ODOT contract 260382 bid tabulation

CUY-East 66th Street TLCI (MINOR RECONSTRUCTION). Let by Ohio DOT on August 27, 2026, CUY. 3 bids received; low bid $8,636,872 by Perk Company Inc, +6.5% against the engineer's estimate of $8,110,000.

Owner
Ohio DOT
Letting
27 AUG 2026
Pay items
180
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Perk Company Inc$8,636,872Low+6.0%
2Anthony Allega Cement Contractor Inc$9,375,801+9.0%+16%
3Fabrizi Trucking & Paving Co Inc$10,266,313+19%+27%
ODOT contract 260382: bids by rank

Engineer's estimate: $8,110,000.

Bid tabulation

LinePay itemUnitQuantity1. Perk Company Inc2. Anthony Allega Cement Contractor Inc3. Fabrizi Trucking & Paving Co Inc
1Clearing and grubbing (201E11000)LS1$2,500.00$11,880$15,000
2Pavement removed (202E23000)SY7,729$22.60$14.00$34.00
3Concrete median removed (202E30600)SY52$22.60$16.33$24.00
4Curb removed (202E32000)FT9,360$4.00$5.51$9.00
5Pipe removed, 24" and under (202E35100)FT803$104.00$69.91$20.00
6Guardrail removed (202E38000)FT144$9.50$9.37$20.00
7Manhole removed (202E58000)EACH2$1,794.00$1,209.85$2,500.00
8Catch basin removed, as per plan (202E58101)EACH50$803.00$1,016.23$400.00
9Fence removed (202E75000)FT500$4.50$5.40$20.00
10Meter vault removed, as per plan (202E75601)EACH4$2,820.00$1,209.84$1,850.00
11Valve box removed, as per plan (202E75611)EACH5$249.00$679.64$200.00
12Removal misc.:pole removed (202E98100)EACH33$950.00$825.00$775.00
13Removal misc.:water service stop box (202E98100)EACH83$232.65$115.49$75.00
14Removal misc.:track removed (202E98300)SY250$28.50$90.39$54.00
15Removal misc.:walks and drives removed (202E98400)SF53,436$2.25$1.93$2.20
16Subgrade compaction (204E10000)SY9,459$2.00$1.34$4.00
17Linear grading, as per plan (209E60201)STA46$550.00$1,327.20$850.00
184" concrete walk, as per plan (608E10001)SF20,266$13.00$9.70$10.00
19Curb ramp, as per plan (608E52001)SF8,502$35.25$34.84$29.00
20Walkway, misc.:colored concrete bands (608E98000)SF684$57.50$61.57$81.50
21Monument assembly adjusted to grade, as per plan (623E39501)EACH5$1,350.00$1,025.03$750.00
22Monument, misc.:city of cleveland monument assembl (623E40900)EACH2$1,350.00$1,546.47$950.00
23Topsoil furnished and placed (653E10000)CY750$65.00$71.50$70.00
24Seeding and mulching, class 1 (659E00500)SY6,500$2.88$3.17$2.50
25Commercial fertilizer (659E20000)TON0.90$1,250.00$1,375.00$2,000.00
26Lime (659E31000)ACRE1.40$1,750.00$1,925.00$500.00
27Water (659E35000)MGAL18$100.00$206.25$150.00
28Erosion control (832E30000)EACH100,000$1.00$1.00$1.00
294" unclassified pipe underdrains, as per plan (605E05201)FT9,158$21.60$17.03$14.50
30Catch basin, no. 2-2B, as per plan (611E98471)EACH5$8,300.00$4,640.38$11,605
31Catch basin, no. 2-2B, as per plan (611E98471)EACH8$7,500.00$4,235.95$12,250
32Catch basin, misc.:city of cleveland CB-1 (611E98690)EACH53$9,500.00$7,964.08$14,295
33Catch basin, misc.:city of cleveland CB-2 (611E98690)EACH5$6,598.00$10,872$16,395
34Manhole adjusted to grade (611E99654)EACH32$1,350.00$1,716.26$1,250.00
35Special - miscellaneous metal (611E99820)LB5,000$3.50$2.48$2.60
36Drainage structure, misc.:utility test hole (611E99900)EACH10$927.00$1,144.74$1,500.00
3812" conduit, type B, as per plan (611E04401)FT1,253$100.00$527.31$395.00
39Partial depth pavement repair (441), as per plan (251E01001)SY500$62.00$88.00$81.00
40Pavement planing, asphalt concrete, as per plan (T (254E01001)SY10,488$5.75$4.57$6.75
41Full depth pavement removal and rigid replacement, type 2, class QC1, as per plan (255E12001)SY500$213.00$266.68$168.00
42Aggregate base, as per plan (304E20001)CY1,756$88.00$95.63$78.00
