ODOT contract 260382 bid tabulation
CUY-East 66th Street TLCI (MINOR RECONSTRUCTION). Let by Ohio DOT on August 27, 2026, CUY. 3 bids received; low bid $8,636,872 by Perk Company Inc, +6.5% against the engineer's estimate of $8,110,000.
- Owner
- Ohio DOT
- Letting
- 27 AUG 2026
- Pay items
- 180
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perk Company Inc | $8,636,872 | Low | +6.0% |
| 2 | Anthony Allega Cement Contractor Inc | $9,375,801 | +9.0% | +16% |
| 3 | Fabrizi Trucking & Paving Co Inc | $10,266,313 | +19% | +27% |
Engineer's estimate: $8,110,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perk Company Inc | 2. Anthony Allega Cement Contractor Inc | 3. Fabrizi Trucking & Paving Co Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,500.00 | $11,880 | $15,000 |
| 2 | Pavement removed (202E23000) | SY | 7,729 | $22.60 | $14.00 | $34.00 |
| 3 | Concrete median removed (202E30600) | SY | 52 | $22.60 | $16.33 | $24.00 |
| 4 | Curb removed (202E32000) | FT | 9,360 | $4.00 | $5.51 | $9.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 803 | $104.00 | $69.91 | $20.00 |
| 6 | Guardrail removed (202E38000) | FT | 144 | $9.50 | $9.37 | $20.00 |
| 7 | Manhole removed (202E58000) | EACH | 2 | $1,794.00 | $1,209.85 | $2,500.00 |
| 8 | Catch basin removed, as per plan (202E58101) | EACH | 50 | $803.00 | $1,016.23 | $400.00 |
| 9 | Fence removed (202E75000) | FT | 500 | $4.50 | $5.40 | $20.00 |
| 10 | Meter vault removed, as per plan (202E75601) | EACH | 4 | $2,820.00 | $1,209.84 | $1,850.00 |
| 11 | Valve box removed, as per plan (202E75611) | EACH | 5 | $249.00 | $679.64 | $200.00 |
| 12 | Removal misc.:pole removed (202E98100) | EACH | 33 | $950.00 | $825.00 | $775.00 |
| 13 | Removal misc.:water service stop box (202E98100) | EACH | 83 | $232.65 | $115.49 | $75.00 |
| 14 | Removal misc.:track removed (202E98300) | SY | 250 | $28.50 | $90.39 | $54.00 |
| 15 | Removal misc.:walks and drives removed (202E98400) | SF | 53,436 | $2.25 | $1.93 | $2.20 |
| 16 | Subgrade compaction (204E10000) | SY | 9,459 | $2.00 | $1.34 | $4.00 |
| 17 | Linear grading, as per plan (209E60201) | STA | 46 | $550.00 | $1,327.20 | $850.00 |
| 18 | 4" concrete walk, as per plan (608E10001) | SF | 20,266 | $13.00 | $9.70 | $10.00 |
| 19 | Curb ramp, as per plan (608E52001) | SF | 8,502 | $35.25 | $34.84 | $29.00 |
| 20 | Walkway, misc.:colored concrete bands (608E98000) | SF | 684 | $57.50 | $61.57 | $81.50 |
| 21 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 5 | $1,350.00 | $1,025.03 | $750.00 |
| 22 | Monument, misc.:city of cleveland monument assembl (623E40900) | EACH | 2 | $1,350.00 | $1,546.47 | $950.00 |
| 23 | Topsoil furnished and placed (653E10000) | CY | 750 | $65.00 | $71.50 | $70.00 |
| 24 | Seeding and mulching, class 1 (659E00500) | SY | 6,500 | $2.88 | $3.17 | $2.50 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.90 | $1,250.00 | $1,375.00 | $2,000.00 |
| 26 | Lime (659E31000) | ACRE | 1.40 | $1,750.00 | $1,925.00 | $500.00 |
