Anthony Allega Cement Contractor Inc: ODOT bid record

Anthony Allega Cement Contractor Inc submitted 18 bids on Ohio DOT contracts in the data, from 31 MAR 2022 to 29 OCT 2026, and was the low bidder on 3 of them (17%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$8,716,639
Latest bid
29 OCT 2026
Data through
12 NOV 2026
18Bids
3Low bids
17Win rate, percent
+9.0%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2022400%
20235120%
2024100%
20252150%
20266117%
Anthony Allega Cement Contractor Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY10220%
LAK300%
ATB200%
SUM2150%
MED100%
Anthony Allega Cement Contractor Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1717 (100%)$1.00$1.00
Subgrade compaction204E10000SY1711 (65%)$1.06$3.00
Excavation203E10000CY178 (47%)$23.80$27.00
Aggregate base304E20000CY158 (53%)$77.64$90.00
Embankment203E20000CY167 (44%)$13.21$25.00
Semi-integral abutment expansion joint seal516E14020FT107 (70%)$18.90$38.45
Law enforcement officer with patrol car for assistance614E11110HR185 (28%)$81.20$80.00
Pavement removed202E23000SY144 (29%)$15.45$17.00
Excavation of subgrade204E13000CY104 (40%)$25.78$27.00
Welded stud shear connectors513E20000EACH94 (44%)$6.30$4.87
Restrike, as per plan523E20501EACH64 (67%)$1,260.00$3,200.00
Pavement removed, as per plan202E23001SY54 (80%)$18.17$20.00
Anthony Allega Cement Contractor Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Anthony Allega Cement Contractor Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026260477ATBATB-IR 90 Vacant Rest Areas TP (PARKING AREAS)3 of 3$9,514,041+4.0%
15 OCT 2026260426LAKLAK-US 20-00.04 Wickliffe (TWO LANE RESURFACING)5 of 5$7,834,442+15%
01 OCT 2026260429MEDMED-SR 3-20.63 (INTERSECTION)6 of 6$2,381,803+29%
27 AUG 2026260382CUYCUY-East 66th Street TLCI (MINOR RECONSTRUCTION)2 of 3$9,375,801+9.0%
17 APR 2026268004SUMSUM-IR 77-Vacant Rest Area TP1 of 3$3,288,842Low, 3.0% under the second
15 JAN 2026260010CUYCUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION)2 of 9$1,991,437+6.0%
13 FEB 2025250084CUYCUY-IR 90-19.77/VAR Ramps (MINOR RECONSTRUCTION)1 of 6$2,587,098Low, 7.0% under the second
30 JAN 2025250002LAKLAK-US 20-19.59 Major Rehab (MAJOR RECONSTRUCTION)2 of 2$61,698,024+9.0%
22 FEB 2024240131CUYCUY-SR 237-03.75 (FOUR LANE RESURFACING)2 of 6$1,326,860+8.0%
09 NOV 2023230543LAKLAK-IR 90-05.57 Slide (SLIDE REPAIR)7 of 7$1,885,086+73%
31 AUG 2023230437SUMSUM-IR 77-28.75 (MAJOR RECONSTRUCTION)4 of 5$62,879,923+15%
08 JUN 2023230346ATBATB-SR 307-03.21 (INTERSECTION)4 of 5$3,055,405+12%
30 MAR 2023230179CUYCUY-SR 17-12.16 Major Rehab (MINOR RECONSTRUCTION)1 of 4$2,840,698Low, 20% under the second
26 JAN 2023230046CUYCUY-SR 17-07.09 (MAJOR RECONSTRUCTION)2 of 5$11,896,966+3.0%
13 OCT 2022220512CUYCUY-IR 77-00.42 Interchange (PART 1 AND PART 2) (MAJOR RECONSTRUCTION)2 of 7$33,910,769+7.0%
29 SEP 2022220533CUYCUY-US 422-18.74/VAR Slide (SLIDE REPAIR)10 of 11$1,443,705+71%
14 APR 2022220233CUYCUY-IR 77-08.37 NB Ramps Safety (INTERCHANGE)2 of 3$4,302,945+4.0%
31 MAR 2022220203CUYCUY-East 185th Streetscape (PART 1 & PART 2) (MAJOR RECONSTRUCTION)2 of 2$13,211,708+10%
Anthony Allega Cement Contractor Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy