 53 | 12" conduit, type D (611E04900) | FT | 74 | $40.00 | $41.80 | $70.00 | $35.00 | $92.00 |
| 54 | 15" conduit, type C (611E06100) | FT | 438 | $40.00 | $52.50 | $80.00 | $70.00 | $99.00 |
| 55 | 18" conduit, type C (611E07600) | FT | 84 | $55.00 | $70.20 | $75.00 | $73.00 | $109.00 |
| 56 | 24" conduit, type B (611E10400) | FT | 67 | $75.00 | $121.00 | $150.00 | $115.00 | $141.00 |
| 57 | 24" conduit, type C (611E10600) | FT | 190 | $90.00 | $91.70 | $115.00 | $99.00 | $121.00 |
| 58 | 30" conduit, type B (611E13400) | FT | 153 | $110.00 | $165.50 | $190.00 | $158.00 | $156.00 |
| 59 | 30" conduit, type C (611E13600) | FT | 79 | $100.00 | $109.60 | $140.00 | $121.00 | $140.00 |
| 60 | 36" conduit, type C (611E16600) | FT | 503 | $110.00 | $132.00 | $125.00 | $127.00 | $155.00 |
| 61 | 19" X 30" conduit, type C, 706.04 (611E52304) | FT | 456 | $140.00 | $136.00 | $190.00 | $117.00 | $162.00 |
| 62 | Catch basin, no. 3 (611E98150) | EACH | 1 | $2,850.00 | $4,950.00 | $3,400.00 | $3,500.00 | $5,462.00 |
| 63 | Catch basin, no. 3A (611E98180) | EACH | 1 | $2,750.00 | $3,325.00 | $2,400.00 | $2,500.00 | $4,876.00 |
| 64 | Catch basin, no. 8 (611E98410) | EACH | 3 | $4,850.00 | $6,250.00 | $3,500.00 | $3,100.00 | $8,783.00 |
| 65 | Catch basin, no. 8A (611E98434) | EACH | 1 | $8,850.00 | $10,400 | $6,000.00 | $6,600.00 | $10,383 |
| 66 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $1,850.00 | $2,675.00 | $1,700.00 | $2,000.00 | $4,059.00 |
| 67 | Catch basin, no. 2-3 (611E98510) | EACH | 4 | $2,800.00 | $4,725.00 | $2,400.00 | $3,500.00 | $4,839.00 |
| 68 | Catch basin, no. 2-4 (611E98540) | EACH | 1 | $3,000.00 | $4,175.00 | $2,400.00 | $3,600.00 | $4,938.00 |
| 69 | Manhole, no. 3 (611E99574) | EACH | 3 | $5,650.00 | $7,650.00 | $4,500.00 | $5,800.00 | $7,466.00 |
| 70 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $500.00 | $400.00 | $465.00 | $300.00 | $532.00 |
| 71 | Pavement planing, asphalt concrete, 3.25" (254E01000) | SY | 1,866 | $6.00 | $7.00 | $5.50 | $6.00 | $4.20 |
| 72 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,289 | $190.00 | $175.00 | $199.00 | $190.00 | $175.00 |
| 73 | Aggregate base (304E20000) | CY | 1,679 | $70.00 | $62.00 | $69.00 | $64.00 | $73.50 |
| 74 | Tack coat (407E10000) | GAL | 1,190 | $3.00 | $2.60 | $2.75 | $3.25 | $3.00 |
| 75 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 326 | $230.00 | $248.00 | $277.00 | $240.00 | $248.00 |
| 76 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 456 | $210.00 | $225.00 | $256.00 | $235.00 | $225.00 |
| 77 | Asphalt concrete surface course, 12.5 MM, type A (449) (driveways) (442E22120) | CY | 12 | $300.00 | $450.00 | $480.00 | $400.00 | $450.00 |
| 78 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (driveways) (442E22320) | CY | 14 | $300.00 | $400.00 | $510.00 | $400.00 | $400.00 |
| 79 | Non-reinforced concrete pavement, misc.:12.25" tru (452E19200) | SY | 443 | $98.00 | $137.00 | $115.00 | $169.00 | $98.00 |
| 80 | Combination curb and gutter, type 2 (609E12000) | FT | 1,791 | $18.00 | $22.25 | $29.00 | $33.00 | $18.00 |
| 81 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 80 | $18.00 | $26.00 | $32.00 | $55.00 | $18.00 |
| 82 | Curb, type 2-A (609E14000) | FT | 365 | $10.00 | $13.25 | $13.25 | $14.00 | $10.00 |
| 83 | Combination curb and gutter, type 3, as per plan (609E18001) | FT | 443 | $18.00 | $30.50 | $21.00 | $33.00 | $18.00 |
| 84 | Curb, type 6 (609E26000) | FT | 1,537 | $11.00 | $15.50 | $21.00 | $23.00 | $11.00 |
| 85 | 6" concrete traffic island, as per plan (609E54001) | SY | 656 | $75.00 | $78.00 | $83.00 | $118.00 | $75.00 |
| 86 | 4" conduit, type E, as per plan (611E00401) | FT | 50 | $2.00 | $12.00 | $5.00 | $15.00 | $14.00 |
| 87 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $500.00 | $400.00 | $350.00 | $650.00 | $381.00 |
| 88 | Connection, fused pull apart (625E00450) | EACH | 16 | $140.00 | $110.00 | $120.00 | $145.00 | $111.00 |
| 89 | Connection, unfused permanent, as per plan (625E00481) | EACH | 12 | $120.00 | $110.00 | $120.00 | $145.00 | $111.00 |
| 90 | Light pole, conventional (AT08B40) (625E10490) | EACH | 7 | $3,900.00 | $3,650.00 | $3,000.00 | $3,100.00 | $3,700.00 |
| 91 | Light pole, conventional (AT12B40) (625E10490) | EACH | 1 | $4,100.00 | $3,850.00 | $3,500.00 | $3,100.00 | $3,900.00 |
| 92 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 8 | $1,600.00 | $1,900.00 | $1,250.00 | $1,800.00 | $1,910.00 |
| 93 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 4,539 | $3.50 | $3.80 | $2.50 | $4.05 | $4.00 |
| 94 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,164 | $2.00 | $2.00 | $1.25 | $2.10 | $2.00 |
| 95 | Conduit, 3", 725.05 (625E25502) | FT | 952 | $6.00 | $10.50 | $10.00 | $9.50 | $11.00 |
| 96 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 119 | $55.00 | $47.00 | $65.00 | $105.00 | $50.00 |
| 97 | Luminaire, conventional, solid state (LED), type I (625E26252) | EACH | 8 | $450.00 | $425.00 | $500.00 | $700.00 | $450.00 |
| 98 | Trench, 24" deep (625E29002) | FT | 952 | $12.00 | $13.00 | $12.00 | $14.00 | $13.00 |
| 99 | Pull box, 725.08, 24", as per plan (625E30707) | EACH | 5 | $1,600.00 | $1,400.00 | $2,000.00 | $1,250.00 | $1,400.00 |
| 100 | Ground rod (625E32000) | EACH | 8 | $300.00 | $265.00 | $200.00 | $350.00 | $270.00 |
| 101 | Power service, as per plan (625E34001) | EACH | 1 | $8,000.00 | $8,450.00 | $10,000 | $6,800.00 | $8,500.00 |
| 102 | Underground warning marking tape (625E36010) | FT | 952 | $2.00 | $3.40 | $2.00 | $3.50 | $4.00 |
| 103 | Arc flash calculations and label, lighting control (625E76000) | EACH | 1 | $3,200.00 | $3,500.00 | $500.00 | $2,200.00 | $3,600.00 |
| 104 | Controller work pad, as per plan (633E67201) | EACH | 1 | $500.00 | $536.00 | $1,250.00 | $900.00 | $540.00 |
| 105 | RPM (621E00100) | EACH | 166 | $52.00 | $53.50 | $51.00 | $53.50 | $39.00 |
| 106 | Ground mounted support, no. 3 post (630E03100) | FT | 320.70 | $10.00 | $10.00 | $10.00 | $12.00 | $16.00 |
| 107 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 59.60 | $10.00 | $10.00 | $10.00 | $13.00 | $20.00 |
| 108 | Ground mounted support, no. 4 post (630E04100) | FT | 116.40 | $10.00 | $10.00 | $10.00 | $14.00 | $20.00 |
| 109 | Sign post reflector (630E08600) | EACH | 4 | $25.00 | $25.00 | $25.00 | $65.00 | $47.00 |