439" concrete base, class QC 1P, as per plan (305E13011)SY4,213$123.00$88.97$192.00
44Tack coat (407E10000)GAL2,279$4.00$3.30$4.00
45Asphalt concrete surface course, type 1, (449), as per plan (441E70101)CY622$304.00$346.50$304.00
46Asphalt concrete intermediate course, type 2, (449) (441E70300)CY881$262.00$258.50$262.00
47Asphalt concrete intermediate course, type 2, (449) (441E70300)CY29$700.00$297.00$700.00
48Reinforced concrete pavement, misc.:decorative con (451E20000)SY526$515.00$569.12$487.00
49Reinforced concrete pavement, misc.:decorative con (451E20000)SY261$490.00$209.16$376.00
506" non-reinforced concrete pavement, class QC MS, as per plan (452E10051)SY488$120.00$222.13$109.00
518" non-reinforced concrete pavement, class QC MS, as per plan (452E12051)SY424$130.00$218.61$133.00
52Non-reinforced concrete pavement, misc.:surcharge (452E19200)SY500$7.00$6.16$30.00
53Curb, type 6, as per plan (609E26001)FT9,539$28.00$33.46$31.00
54Concrete median (609E71000)SF189$20.00$56.38$11.50
55Special - miscellaneous metal (611E99820)LB1,000$4.50$2.48$5.00
56Fire hydrant removed and disposed of (638E10700)EACH7$725.00$897.49$7,005.00
57Special - valve box adjusted to grade, (cleveland) (638E20500)EACH42$1,100.00$1,024.82$625.00
58Special - shorten water service connection, (cleve (638E20792)FT32$704.00$419.98$300.00
59Special - extend 3/4" copper water service connection (638E20802)FT72$627.00$237.69$300.00
60Special - service box adjusted to grade, (clevelan (638E20902)EACH35$250.00$571.53$375.00
61Special - fire hydrant adjusted to grade, (clevela (638E21400)EACH6$2,745.00$3,268.48$4,510.00
62Water work, misc.:furnishing and setting 6" hydran (638E98000)EACH8$13,163$14,451$15,025
63Water work, misc.:meter and meter vault removed an (638E98000)EACH8$5,295.00$8,367.26$12,500
64Water work, misc.:replacement of owner side lead W (638E98000)EACH3$4,955.00$6,529.08$8,500.00
65Water work, misc.:retap and reconnect water servic (638E98000)EACH16$4,487.00$5,998.62$6,390.00
66Water work, misc.:retap and reconnect water servic (638E98000)EACH9$3,070.00$5,827.15$3,750.00
67Water work, misc.:water meter vault adjusted to GR (638E98000)EACH12$1,100.00$1,709.93$3,500.00
68Connection, fused pull apart (625E00450)EACH180$155.00$170.50$155.00
69Connection, unfused permanent (625E00480)EACH270$155.00$170.50$155.00
70Light pole, misc.:pedestrian (625E10500)EACH90$2,600.00$2,860.00$2,600.00
71Light pole foundation, as per plan (625E14501)EACH90$2,200.00$2,420.00$2,200.00
72No. 6 AWG 600 volt distribution cable (625E22990)FT7,022$3.25$3.58$3.25
73No. 10 AWG pole and bracket cable (625E23400)FT1,350$2.90$3.19$2.90
74Conduit, 2", 725.051, as per plan (625E25409)FT7,022$24.00$26.40$24.00
75Luminaire, post top, solid state (LED), as per plan (625E27403)EACH90$1,900.00$2,090.00$1,900.00
76Ground rod (625E32000)EACH90$350.00$385.00$350.00
77Power service, as per plan (625E34001)EACH12$3,800.00$4,180.00$3,800.00
78Lighting, misc.:pull box, 725.08, CPP (625E98000)EACH115$850.00$935.00$850.00
79Wood pole (632E89300)EACH25$1,100.00$1,210.00$1,100.00
80Ground mounted support, no. 2 post (630E02100)FT59.40$16.29$17.92$14.00
81Ground mounted support, no. 3 post (630E03100)FT240$18.54$20.39$16.00
82Ground mounted support, no. 4 post (630E04100)FT84.80$21.54$23.69$18.00
83One way support, no. 3 post (630E08004)FT37.70$18.54$20.39$17.00
84Street name sign support, no. 2 post (630E08510)FT163.50$16.29$17.92$17.00
85Sign post reflector (630E08600)EACH11$65.88$72.47$65.00
86Sign hanger assembly, mast arm, as per plan (630E79101)EACH12$493.78$543.16$475.00
87Sign, flat sheet (630E80100)SF218.30$19.93$21.92$18.00