| 27 | Water (659E35000) | MGAL | 18 | $100.00 | $206.25 | $150.00 |
| 28 | Erosion control (832E30000) | EACH | 100,000 | $1.00 | $1.00 | $1.00 |
| 29 | 4" unclassified pipe underdrains, as per plan (605E05201) | FT | 9,158 | $21.60 | $17.03 | $14.50 |
| 30 | Catch basin, no. 2-2B, as per plan (611E98471) | EACH | 5 | $8,300.00 | $4,640.38 | $11,605 |
| 31 | Catch basin, no. 2-2B, as per plan (611E98471) | EACH | 8 | $7,500.00 | $4,235.95 | $12,250 |
| 32 | Catch basin, misc.:city of cleveland CB-1 (611E98690) | EACH | 53 | $9,500.00 | $7,964.08 | $14,295 |
| 33 | Catch basin, misc.:city of cleveland CB-2 (611E98690) | EACH | 5 | $6,598.00 | $10,872 | $16,395 |
| 34 | Manhole adjusted to grade (611E99654) | EACH | 32 | $1,350.00 | $1,716.26 | $1,250.00 |
| 35 | Special - miscellaneous metal (611E99820) | LB | 5,000 | $3.50 | $2.48 | $2.60 |
| 36 | Drainage structure, misc.:utility test hole (611E99900) | EACH | 10 | $927.00 | $1,144.74 | $1,500.00 |
| 38 | 12" conduit, type B, as per plan (611E04401) | FT | 1,253 | $100.00 | $527.31 | $395.00 |
| 39 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 500 | $62.00 | $88.00 | $81.00 |
| 40 | Pavement planing, asphalt concrete, as per plan (T (254E01001) | SY | 10,488 | $5.75 | $4.57 | $6.75 |
| 41 | Full depth pavement removal and rigid replacement, type 2, class QC1, as per plan (255E12001) | SY | 500 | $213.00 | $266.68 | $168.00 |
| 42 | Aggregate base, as per plan (304E20001) | CY | 1,756 | $88.00 | $95.63 | $78.00 |
| 43 | 9" concrete base, class QC 1P, as per plan (305E13011) | SY | 4,213 | $123.00 | $88.97 | $192.00 |
| 44 | Tack coat (407E10000) | GAL | 2,279 | $4.00 | $3.30 | $4.00 |
| 45 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 622 | $304.00 | $346.50 | $304.00 |
| 46 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 881 | $262.00 | $258.50 | $262.00 |
| 47 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 29 | $700.00 | $297.00 | $700.00 |
| 48 | Reinforced concrete pavement, misc.:decorative con (451E20000) | SY | 526 | $515.00 | $569.12 | $487.00 |
| 49 | Reinforced concrete pavement, misc.:decorative con (451E20000) | SY | 261 | $490.00 | $209.16 | $376.00 |
| 50 | 6" non-reinforced concrete pavement, class QC MS, as per plan (452E10051) | SY | 488 | $120.00 | $222.13 | $109.00 |
| 51 | 8" non-reinforced concrete pavement, class QC MS, as per plan (452E12051) | SY | 424 | $130.00 | $218.61 | $133.00 |
| 52 | Non-reinforced concrete pavement, misc.:surcharge (452E19200) | SY | 500 | $7.00 | $6.16 | $30.00 |
| 53 | Curb, type 6, as per plan (609E26001) | FT | 9,539 | $28.00 | $33.46 | $31.00 |
| 54 | Concrete median (609E71000) | SF | 189 | $20.00 | $56.38 | $11.50 |
| 55 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $4.50 | $2.48 | $5.00 |
| 56 | Fire hydrant removed and disposed of (638E10700) | EACH | 7 | $725.00 | $897.49 | $7,005.00 |
| 57 | Special - valve box adjusted to grade, (cleveland) (638E20500) | EACH | 42 | $1,100.00 | $1,024.82 | $625.00 |