| 110 | Sign, flat sheet (630E80100) | SF | 333.40 | $16.00 | $15.50 | $15.50 | $16.00 | $20.50 |
| 111 | Removal of ground mounted sign and storage (630E85000) | EACH | 41 | $20.00 | $20.00 | $20.00 | $55.00 | $15.00 |
| 112 | Removal of ground mounted post support and disposal (630E86002) | EACH | 32 | $15.00 | $15.00 | $15.00 | $55.00 | $16.00 |
| 113 | Removal of traffic signal installation (632E90100) | EACH | 1 | $5,000.00 | $3,000.00 | $3,000.00 | $2,800.00 | $2,630.00 |
| 114 | Edge line, 4" (644E00100) | MI | 0.83 | $4,000.00 | $4,000.00 | $4,000.00 | $3,200.00 | $4,834.00 |
| 115 | Edge line, 4" (644E00100) | MI | 0.53 | $4,000.00 | $4,000.00 | $4,000.00 | $3,200.00 | $4,834.00 |
| 116 | Center line (644E00300) | MI | 0.41 | $5,000.00 | $5,000.00 | $5,000.00 | $8,500.00 | $5,570.00 |
| 117 | Transverse/diagonal line (644E00700) | FT | 106 | $6.00 | $6.00 | $6.00 | $8.00 | $8.00 |
| 118 | Dotted line, 4" (644E01500) | FT | 176 | $1.00 | $0.70 | $0.70 | $3.00 | $3.00 |
| 119 | Yield line (644E20800) | FT | 71 | $15.00 | $15.00 | $15.00 | $15.00 | $7.00 |
| 120 | Geotextile fabric (204E50000) | SY | 416 | $3.00 | $4.15 | $4.02 | $4.00 | $3.00 |
| 121 | Riprap for tree protection, as per plan (657E10001) | SY | 416 | $45.00 | $32.00 | $28.68 | $40.00 | $37.00 |
| 122 | Deciduous shrub, 12" height, rhus aromatica, 3 gal (661E19000) | EACH | 20 | $120.00 | $150.00 | $95.49 | $180.00 | $126.00 |
| 123 | Evergreen tree, 2' height, pinus mugo, 5 gal (661E50040) | EACH | 5 | $300.00 | $200.00 | $130.20 | $400.00 | $315.00 |
| 124 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $180.00 | $95.00 | $125.00 | $75.00 | $68.00 |
| 125 | Detour signing (614E12420) | LS | 1 | $8,500.00 | $7,200.00 | $7,200.00 | $25,200 | $11,750 |
| 126 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $400.00 | $400.00 | $280.00 | $240.00 | $410.00 |
| 127 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $900.00 | $800.00 | $800.00 | $900.00 | $631.00 |
| 128 | Business entrance sign (614E40050) | EACH | 2 | $200.00 | $100.00 | $100.00 | $400.00 | $420.00 |
| 129 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $35,000 | $46,000 | $50,000 | $25,000 | $85,000 |
| 130 | Water (616E10000) | MGAL | 15 | $1.00 | $10.00 | $100.00 | $50.00 | $57.00 |
| 131 | Removal misc.:polymer modified asphalt expansion J (202E98200) | FT | 80 | $30.00 | $55.46 | $75.00 | $160.00 | $49.00 |
| 132 | Polymer modified asphalt expansion joint system (846E00110) | CF | 66 | $465.00 | $519.06 | $500.00 | $1,200.00 | $481.00 |
| 133 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $18,000 | $21,500 | $20,000 | $19,500 | $35,000 |
| 134 | Maintaining traffic (614E11000) | LS | 1 | $12,000 | $11,000 | $45,000 | $24,000 | $45,000 |
| 135 | Field office, type B (619E16010) | MNTH | 8 | $1,500.00 | $1,000.00 | $2,700.00 | $1,850.00 | $683.00 |
| 136 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $38,500 | $29,840 | $29,750 | $24,268 |
| 137 | Mobilization (624E10000) | LS | 1 | $84,000 | $97,000 | $100,000 | $47,250 | $96,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.