Fabrizi Trucking & Paving Co Inc: ODOT bid record
Fabrizi Trucking & Paving Co Inc submitted 22 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 2 of them (9%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,473,239
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 4 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 1 | 0 | 0% |
| 2025 | 2 | 1 | 50% |
| 2026 | 3 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 7 | 1 | 14% |
| MED | 5 | 0 | 0% |
| LOR | 3 | 0 | 0% |
| STA | 2 | 0 | 0% |
| HUR | 1 | 0 | 0% |
| GEA | 1 | 0 | 0% |
| POR | 1 | 0 | 0% |
| LIC | 1 | 0 | 0% |
| SUM | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 23 | 23 (100%) | $1.00 | $1.00 |
| Aggregate base | 304E20000 | CY | 20 | 10 (50%) | $63.00 | $90.00 |
| Water | 616E10000 | MGAL | 16 | 10 (63%) | $10.00 | $20.00 |
| Excavation | 203E10000 | CY | 24 | 9 (38%) | $18.00 | $27.00 |
| Embankment | 203E20000 | CY | 23 | 7 (30%) | $12.00 | $25.00 |
| Repair seeding and mulching | 659E14000 | SY | 21 | 6 (29%) | $1.50 | $1.25 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 17 | 5 (29%) | $950.00 | $950.00 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 15 | 5 (33%) | $1.80 | $1.75 |
| Headwall removed | 202E20010 | EACH | 7 | 5 (71%) | $100.00 | $503.00 |
| Sign, flat sheet | 630E80100 | SF | 18 | 4 (22%) | $18.50 | $24.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 15 | 4 (27%) | $13.00 | $15.20 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 14 | 4 (29%) | $66.50 | $80.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lockhart Concrete Co | 11 | 3 of 11 |
| Eclipse Co LLC | 11 | 5 of 11 |
| Karvo Companies Inc | 10 | 9 of 10 |
| Shelly & Sands Inc | 9 | 4 of 9 |
| Digioia-Suburban Excavating LLC | 8 | 6 of 8 |
| Perk Company Inc | 7 | 6 of 7 |
| Tri-Mor Corp | 7 | 3 of 7 |
| S E T Inc | 6 | 2 of 6 |
| Catts Construction Inc | 5 | 4 of 5 |
| Great Lakes Construction Co | 5 | 4 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260505 | LOR | LOR-SR 252-03.65 (CULVERT REPLACEMENT) | 7 of 7 | $846,072 | +66% |
| 27 AUG 2026 | 260382 | CUY | CUY-East 66th Street TLCI (MINOR RECONSTRUCTION) | 3 of 3 | $10,266,313 | +19% |
| 15 JAN 2026 | 260010 | CUY | CUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION) | 8 of 9 | $2,747,715 | +47% |
| 08 MAY 2025 | 250261 | SUM | SUM-Barberton Sidewalks (SIDEWALK) | 1 of 3 | $750,534 | Low, 3.0% under the second |
| 13 FEB 2025 | 250084 | CUY | CUY-IR 90-19.77/VAR Ramps (MINOR RECONSTRUCTION) | 6 of 6 | $3,886,351 | +50% |
| 18 APR 2024 | 240257 | MED | MED-SR 57/SR 94-09.78/18.84 (CULVERT REPLACEMENT) | 4 of 7 | $616,415 | +11% |
| 12 JAN 2023 | 230029 | CUY | CUY-US 20-03.49 Replace (CULVERT REPLACEMENT) | 1 of 7 | $1,722,705 | Low, -43% under the second |
| 14 APR 2022 | 220210 | LOR | LOR-SR 83-02.48 (INTERSECTION) | 3 of 3 | $4,299,412 | +4.0% |
| 31 MAR 2022 | 220208 | LIC | LIC-SR 13-09.54 (INTERSECTION) | 6 of 6 | $1,602,916 | +11% |
| 10 MAR 2022 | 220133 | CUY | CUY-West Franklin Boulevard (MINOR RECONSTRUCTION) | 2 of 2 | $4,918,787 | +43% |
| 27 JAN 2022 | 220042 | CUY | CUY-Ashton Lane Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $534,109 | -23% |
| 16 DEC 2021 | 210590 | STA | STA-US 62-24.14 (MAJOR RECONSTRUCTION) | 9 of 9 | $18,297,345 | +34% |
| 12 AUG 2021 | 210472 | MED | MED-SR 57-17.65 (CULVERT REPLACEMENT) | 4 of 11 | $1,514,400 | +14% |
| 15 APR 2021 | 210244 | STA | STA-SR 241-09.71 (MINOR RECONSTRUCTION) | 4 of 7 | $8,102,636 | +13% |
| 25 FEB 2021 | 210071 | POR | POR-SR 14-03.65 (MINOR RECONSTRUCTION) | 9 of 10 | $5,809,485 | +25% |
| 11 FEB 2021 | 210002 | MED | MED-SR 18-12.99 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION) | 6 of 8 | $26,760,673 | +18% |
| 05 NOV 2020 | 200492 | GEA | GEA-County-wide Safety Projects (PART 1, 2, 3) (MAJOR WIDENING) | 5 of 9 | $12,666,579 | +8.0% |
| 04 JUN 2020 | 200323 | MED | MED-SR 3/SR 94-24.34/20.11 (CULVERT REPLACEMENT) | 3 of 8 | $431,513 | +9.0% |
| 21 MAY 2020 | 200304 | HUR | HUR-SR 60/SR 99-10.78/08.04 (CULVERT REPLACEMENT) | 4 of 7 | $398,012 | +22% |
| 23 APR 2020 | 200241 | MED | MED-SR 3-12.00 (CULVERT REPLACEMENT) | 3 of 9 | $492,334 | +9.0% |
| 13 FEB 2020 | 200063 | LOR | LOR-SR 113-07.76 (CULVERT REPLACEMENT) | 3 of 8 | $325,821 | +15% |
| 23 JAN 2020 | 200008 | CUY | CUY-SR 3-06.22 (SPOT PATCHING / PAVEMENT REPAIR) | 6 of 8 | $5,272,954 | +24% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.