| 58 | Special - shorten water service connection, (cleve (638E20792) | FT | 32 | $704.00 | $419.98 | $300.00 |
| 59 | Special - extend 3/4" copper water service connection (638E20802) | FT | 72 | $627.00 | $237.69 | $300.00 |
| 60 | Special - service box adjusted to grade, (clevelan (638E20902) | EACH | 35 | $250.00 | $571.53 | $375.00 |
| 61 | Special - fire hydrant adjusted to grade, (clevela (638E21400) | EACH | 6 | $2,745.00 | $3,268.48 | $4,510.00 |
| 62 | Water work, misc.:furnishing and setting 6" hydran (638E98000) | EACH | 8 | $13,163 | $14,451 | $15,025 |
| 63 | Water work, misc.:meter and meter vault removed an (638E98000) | EACH | 8 | $5,295.00 | $8,367.26 | $12,500 |
| 64 | Water work, misc.:replacement of owner side lead W (638E98000) | EACH | 3 | $4,955.00 | $6,529.08 | $8,500.00 |
| 65 | Water work, misc.:retap and reconnect water servic (638E98000) | EACH | 16 | $4,487.00 | $5,998.62 | $6,390.00 |
| 66 | Water work, misc.:retap and reconnect water servic (638E98000) | EACH | 9 | $3,070.00 | $5,827.15 | $3,750.00 |
| 67 | Water work, misc.:water meter vault adjusted to GR (638E98000) | EACH | 12 | $1,100.00 | $1,709.93 | $3,500.00 |
| 68 | Connection, fused pull apart (625E00450) | EACH | 180 | $155.00 | $170.50 | $155.00 |
| 69 | Connection, unfused permanent (625E00480) | EACH | 270 | $155.00 | $170.50 | $155.00 |
| 70 | Light pole, misc.:pedestrian (625E10500) | EACH | 90 | $2,600.00 | $2,860.00 | $2,600.00 |
| 71 | Light pole foundation, as per plan (625E14501) | EACH | 90 | $2,200.00 | $2,420.00 | $2,200.00 |
| 72 | No. 6 AWG 600 volt distribution cable (625E22990) | FT | 7,022 | $3.25 | $3.58 | $3.25 |
| 73 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,350 | $2.90 | $3.19 | $2.90 |
| 74 | Conduit, 2", 725.051, as per plan (625E25409) | FT | 7,022 | $24.00 | $26.40 | $24.00 |
| 75 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 90 | $1,900.00 | $2,090.00 | $1,900.00 |
| 76 | Ground rod (625E32000) | EACH | 90 | $350.00 | $385.00 | $350.00 |
| 77 | Power service, as per plan (625E34001) | EACH | 12 | $3,800.00 | $4,180.00 | $3,800.00 |
| 78 | Lighting, misc.:pull box, 725.08, CPP (625E98000) | EACH | 115 | $850.00 | $935.00 | $850.00 |
| 79 | Wood pole (632E89300) | EACH | 25 | $1,100.00 | $1,210.00 | $1,100.00 |
| 80 | Ground mounted support, no. 2 post (630E02100) | FT | 59.40 | $16.29 | $17.92 | $14.00 |
| 81 | Ground mounted support, no. 3 post (630E03100) | FT | 240 | $18.54 | $20.39 | $16.00 |
| 82 | Ground mounted support, no. 4 post (630E04100) | FT | 84.80 | $21.54 | $23.69 | $18.00 |
| 83 | One way support, no. 3 post (630E08004) | FT | 37.70 | $18.54 | $20.39 | $17.00 |
| 84 | Street name sign support, no. 2 post (630E08510) | FT | 163.50 | $16.29 | $17.92 | $17.00 |
| 85 | Sign post reflector (630E08600) | EACH | 11 | $65.88 | $72.47 | $65.00 |
| 86 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 12 | $493.78 | $543.16 | $475.00 |
| 87 | Sign, flat sheet (630E80100) | SF | 218.30 | $19.93 | $21.92 | $18.00 |