88Sign, double faced, street name (630E80500)EACH26$162.70$178.97$305.00
89Sign, street name, as per plan (630E80511)EACH12$344.83$379.31$385.00
90Removal of ground mounted sign and disposal (630E84900)EACH16$18.08$19.89$30.00
91Removal of ground mounted post support and disposal (630E86002)EACH9$24.10$26.51$40.00
92Removal of pole mounted sign and disposal (630E87500)EACH94$18.08$19.89$25.00
93Signing, misc.:solar powered rectangular rapid fla (630E97700)EACH4$9,700.00$9,855.28$9,700.00
94Center line (644E00300)MI0.68$12,400$13,640$7,500.00
95Channelizing line, 12" (644E00404)FT130$2.50$2.75$3.00
96Stop line (644E00500)FT497$5.50$6.05$10.00
97Crosswalk line, 12" (644E00620)FT2,567$5.00$5.50$5.00
98Crosswalk line, 24" (644E00630)FT620$5.25$5.78$10.00
99Lane arrow (644E01300)EACH3$150.00$165.00$150.00
100Yield line (644E20800)FT22$7.50$8.25$20.00
101Removal of pavement marking (644E30000)FT604$2.00$2.20$5.00
102Removal of pavement marking (644E30020)EACH4$300.00$330.00$200.00
103Pavement marking, misc.:DO not block intersection (644E50100)EACH1$2,210.00$2,431.00$1,950.00
104Conduit, 2", 725.051 (625E25408)FT156$7.50$8.25$7.50
105Conduit, 3", 725.051 (625E25504)FT454$8.50$9.35$8.50
106Conduit, 4", 725.051 (625E25604)FT115$9.50$10.45$9.50
107Conduit, 6", 725.051 (625E25712)FT74$11.00$12.10$11.00
108Conduit, jacked or drilled, 725.051: 4" (625E25906)FT496$95.00$104.50$95.00
109Trench (625E29000)FT385$15.00$16.50$15.00
110Pull box, misc.:13" X 24" (625E31600)EACH10$850.00$935.00$850.00
111Pull box, misc.:17" X 30" (625E31600)EACH14$950.00$1,045.00$950.00
112Pull box, misc.:24" X 36" (625E31600)EACH4$1,450.00$1,595.00$1,450.00
113Ground rod (625E32000)EACH25$350.00$385.00$350.00
114Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007)EACH26$950.00$1,045.00$950.00
115Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH28$675.00$742.50$675.00
116Accessible pedestrian pushbutton (632E20750)EACH14$1,050.00$1,155.00$1,050.00
117Covering of vehicular signal head, as per plan (632E25001)EACH12$150.00$165.00$150.00
118Covering of pedestrian signal head (632E25010)EACH4$50.00$55.00$50.00
119Signal cable, 2 conductor, no. 14 AWG (632E40200)FT2,151$1.75$1.93$1.75
120Signal cable, 5 conductor, no. 14 AWG (632E40500)FT3,246$3.25$3.58$3.25
121Signal cable, 7 conductor, no. 14 AWG (632E40700)FT2,395$3.75$4.13$3.75
122Interconnect cable, misc.:existing interconnect RE (632E62810)FT276$9.00$9.90$9.00
123Signal support foundation, as per plan (632E64011)EACH12$7,800.00$8,580.00$7,800.00
124Pedestal foundation (632E64020)EACH12$1,350.00$1,485.00$1,350.00
125Test hole performed (632E64950)EACH24$700.00$770.00$700.00
126Power cable, 2 conductor, no. 6 AWG (632E68200)FT36$3.00$3.30$3.00
127Power cable, 3 conductor, no. 6 AWG (632E68300)FT173$4.00$4.40$4.00
128Signal support, type TC-81.22, design 4, as per plan (632E72111)EACH10$15,600$17,160$15,600
129Signal support, type TC-81.22, design 12, as per plan (632E72131)EACH2$19,000$20,900$19,000
130Pedestal, 10.7' tall, transformer base, as per plan (632E89921)EACH12$2,300.00$2,530.00$2,300.00
131Removal of traffic signal installation, as per plan (632E90101)EACH4$4,500.00$4,950.00$4,500.00
132Cabinet foundation (633E67100)EACH3$3,875.00$4,262.50$3,875.00
133Controller work pad (633E67200)EACH3$1,200.00$1,320.00$1,200.00
134Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH3$8,500.00$9,350.00$8,500.00
135Controller item, misc.:controller unit type TS2/A2 (633E99000)EACH3$25,325$27,858$25,325
136Stop line radar detection, as per plan (809E69101)EACH8$9,200.00$10,120$9,200.00
137Curb, misc.:rolled concrete curb (609E98000)FT1,774$61.50$100.97$64.00
138Mulch, as per plan (661E00501)CY40$65.00$71.50$100.00
139Perennials, as per plan: chasmanthium latifolium ' (661E14001)EACH27$37.10$40.81$60.00
140Perennials, as per plan: herero 'little business D (661E14001)EACH464$20.80$22.88$45.00
141Perennials, as per plan: rudbeckia F.V.S. 'goldstr (661E14001)EACH459$20.17$22.19$45.00
142Deciduous tree, 2" caliper, as per plan, carpinus (661E40081)EACH41$561.08$617.19$890.00
143Deciduous tree, 2" caliper, as per plan, cornus X (661E40081)EACH17$597.25$656.98$950.00
144Deciduous tree, 2" caliper, as per plan, nyssa syl (661E40081)EACH41$545.56$600.12$1,000.00
145Deciduous tree, 2" caliper, as per plan, parrotia (661E40081)EACH20$493.86$543.25$1,000.00
146Deciduous tree, 2" caliper, as per plan, quercus X (661E40081)EACH7$493.55$542.91$890.00
147Deciduous tree, 2" caliper, as per plan, tilia cor (661E40081)EACH42$468.00$514.80$890.00
148Planting, misc.: root barrier (661E99900)EACH4,814$8.75$9.63$8.00
149Planting, misc.: tree care (661E99900)EACH28$450.00$2,200.00$2,000.00
150Planting, misc.: tree replacement (661E99900)EACH15$597.25$1,100.00$1,000.00
151Special - trash receptacle (680E14550)EACH45$2,490.00$1,318.24$2,500.00
152Special - bicycle rack (690E50560)EACH12$1,460.00$691.24$2,500.00
153Special - metal banners (690E98000)EACH90$500.00$657.45$1,500.00
154Special - metal bench (690E98000)EACH13$3,510.00$2,241.12$3,200.00
155Special - table and wood bench (690E98000)EACH3$5,755.00$3,619.73$4,500.00
156Special - utility pole wraps/paint (690E98000)EACH56$2,100.00$2,310.00$3,450.00
157Special - wood bench (690E98000)EACH6$3,660.00$2,106.87$2,500.00
158Special - artistic crosswalks (690E98200)SF2,357$58.50$16.50$15.00
159Traffic compacted surface, type A or B (410E12000)CY500$10.00$97.47$85.00
160Temporary asphalt concrete walk (608E21200)SF5,000$1.00$3.97$8.00
161Law enforcement officer with patrol car for assistance (614E11110)HR100$125.00$110.00$80.00
162Asphalt concrete for maintaining traffic (614E13000)CY50$500.00$199.19$600.00
163Portable changeable message sign, as per plan (614E18601)SNMT32$950.00$1,067.21$1,100.00
164Work zone center line, class I, 642 paint (614E21100)MI2$2,280.00$2,508.00$2,200.00
165Work zone center line, class II (614E21400)MI1$1,800.00$1,980.00$2,200.00
166Work zone stop line, class I, 642 paint (614E26200)FT180$24.45$26.90$6.00
167Business entrance sign, as per plan (614E40051)EACH5$218.29$240.12$350.00
168Water (616E10000)MGAL20$1.00$117.32$20.00
169Calcium chloride (616E20000)TON1$150.00$2,041.15$800.00
170Special - work involving non-regulated materials (690E65000)TON15$75.00$178.95$600.00
171Special - work involving petroleum contaminated soil (690E65016)TON150$195.00$145.94$225.00
172Special - work involving non-regulated water (690E65022)GAL15,000$1.00$6.02$10.00
173Special - work involving regulated water (690E65024)GAL5,000$4.50$9.17$40.00
174Premium for contract performance bond and for payment bond (103E05000)LS1$83,375$37,362$48,000
175CPM progress schedule (108E10000)LS1$10,500$14,256$15,000
176Maintaining traffic (614E11000)LS1$198,150$520,000$150,000
177Field office, type B, as per plan (619E16011)MNTH21$2,000.00$1,120.00$3,850.00
178Construction layout stakes and surveying, as per plan (623E10001)LS1$35,000$100,000$296,250
179Mobilization (624E10000)LS1$460,137$200,000$200,000
180Special - as-built construction plans (690E91000)LS1$8,500.00$8,910.00$6,500.00
181Special - preconstruction audio video (690E98400)LS1$1,200.00$1,782.00$2,500.00
ODOT contract 260382: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of August 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy