ODOT contract 250002 bid tabulation
LAK-US 20-19.59 Major Rehab (MAJOR RECONSTRUCTION). Let by Ohio DOT on January 30, 2025, LAK. 2 bids received; low bid $56,609,456 by Great Lakes Construction Co, +20% against the engineer's estimate of $47,000,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 303
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Construction Co | $56,609,456 | Low | +20% |
| 2 | Anthony Allega Cement Contractor Inc | $61,698,024 | +9.0% | +31% |
Engineer's estimate: $47,000,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Construction Co | 2. Anthony Allega Cement Contractor Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $200,000 | $194,842 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $325.00 | $1,833.89 |
| 3 | Pavement removed, as per plan (202E23001) | SY | 145,222 | $17.50 | $12.37 |
| 4 | Walk removed (202E30000) | SF | 55,804 | $2.25 | $1.38 |
| 5 | Concrete median removed (202E30600) | SY | 589 | $23.00 | $17.37 |
| 6 | Curb removed (202E32000) | FT | 1,993 | $3.25 | $8.24 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 20,871 | $37.50 | $74.10 |
| 8 | Pipe removed, over 24" diameter (202E35200) | FT | 2,090 | $40.00 | $130.76 |
| 9 | Guardrail removed (202E38000) | FT | 5,001 | $2.00 | $2.20 |
| 10 | Special - parking block removed (202E52990) | EACH | 8 | $175.00 | $234.97 |
| 11 | Mailbox removed (202E53100) | EACH | 130 | $175.00 | $185.76 |
| 12 | Manhole removed (202E58000) | EACH | 5 | $2,850.00 | $2,605.06 |
| 13 | Catch basin or inlet removed (202E58300) | EACH | 148 | $700.00 | $1,230.94 |
| 14 | Monument assembly removed (202E60010) | EACH | 10 | $175.00 | $234.62 |
| 15 | Special - fill and plug existing conduit (202E70000) | FT | 100 | $109.00 | $186.62 |
| 16 | Special - fill and plug existing conduit (202E70000) | FT | 945 | $30.00 | $104.44 |
| 17 | Special - pipe cleanout, 24" and under (202E70110) | FT | 4,400 | $8.50 | $33.00 |
| 18 | Special - pipe cleanout, 27" to 48" (202E70120) | FT | 275 | $19.00 | $55.00 |
| 19 | Fence removed (202E75000) | FT | 989 | $5.00 | $5.50 |
| 20 | Removal misc.: weather station foundation (202E98000) | LS | 1 | $1,400.00 | $2,739.50 |
| 21 | Removal misc.: bollard (202E98100) | EACH | 9 | $175.00 | $417.72 |
| 22 | Removal misc.: boulder (202E98100) | EACH | 24 | $155.00 | $156.65 |
| 23 | Removal misc.: building foundation (202E98100) | EACH | 1 | $2,250.00 | $2,739.50 |
| 24 | Removal misc.: business sign (202E98100) | EACH | 50 | $500.00 | $581.89 |
| 25 | Removal misc.: concrete block (202E98100) | EACH | 24 | $115.00 | $156.65 |
| 26 | Removal misc.: landscape light (202E98100) | EACH | 14 | $175.00 | $819.50 |
| 27 | Removal misc.: light pole (202E98100) | EACH | 2 | $850.00 | $396.00 |
| 28 | Removal misc.: post (202E98100) | EACH | 77 | $115.00 | $390.60 |
| 29 | Removal misc.: concrete wall (202E98200) | FT | 112 | $20.00 | $50.37 |
| 30 | Removal misc.: stone wall (202E98200) | FT | 181 | $20.00 | $31.17 |
| 31 | Excavation (203E10000) | CY | 34,119 | $40.00 | $25.93 |
| 32 | Embankment (203E20000) | CY | 15,425 | $10.00 | $4.62 |
| 33 | Subgrade compaction (204E10000) | SY | 180,871 | $1.00 | $0.38 |
| 34 | Excavation of subgrade (204E13000) | CY | 10,050 | $35.00 | $25.83 |
| 35 | Granular material, type B (204E30010) | CY | 10,050 | $90.00 | $76.13 |
| 36 | Proof rolling (204E45000) | HR | 60 | $150.00 | $354.30 |
| 37 | Geotextile fabric (204E50000) | SY | 29,300 | $1.50 | $2.00 |
| 38 | Geogrid (204E51000) | SY | 18,100 | $1.50 | $2.07 |
| 39 | Guardrail, type MGS (606E15050) | FT | 5,088 | $18.00 | $19.80 |
| 40 | Guardrail rebuilt (606E16000) | FT | 25 | $8.25 | $9.08 |
| 41 | Guardrail, type MGS, long-span (606E17360) | FT | 50 | $26.00 | $28.60 |
| 42 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 17 | $2,225.00 | $2,447.50 |
| 43 | Anchor assembly, MGS type T (606E26550) | EACH | 12 | $950.00 | $1,045.00 |
| 44 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,300.00 | $2,530.00 |
| 45 | 4" concrete walk (608E10000) | SF | 49,452 | $8.50 | $5.95 |
| 46 | Curb ramp (608E52000) | SF | 2,022 | $18.00 | $23.81 |
| 47 | Monument assembly, type C (623E38500) | EACH | 34 | $1,300.00 | $1,409.90 |
| 48 | Monument assembly adjusted to grade (623E39500) | EACH | 3 | $240.00 | $1,224.10 |
| 49 | Special - mailbox support system, single (690E50100) | EACH | 128 | $200.00 | $453.42 |
| 50 | Special - work involving petroleum contaminated soil (690E65016) | TON | 8,200 | $32.00 | $56.00 |
| 51 | Special - work involving non-regulated water (690E65022) | GAL | 4,100 | $8.50 | $9.00 |
| 52 | Special - work involving regulated water (690E65024) | GAL | 4,100 | $7.00 | $10.00 |
| 53 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 9 | $100.00 | $228.91 |
| 54 | Rock channel protection, type A with geotextile fabric (601E32004) | CY | 26 | $115.00 | $554.42 |
| 55 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 13 | $178.00 | $808.71 |
| 56 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 3 | $170.00 | $644.77 |
| 57 | Soil analysis test (659E00100) | EACH | 2 | $250.00 | $385.00 |
| 58 | Topsoil (659E00300) | CY | 13,524 | $44.00 | $30.80 |
| 59 | Seeding and mulching, class 1 (659E00500) | SY | 121,832 | $0.90 | $0.99 |
| 60 | Repair seeding and mulching (659E14000) | SY | 6,092 | $1.00 | $1.10 |
| 61 | Inter-seeding (659E15000) | SY | 6,092 | $1.00 | $1.10 |
| 62 | Commercial fertilizer (659E20000) | TON | 16.99 | $1,350.00 | $1,485.00 |
| 63 | Lime (659E31000) | ACRE | 25.17 | $0.25 | $110.00 |
| 64 | Water (659E35000) | MGAL | 691 | $0.25 | $27.50 |
| 65 | Storm water pollution prevention plan (832E15000) | LS | 1 | $10,000 | $8,222.50 |
| 66 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $65,000 | $60,720 |
| 67 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $40,000 | $32,727 |
| 68 | Erosion control (832E30000) | EACH | 690,000 | $1.00 | $1.00 |
| 69 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $155,000 | $341,000 |
| 70 | Special - structures misc.: preconstruction condit (530E00200) | LS | 1 | $10,000 | $9,443.50 |
| 71 | Special - structural survey and monitoring of vibration (530E14000) | LS | 1 | $25,000 | $3,960.00 |
| 72 | Concrete masonry (602E20000) | CY | 7.60 | $2,200.00 | $2,775.90 |
| 73 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 660 | $14.00 | $20.85 |
| 74 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 53,273 | $16.50 | $13.11 |
| 75 | Aggregate drains (605E31100) | FT | 200 | $10.00 | $13.86 |
| 76 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 2,981 | $22.00 | $16.48 |
| 77 | 6" conduit, type F (611E01500) | FT | 50 | $15.00 | $21.51 |
| 78 | 8" conduit, type B (611E01800) | FT | 24 | $50.00 | $83.15 |
| 79 | 12" conduit, type B, as per plan (611E04401) | FT | 1,596 | $185.00 | $278.46 |
| 80 | 12" conduit, type C (611E04600) | FT | 500 | $93.00 | $126.96 |
| 81 | 15" conduit, type B (611E05900) | FT | 4,748 | $160.00 | $276.51 |
| 82 | 15" conduit, type C (611E06100) | FT | 1,331 | $130.00 | $250.95 |
| 83 | 18" conduit, type B (611E07400) | FT | 1,619 | $250.00 | $302.64 |
| 84 | 18" conduit, type C (611E07600) | FT | 3,355 | $125.00 | $272.70 |
| 85 | 21" conduit, type B (611E08900) | FT | 483 | $260.00 | $380.09 |
| 86 | 21" conduit, type C (611E09100) | FT | 1,634 | $235.00 | $365.91 |
| 87 | 24" conduit, type B (611E10400) | FT | 3,318 | $315.00 | $419.16 |
| 88 | 24" conduit, type C (611E10600) | FT | 880 | $285.00 | $336.55 |
| 89 | 30" conduit, type B (611E13400) | FT | 415 | $440.00 | $480.71 |
| 90 | 30" conduit, type C (611E13600) | FT | 353 | $390.00 | $362.04 |
| 91 | 36" conduit, type B (611E16400) | FT | 800 | $535.00 | $666.15 |
| 92 | 42" conduit, type B (611E19400) | FT | 1,095 | $565.00 | $715.04 |
| 93 | 42" conduit, type C (611E19600) | FT | 1,385 | $525.00 | $690.80 |
| 94 | 48" conduit, type B (611E20900) | FT | 3,816 | $580.00 | $859.55 |
| 95 | 48" conduit, type C (611E21100) | FT | 1,474 | $585.00 | $773.29 |
| 96 | 54" conduit, type A (611E22200) | FT | 48 | $1,100.00 | $859.79 |
| 97 | 66" conduit, type A,706.02, 707.35,707.75,707.85, (611E25000) | FT | 130 | $1,250.00 | $3,757.40 |
| 98 | Conduit, misc.: existing utility location test hol (611E97200) | EACH | 50 | $675.00 | $4,432.14 |
| 100 | Conduit, misc.: type B for drainage discharge cont (611E97400) | FT | 500 | $22.00 | $118.66 |
| 101 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 500 | $19.00 | $107.84 |
| 102 | Catch basin, no. 3 (611E98150) | EACH | 98 | $7,000.00 | $7,979.41 |
| 103 | Catch basin, no. 3A (611E98180) | EACH | 119 | $6,000.00 | $5,788.09 |
| 104 | Catch basin, no. 6 (611E98370) | EACH | 6 | $6,500.00 | $7,212.20 |
| 105 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $5,250.00 | $4,101.55 |
| 106 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 45 | $750.00 | $1,313.44 |
| 107 | Catch basin reconstructed to grade (611E98634) | EACH | 5 | $1,200.00 | $2,055.55 |
| 108 | Inlet, side ditch (611E98700) | EACH | 5 | $1,200.00 | $2,590.08 |
| 109 | Inlet, no. 2-6 (611E98710) | EACH | 2 | $7,000.00 | $12,906 |
| 110 | Manhole, no. 3 (611E99574) | EACH | 134 | $14,750 | $13,323 |
| 111 | Manhole, no. 3 with 108" base I.D. and 12" weir (611E99586) | EACH | 6 | $40,000 | $31,610 |
| 112 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 17 | $800.00 | $1,127.06 |
| 113 | Manhole reconstructed to grade (611E99660) | EACH | 5 | $2,250.00 | $2,055.55 |
| 114 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $650.00 | $925.08 |
| 115 | Inspection well (611E99720) | EACH | 10 | $650.00 | $1,873.98 |
| 116 | Special - miscellaneous metal (611E99820) | LB | 10,000 | $2.25 | $2.04 |
| 117 | Manufactured water quality structure, type 4 (895E10040) | EACH | 6 | $117,500 | $47,863 |
| 118 | Partial depth pavement repair (441) (251E01000) | SY | 1,400 | $80.00 | $88.00 |
| 119 | Pavement planing, asphalt concrete (T=3.25") (254E01000) | SY | 28,075 | $4.00 | $4.40 |
| 120 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,014 | $300.00 | $440.00 |
| 121 | Asphalt concrete base, (449), as per plan, PG64-22 (301E56001) | CY | 23,164 | $185.00 | $203.50 |
| 122 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 456 | $465.00 | $511.50 |
| 123 | Aggregate base (304E20000) | CY | 28,594 | $110.00 | $85.24 |
| 124 | Non-tracking tack coat (407E20000) | GAL | 20,650 | $4.00 | $4.40 |
| 125 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 273 | $330.00 | $363.00 |
| 126 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 330 | $295.00 | $324.50 |
| 127 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 118 | $900.00 | $990.00 |
| 128 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 271 | $360.00 | $396.00 |
| 129 | Anti-segregation equipment (442E00100) | CY | 13,224 | $4.00 | $4.40 |
| 130 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 6,814 | $260.00 | $286.00 |
| 131 | Asphalt concrete intermediate course, 19 MM, type A (446), as per plan (442E10101) | CY | 7,977 | $215.00 | $236.50 |
| 132 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 2,220 | $95.00 | $97.55 |
| 133 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 3,915 | $110.00 | $106.48 |
| 134 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 475 | $105.00 | $101.53 |
| 135 | Combination curb and gutter, type 2 (609E12000) | FT | 44,398 | $42.00 | $28.57 |
| 136 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 4,372 | $70.00 | $52.39 |
| 137 | Curb, type 3-A (609E20000) | FT | 199 | $16.00 | $10.35 |
| 138 | Curb, type 6 (609E26000) | FT | 2,006 | $52.00 | $46.37 |
| 139 | Concrete median (609E72000) | SY | 423 | $82.50 | $107.20 |
| 140 | Compacted aggregate (617E10100) | CY | 104 | $165.00 | $124.21 |
| 141 | Longitudinal joint preparation, as per plan (874E20001) | FT | 30,313 | $2.75 | $3.03 |
| 142 | Meter and chamber removed and reset, as per plan (638E11101) | EACH | 10 | $800.00 | $6,553.08 |
| 143 | Special - 4" water main dip class 53 mechanical joints and fittings (638E20008) | FT | 50 | $325.00 | $229.36 |
| 144 | Special - 6" water main dip class 53 mechanical joints and fittings (638E20048) | FT | 50 | $330.00 | $216.92 |
| 145 | Special - 8" water main dip class 53 mechanical joints and fittings (638E20088) | FT | 50 | $335.00 | $236.49 |
| 146 | Special - valve box adjusted to grade, lcdu standa (638E20500) | EACH | 28 | $225.00 | $858.79 |
| 147 | Special - 6" fire hydrant, lcdu standard (638E20750) | EACH | 42 | $13,000 | $11,806 |
| 148 | Special - fire hydrant removed for storage, lcdu S (638E20752) | EACH | 42 | $1,500.00 | $780.35 |
| 149 | Special - 1" copper water service line, lcdu stand (638E20770) | FT | 3,500 | $12.00 | $125.36 |
| 150 | Special - 1 1/2" copper water service line, lcdu S (638E20774) | FT | 100 | $18.00 | $158.69 |
| 151 | Special - 2" copper water service line, lcdu stand (638E20778) | FT | 100 | $22.00 | $176.98 |
| 152 | Special - service box adjusted to grade, lcdu stan (638E20902) | EACH | 20 | $225.00 | $459.78 |
| 153 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 3 | $1,000.00 | $1,432.24 |
| 154 | Delineator, post ground mounted (620E00500) | EACH | 17 | $75.00 | $92.58 |
| 155 | RPM (621E00100) | EACH | 1,427 | $37.25 | $40.98 |
| 156 | Raised pavement marker removed (621E54000) | EACH | 1,225 | $13.00 | $29.70 |
| 157 | Ground rod (625E32000) | EACH | 5 | $295.00 | $357.50 |
| 158 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 83 | $12.00 | $12.10 |
| 159 | Ground mounted support, no. 2 post (630E02100) | FT | 255 | $13.00 | $14.30 |
| 160 | Ground mounted support, no. 3 post (630E03100) | FT | 2,630 | $15.00 | $16.50 |
| 161 | Sign post reflector (630E08600) | EACH | 54 | $45.00 | $49.50 |
| 162 | Overhead sign support, type TC-12.31, design 6 (630E72320) | EACH | 1 | $26,850 | $29,535 |
| 163 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 2 | $88,450 | $97,295 |
| 164 | Sign support assembly, pole mounted (630E79500) | EACH | 11 | $185.00 | $203.50 |
| 165 | Sign, flat sheet (630E80100) | SF | 1,326 | $17.00 | $18.70 |
| 166 | Sign, double faced, street name (630E80500) | EACH | 6 | $225.00 | $247.50 |
| 167 | Rigid overhead sign support foundation (630E84510) | EACH | 5 | $9,750.00 | $10,725 |
| 168 | Removal of ground mounted sign and disposal (630E84900) | EACH | 139 | $15.00 | $16.50 |
| 169 | Removal of ground mounted sign and reerection (630E85100) | EACH | 22 | $65.00 | $71.50 |
| 170 | Removal of ground mounted sign and reerection, as per plan (630E85101) | EACH | 1 | $370.00 | $407.00 |
| 171 | Removal of ground mounted post support and disposal (630E86002) | EACH | 134 | $20.00 | $22.00 |
| 172 | Removal of overhead mounted sign and reerection (630E87100) | EACH | 5 | $765.00 | $841.50 |
| 173 | Removal of pole mounted sign and disposal (630E87500) | EACH | 41 | $35.00 | $38.50 |
| 174 | Removal of pole mounted sign and reerection (630E87520) | EACH | 8 | $95.00 | $104.50 |
| 175 | Removal of overhead sign support and disposal (630E89702) | EACH | 3 | $2,650.00 | $2,915.00 |
| 176 | Edge line, 6" (646E10010) | MI | 2.53 | $5,900.00 | $4,620.00 |
| 177 | Lane line, 6" (646E10110) | MI | 10.63 | $2,155.00 | $3,080.00 |
| 178 | Center line (646E10200) | MI | 6.39 | $7,810.00 | $7,480.00 |
| 179 | Channelizing line, 12" (646E10310) | FT | 4,463 | $2.00 | $3.03 |
| 180 | Stop line (646E10400) | FT | 572 | $13.50 | $13.20 |
| 181 | Crosswalk line, 12" (646E10510) | FT | 2,034 | $8.75 | $6.60 |
| 182 | Transverse/diagonal line (646E10600) | FT | 571 | $13.00 | $11.00 |
| 183 | Chevron marking (646E10620) | FT | 225 | $13.00 | $12.10 |
| 184 | Island marking (646E10800) | SF | 37 | $8.75 | $5.50 |
| 185 | Lane arrow (646E20300) | EACH | 60 | $225.00 | $203.50 |
| 186 | Dotted line, 6" (646E20504) | FT | 800 | $1.95 | $5.50 |
| 187 | Conduit, 2", 725.04 (625E25400) | FT | 73 | $26.55 | $29.21 |
| 188 | Trench (625E29000) | FT | 73 | $12.25 | $13.48 |
| 189 | Pull box removed (625E31510) | EACH | 17 | $250.00 | $275.00 |
| 190 | Ground rod (625E32000) | EACH | 4 | $295.00 | $324.50 |
| 191 | Sign, flat sheet (630E80100) | SF | 10.40 | $20.00 | $26.95 |
| 192 | Removal of pole mounted sign and disposal (630E87500) | EACH | 11 | $35.00 | $137.50 |
| 193 | Accessible pedestrian pushbutton (632E20750) | EACH | 4 | $805.00 | $885.50 |
| 194 | Pedestal foundation (632E64020) | EACH | 4 | $1,150.00 | $1,265.00 |
| 195 | Loop detector lead-in cable (632E65200) | FT | 746 | $2.15 | $2.37 |
| 196 | Pedestal, 8', transformer base (632E89900) | EACH | 4 | $1,100.00 | $1,210.00 |
| 197 | Removal of miscellaneous traffic signal item (pede (632E90020) | EACH | 4 | $480.00 | $528.00 |
| 198 | Signalization, misc.: unlash and relash messenger (632E90500) | FT | 319 | $6.80 | $7.48 |
| 199 | Advance radar detection, as per plan (809E69001) | EACH | 12 | $8,292.50 | $9,121.75 |
| 200 | Stop line radar detection, as per plan (809E69101) | EACH | 31 | $8,607.50 | $9,468.25 |
| 201 | Guardrail, type MGS, as per plan (606E15051) | FT | 2,214 | $21.00 | $23.10 |
| 202 | Anchor assembly, MGS type E, as per plan (MASH 201 (606E26151) | EACH | 5 | $2,300.00 | $2,530.00 |
| 203 | Anchor assembly, MGS type T, as per plan (606E26551) | EACH | 9 | $1,100.00 | $1,210.00 |
| 204 | Temporary asphalt concrete walk, as per plan (608E21201) | SF | 2,000 | $6.00 | $5.50 |
| 205 | 12" conduit, type B, as per plan (611E04401) | FT | 1,532 | $180.00 | $262.05 |
| 206 | 15" conduit, type B, as per plan (611E05901) | FT | 39 | $130.00 | $399.11 |
| 207 | 24" conduit, type B, as per plan (611E10401) | FT | 34 | $330.00 | $472.72 |
| 208 | Catch basin, no. 6, as per plan (611E98371) | EACH | 71 | $5,500.00 | $6,565.47 |
| 209 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 69 | $1,500.00 | $2,055.55 |
| 210 | Inlet reconstructed to grade, as per plan (611E99155) | EACH | 2 | $1,500.00 | $2,055.55 |
| 211 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,200 | $100.00 | $77.00 |
| 212 | Special - work zone traffic signal (614E11300) | EACH | 24 | $1,500.00 | $1,650.00 |
| 213 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 325 | $1,715.00 | $1,860.73 |
| 214 | Detour signing (614E12420) | LS | 1 | $12,500 | $27,831 |
| 215 | Barrier reflector, type 1 (bidirectional) (614E13310) | EACH | 484 | $7.85 | $13.53 |
| 216 | Object marker, two way (614E13360) | EACH | 484 | $12.65 | $19.91 |
| 217 | Portable changeable message sign, as per plan (614E18601) | SNMT | 180 | $700.00 | $999.60 |
| 218 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 12.85 | $470.00 | $517.00 |
| 219 | Work zone lane line, class I, 6", 873 (614E20356) | MI | 0.13 | $11,500 | $4,794.15 |
| 220 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 21.26 | $465.00 | $511.50 |
| 221 | Work zone center line, class I, 642 paint (614E21100) | MI | 18.02 | $1,670.00 | $1,837.00 |
| 222 | Work zone center line, class I, 873 (614E21350) | MI | 5.56 | $15,100 | $19,333 |
| 223 | Work zone center line, class III, 642 paint (614E21550) | MI | 12.78 | $1,665.00 | $1,831.50 |
| 224 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 25.78 | $1,300.00 | $1,430.00 |
| 225 | Work zone edge line, class I, 6", 873 (614E22326) | MI | 6.83 | $11,100 | $12,731 |
| 226 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 5.06 | $1,295.00 | $1,424.50 |
| 227 | Work zone channelizing line, class I, 12", 873 (614E23130) | FT | 1,364 | $5.75 | $5.36 |
| 228 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 9,894 | $1.05 | $1.16 |
| 229 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 8,926 | $1.00 | $1.10 |
| 230 | Work zone dotted line, class I, 6", 873 (614E24122) | FT | 2,475 | $2.05 | $2.06 |
| 231 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 8,600 | $1.00 | $1.10 |
| 232 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 1,600 | $0.95 | $1.05 |
| 233 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 2,428 | $3.75 | $4.13 |
| 234 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 1,142 | $3.70 | $4.07 |
| 235 | Work zone stop line, class I, 642 paint (614E26200) | FT | 1,810 | $4.00 | $4.40 |
| 236 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 55 | $10.31 | $11.34 |
| 237 | Work zone stop line, class III, 642 paint (614E26610) | FT | 1,144 | $3.95 | $4.35 |
| 238 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 4,985 | $3.50 | $3.85 |
| 239 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 4,068 | $3.45 | $3.80 |
| 240 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 169 | $85.00 | $93.50 |
| 241 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 120 | $80.00 | $88.00 |
| 242 | Work zone island marking, class III, 642 paint (614E32800) | SF | 74 | $3.45 | $3.80 |
| 243 | Business entrance sign, as per plan (614E40051) | EACH | 120 | $65.00 | $240.57 |
| 244 | Roads for maintaining traffic (615E10000) | LS | 1 | $1,375,000 | $1,633,448 |
| 245 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 41,970 | $80.00 | $59.12 |
| 246 | Water (616E10000) | MGAL | 1,100 | $70.00 | $74.72 |
| 247 | Portable barrier, unanchored (622E41100) | FT | 44,463 | $16.00 | $7.55 |
| 248 | Pull box removed and replaced, as per plan (625E31507) | EACH | 10 | $1,300.00 | $1,430.00 |
| 249 | Chevron marking, type 1 (642E00720) | FT | 450 | $3.75 | $4.13 |
| 250 | Special - reimbursement for MOT items permanently (690E98000) | EACH | 250,000 | $1.00 | $1.10 |
| 251 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $20,000 | $38,240 |
| 252 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $65,000 | $61,600 |
| 253 | Unclassified excavation (503E21300) | LS | 1 | $18,000 | $43,653 |
| 254 | Epoxy coated steel reinforcement (509E10000) | LB | 2,705 | $2.25 | $3.34 |
| 255 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 48 | $50.00 | $43.28 |
| 256 | Class QC1 concrete, retaining/wingwall not including footing (511E46000) | SY | 25 | $1,250.00 | $1,390.11 |
| 257 | Class QC1 concrete, footing (511E46510) | CY | 21 | $950.00 | $1,212.49 |
| 258 | Class QC1 concrete, headwall (511E46610) | CY | 0.50 | $8,500.00 | $7,346.88 |
| 259 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 31 | $100.00 | $44.00 |
| 260 | Type 2 waterproofing (512E33000) | SY | 28 | $40.00 | $75.26 |
| 261 | 1" preformed expansion joint filler (516E13600) | SF | 16 | $20.00 | $60.65 |
| 262 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $2,000.00 | $5,881.34 |
| 263 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 9 | $200.00 | $687.77 |
| 264 | Concrete masonry (602E20000) | CY | 7 | $2,050.00 | $4,245.59 |
| 265 | 8' X 6' conduit, type A, 706.05 (611E94910) | FT | 12 | $2,000.00 | $1,689.96 |
| 266 | Low strength mortar backfill (type 2) (613E41300) | CY | 3 | $500.00 | $605.59 |
| 267 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 227 | $35.00 | $44.00 |
| 268 | Prefabricated modular retaining wall, as per plan (870E10001) | SF | 1,928 | $100.00 | $74.79 |
| 269 | Wall excavation (870E11000) | CY | 593 | $50.00 | $32.41 |
| 270 | Natural soil (870E11100) | CY | 41 | $65.00 | $103.65 |
| 271 | 6" drainage pipe, perforated (870E12000) | FT | 308 | $10.00 | $100.82 |
| 272 | 6" drainage pipe, non-perforated (870E12100) | FT | 29 | $18.00 | $79.71 |
| 273 | On-site assistance (870E14000) | DAY | 2 | $1,500.00 | $1,650.00 |
| 274 | PMRW inspection and compaction testing (870E15000) | LS | 1 | $4,000.00 | $5,940.00 |
| 275 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $18,000 | $49,153 |
| 276 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $65,000 | $275,000 |
| 277 | Unclassified excavation (503E21300) | LS | 1 | $18,000 | $32,740 |
| 278 | Epoxy coated steel reinforcement (509E10000) | LB | 11,721 | $2.25 | $3.15 |
| 279 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 182 | $50.00 | $45.66 |
| 280 | Class QC1 concrete, retaining/wingwall not including footing (511E46000) | SY | 61 | $1,250.00 | $1,040.66 |
| 281 | Class QC1 concrete, footing (511E46510) | CY | 49 | $800.00 | $849.97 |
| 282 | Class QC1 concrete, headwall (511E46610) | CY | 0.50 | $8,500.00 | $7,346.88 |
| 283 | Class QC1 concrete, culvert (511E47010) | CY | 17 | $2,500.00 | $2,062.41 |
| 284 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 46 | $75.00 | $44.00 |
| 285 | Type 2 waterproofing (512E33000) | SY | 50 | $40.00 | $83.22 |
| 286 | 1" preformed expansion joint filler (516E13600) | SF | 38 | $20.00 | $51.48 |
| 287 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $3,750.00 | $6,097.93 |
| 288 | Department'S share of the dispute resolution board (100E51100) | EACH | 97,500 | $1.00 | $1.00 |
| 289 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $400,000 | $357,360 |
| 290 | CPM progress schedule (108E10000) | LS | 1 | $1,000.00 | $11,880 |
| 291 | Maintaining traffic (614E11000) | LS | 1 | $1,550,000 | $3,063,854 |
| 292 | Field office, type C, as per plan (619E16021) | MNTH | 48 | $7,000.00 | $7,905.60 |
| 293 | Construction layout stakes and surveying (623E10000) | LS | 1 | $410,000 | $1,127,188 |
| 294 | Mobilization (624E10000) | LS | 1 | $2,830,000 | $1,600,000 |
| 295 | Special - preconstruction video documentation (690E98400) | LS | 1 | $7,000.00 | $7,722.00 |
| 300 | Excavation, as per plan (203E10001) | CY | 5,000 | $15.00 | $52.63 |
| 301 | Granular material, type D (203E35130) | CY | 5,000 | $66.00 | $94.54 |
| 302 | Roadway, misc.:, supporting existing utility poles (203E98600) | EACH | 130 | $1,140.00 | $1,045.00 |
| 303 | Mowing (659E40000) | MSF | 15,350 | $1.00 | $8.80 |
| 304 | Slope erosion protection (670E00500) | SY | 4,200 | $2.25 | $2.48 |
| 305 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 250 | $50.00 | $110.00 |
| 306 | Special - work zone traffic signal (614E11300) | EACH | 1 | $18,500 | $20,350 |
| 307 | Water work, misc.: steel plate water main protecti (638E98600) | FT | 200 | $215.00 | $410.89 |
| 308 | Water work, misc.: temporary steel plate water mai (638E98600) | FT | 200 | $170.00 | $186.36 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.