| 88 | Sign, double faced, street name (630E80500) | EACH | 26 | $162.70 | $178.97 | $305.00 |
| 89 | Sign, street name, as per plan (630E80511) | EACH | 12 | $344.83 | $379.31 | $385.00 |
| 90 | Removal of ground mounted sign and disposal (630E84900) | EACH | 16 | $18.08 | $19.89 | $30.00 |
| 91 | Removal of ground mounted post support and disposal (630E86002) | EACH | 9 | $24.10 | $26.51 | $40.00 |
| 92 | Removal of pole mounted sign and disposal (630E87500) | EACH | 94 | $18.08 | $19.89 | $25.00 |
| 93 | Signing, misc.:solar powered rectangular rapid fla (630E97700) | EACH | 4 | $9,700.00 | $9,855.28 | $9,700.00 |
| 94 | Center line (644E00300) | MI | 0.68 | $12,400 | $13,640 | $7,500.00 |
| 95 | Channelizing line, 12" (644E00404) | FT | 130 | $2.50 | $2.75 | $3.00 |
| 96 | Stop line (644E00500) | FT | 497 | $5.50 | $6.05 | $10.00 |
| 97 | Crosswalk line, 12" (644E00620) | FT | 2,567 | $5.00 | $5.50 | $5.00 |
| 98 | Crosswalk line, 24" (644E00630) | FT | 620 | $5.25 | $5.78 | $10.00 |
| 99 | Lane arrow (644E01300) | EACH | 3 | $150.00 | $165.00 | $150.00 |
| 100 | Yield line (644E20800) | FT | 22 | $7.50 | $8.25 | $20.00 |
| 101 | Removal of pavement marking (644E30000) | FT | 604 | $2.00 | $2.20 | $5.00 |
| 102 | Removal of pavement marking (644E30020) | EACH | 4 | $300.00 | $330.00 | $200.00 |
| 103 | Pavement marking, misc.:DO not block intersection (644E50100) | EACH | 1 | $2,210.00 | $2,431.00 | $1,950.00 |
| 104 | Conduit, 2", 725.051 (625E25408) | FT | 156 | $7.50 | $8.25 | $7.50 |
| 105 | Conduit, 3", 725.051 (625E25504) | FT | 454 | $8.50 | $9.35 | $8.50 |
| 106 | Conduit, 4", 725.051 (625E25604) | FT | 115 | $9.50 | $10.45 | $9.50 |
| 107 | Conduit, 6", 725.051 (625E25712) | FT | 74 | $11.00 | $12.10 | $11.00 |
| 108 | Conduit, jacked or drilled, 725.051: 4" (625E25906) | FT | 496 | $95.00 | $104.50 | $95.00 |
| 109 | Trench (625E29000) | FT | 385 | $15.00 | $16.50 | $15.00 |
| 110 | Pull box, misc.:13" X 24" (625E31600) | EACH | 10 | $850.00 | $935.00 | $850.00 |
| 111 | Pull box, misc.:17" X 30" (625E31600) | EACH | 14 | $950.00 | $1,045.00 | $950.00 |
| 112 | Pull box, misc.:24" X 36" (625E31600) | EACH | 4 | $1,450.00 | $1,595.00 | $1,450.00 |
| 113 | Ground rod (625E32000) | EACH | 25 | $350.00 | $385.00 | $350.00 |
| 114 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 26 | $950.00 | $1,045.00 | $950.00 |
| 115 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 28 | $675.00 | $742.50 | $675.00 |
| 116 | Accessible pedestrian pushbutton (632E20750) | EACH | 14 | $1,050.00 | $1,155.00 | $1,050.00 |
| 117 | Covering of vehicular signal head, as per plan (632E25001) | EACH | 12 | $150.00 | $165.00 | $150.00 |
| 118 | Covering of pedestrian signal head (632E25010) | EACH | 4 | $50.00 | $55.00 | $50.00 |
| 119 | Signal cable, 2 conductor, no. 14 AWG (632E40200) | FT | 2,151 | $1.75 | $1.93 | $1.75 |
| 120 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 3,246 | $3.25 | $3.58 | $3.25 |
| 121 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,395 | $3.75 | $4.13 | $3.75 |
| 122 | Interconnect cable, misc.:existing interconnect RE (632E62810) | FT | 276 | $9.00 | $9.90 | $9.00 |
| 123 | Signal support foundation, as per plan (632E64011) | EACH | 12 | $7,800.00 | $8,580.00 | $7,800.00 |
| 124 | Pedestal foundation (632E64020) | EACH | 12 | $1,350.00 | $1,485.00 | $1,350.00 |
| 125 | Test hole performed (632E64950) | EACH | 24 | $700.00 | $770.00 | $700.00 |
| 126 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 36 | $3.00 | $3.30 | $3.00 |
| 127 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 173 | $4.00 | $4.40 | $4.00 |
| 128 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 10 | $15,600 | $17,160 | $15,600 |
| 129 | Signal support, type TC-81.22, design 12, as per plan (632E72131) | EACH | 2 | $19,000 | $20,900 | $19,000 |
| 130 | Pedestal, 10.7' tall, transformer base, as per plan (632E89921) | EACH | 12 | $2,300.00 | $2,530.00 | $2,300.00 |
| 131 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 4 | $4,500.00 | $4,950.00 | $4,500.00 |
| 132 | Cabinet foundation (633E67100) | EACH | 3 | $3,875.00 | $4,262.50 | $3,875.00 |
| 133 | Controller work pad (633E67200) | EACH | 3 | $1,200.00 | $1,320.00 | $1,200.00 |
| 134 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 3 | $8,500.00 | $9,350.00 | $8,500.00 |
| 135 | Controller item, misc.:controller unit type TS2/A2 (633E99000) | EACH | 3 | $25,325 | $27,858 | $25,325 |
| 136 | Stop line radar detection, as per plan (809E69101) | EACH | 8 | $9,200.00 | $10,120 | $9,200.00 |
| 137 | Curb, misc.:rolled concrete curb (609E98000) | FT | 1,774 | $61.50 | $100.97 | $64.00 |
| 138 | Mulch, as per plan (661E00501) | CY | 40 | $65.00 | $71.50 | $100.00 |
| 139 | Perennials, as per plan: chasmanthium latifolium ' (661E14001) | EACH | 27 | $37.10 | $40.81 | $60.00 |
| 140 | Perennials, as per plan: herero 'little business D (661E14001) | EACH | 464 | $20.80 | $22.88 | $45.00 |
| 141 | Perennials, as per plan: rudbeckia F.V.S. 'goldstr (661E14001) | EACH | 459 | $20.17 | $22.19 | $45.00 |
| 142 | Deciduous tree, 2" caliper, as per plan, carpinus (661E40081) | EACH | 41 | $561.08 | $617.19 | $890.00 |
| 143 | Deciduous tree, 2" caliper, as per plan, cornus X (661E40081) | EACH | 17 | $597.25 | $656.98 | $950.00 |
| 144 | Deciduous tree, 2" caliper, as per plan, nyssa syl (661E40081) | EACH | 41 | $545.56 | $600.12 | $1,000.00 |
| 145 | Deciduous tree, 2" caliper, as per plan, parrotia (661E40081) | EACH | 20 | $493.86 | $543.25 | $1,000.00 |
| 146 | Deciduous tree, 2" caliper, as per plan, quercus X (661E40081) | EACH | 7 | $493.55 | $542.91 | $890.00 |
| 147 | Deciduous tree, 2" caliper, as per plan, tilia cor (661E40081) | EACH | 42 | $468.00 | $514.80 | $890.00 |
| 148 | Planting, misc.: root barrier (661E99900) | EACH | 4,814 | $8.75 | $9.63 | $8.00 |
| 149 | Planting, misc.: tree care (661E99900) | EACH | 28 | $450.00 | $2,200.00 | $2,000.00 |
| 150 | Planting, misc.: tree replacement (661E99900) | EACH | 15 | $597.25 | $1,100.00 | $1,000.00 |
| 151 | Special - trash receptacle (680E14550) | EACH | 45 | $2,490.00 | $1,318.24 | $2,500.00 |
| 152 | Special - bicycle rack (690E50560) | EACH | 12 | $1,460.00 | $691.24 | $2,500.00 |
| 153 | Special - metal banners (690E98000) | EACH | 90 | $500.00 | $657.45 | $1,500.00 |
| 154 | Special - metal bench (690E98000) | EACH | 13 | $3,510.00 | $2,241.12 | $3,200.00 |
| 155 | Special - table and wood bench (690E98000) | EACH | 3 | $5,755.00 | $3,619.73 | $4,500.00 |
| 156 | Special - utility pole wraps/paint (690E98000) | EACH | 56 | $2,100.00 | $2,310.00 | $3,450.00 |
| 157 | Special - wood bench (690E98000) | EACH | 6 | $3,660.00 | $2,106.87 | $2,500.00 |
| 158 | Special - artistic crosswalks (690E98200) | SF | 2,357 | $58.50 | $16.50 | $15.00 |
| 159 | Traffic compacted surface, type A or B (410E12000) | CY | 500 | $10.00 | $97.47 | $85.00 |
| 160 | Temporary asphalt concrete walk (608E21200) | SF | 5,000 | $1.00 | $3.97 | $8.00 |
| 161 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $125.00 | $110.00 | $80.00 |
| 162 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $500.00 | $199.19 | $600.00 |
| 163 | Portable changeable message sign, as per plan (614E18601) | SNMT | 32 | $950.00 | $1,067.21 | $1,100.00 |
| 164 | Work zone center line, class I, 642 paint (614E21100) | MI | 2 | $2,280.00 | $2,508.00 | $2,200.00 |
| 165 | Work zone center line, class II (614E21400) | MI | 1 | $1,800.00 | $1,980.00 | $2,200.00 |
| 166 | Work zone stop line, class I, 642 paint (614E26200) | FT | 180 | $24.45 | $26.90 | $6.00 |
| 167 | Business entrance sign, as per plan (614E40051) | EACH | 5 | $218.29 | $240.12 | $350.00 |
| 168 | Water (616E10000) | MGAL | 20 | $1.00 | $117.32 | $20.00 |
| 169 | Calcium chloride (616E20000) | TON | 1 | $150.00 | $2,041.15 | $800.00 |
| 170 | Special - work involving non-regulated materials (690E65000) | TON | 15 | $75.00 | $178.95 | $600.00 |
| 171 | Special - work involving petroleum contaminated soil (690E65016) | TON | 150 | $195.00 | $145.94 | $225.00 |
| 172 | Special - work involving non-regulated water (690E65022) | GAL | 15,000 | $1.00 | $6.02 | $10.00 |
| 173 | Special - work involving regulated water (690E65024) | GAL | 5,000 | $4.50 | $9.17 | $40.00 |
| 174 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $83,375 | $37,362 | $48,000 |
| 175 | CPM progress schedule (108E10000) | LS | 1 | $10,500 | $14,256 | $15,000 |
| 176 | Maintaining traffic (614E11000) | LS | 1 | $198,150 | $520,000 | $150,000 |
| 177 | Field office, type B, as per plan (619E16011) | MNTH | 21 | $2,000.00 | $1,120.00 | $3,850.00 |
| 178 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $35,000 | $100,000 | $296,250 |
| 179 | Mobilization (624E10000) | LS | 1 | $460,137 | $200,000 | $200,000 |
| 180 | Special - as-built construction plans (690E91000) | LS | 1 | $8,500.00 | $8,910.00 | $6,500.00 |
| 181 | Special - preconstruction audio video (690E98400) | LS | 1 | $1,200.00 | $1,782.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.