ODOT contract 268004 bid tabulation
SUM-IR 77-Vacant Rest Area TP. Let by Ohio DOT on April 17, 2026, SUM. 3 bids received; low bid $3,288,842 by Anthony Allega Cement Contractor Inc.
- Owner
- Ohio DOT
- Letting
- 17 APR 2026
- Pay items
- 119
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anthony Allega Cement Contractor Inc | $3,288,842 | Low |
| 2 | Great Lakes Construction Co | $3,373,830 | +3.0% |
| 3 | Tri-Mor Corp | $3,795,446 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anthony Allega Cement Contractor Inc | 2. Great Lakes Construction Co | 3. Tri-Mor Corp |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $19,425 | $20,300 | $42,000 |
| 2 | Headwall removed (202E20010) | EACH | 3 | $761.58 | $450.00 | $450.00 |
| 3 | Pavement removed (202E23000) | SY | 3,300 | $15.63 | $10.50 | $17.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 8 | $98.73 | $105.00 | $15.00 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 4 | $98.73 | $105.00 | $50.00 |
| 6 | Guardrail removed (202E38000) | FT | 262.50 | $2.88 | $2.40 | $3.00 |
| 7 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $198.21 | $165.00 | $185.00 |
| 8 | Bridge terminal assembly removed (202E47000) | EACH | 1 | $114.12 | $95.00 | $105.00 |
| 9 | Fence removed (202E75000) | FT | 300 | $2.84 | $2.50 | $3.00 |
| 10 | Gate removed (202E75250) | EACH | 1 | $209.95 | $185.00 | $205.00 |
| 11 | Excavation (203E10000) | CY | 6,229 | $13.10 | $11.00 | $15.00 |
| 12 | Embankment (203E20000) | CY | 13,558 | $12.37 | $15.50 | $25.00 |
| 13 | Subgrade compaction (204E10000) | SY | 20,244 | $0.96 | $1.00 | $1.00 |
| 14 | Excavation of subgrade (204E13000) | CY | 336 | $34.57 | $37.50 | $35.00 |
| 15 | Granular material, type B (204E30010) | CY | 336 | $74.91 | $41.25 | $90.00 |
| 16 | Proof rolling (204E45000) | HR | 7 | $275.22 | $300.00 | $520.00 |
| 17 | Geotextile fabric (204E50000) | SY | 1,036 | $2.30 | $2.15 | $2.00 |
| 18 | Guardrail, type MGS (606E15050) | FT | 250 | $32.19 | $26.80 | $30.00 |
| 19 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $3,339.49 | $2,780.00 | $3,100.00 |
| 20 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $3,543.71 | $2,950.00 | $3,300.00 |
| 21 | Fence, type CLT (607E23000) | FT | 300 | $38.81 | $34.20 | $40.00 |
| 22 | Gate, type CLT (607E61200) | EACH | 1 | $1,895.19 | $1,670.00 | $2,000.00 |
| 23 | Fenceline seeding and mulching (607E70000) | FT | 350 | $2.27 | $1.83 | $3.00 |
| 24 | Fence, misc.:wooden slate fence (607E98000) | FT | 38 | $209.95 | $185.00 | $205.00 |
| 25 | Special - bollard (690E50600) | EACH | 5 | $902.20 | $795.00 | $900.00 |
| 26 | Special - as-built construction plans (690E91000) | LS | 1 | $5,994.00 | $1,500.00 | $3,000.00 |
| 27 | Special - survey control verification (690E98400) | LS | 1 | $7,215.00 | $1,500.00 | $3,000.00 |
| 28 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 134 | $160.36 | $125.00 | $34.00 |
| 29 | Rock channel protection, type B with filter (601E32100) | CY | 13 | $244.24 | $114.00 | $260.00 |
| 30 | Rock channel protection, type C with filter (601E32200) | CY | 2 | $626.96 | $210.00 | $400.00 |
| 31 | Soil analysis test (659E00100) | EACH | 2 | $88.80 | $80.00 | $400.00 |
| 32 | Topsoil (659E00300) | CY | 2,300 | $18.13 | $15.34 | $45.00 |
| 33 | Seeding and mulching (659E10000) | SY | 20,719 | $1.22 | $1.10 | $1.75 |
| 34 | Commercial fertilizer (659E20000) | TON | 2.80 | $999.00 | $900.00 | $715.00 |
| 35 | Lime (659E31000) | ACRE | 4.28 | $5.55 | $5.00 | $45.00 |
| 36 | Water (659E35000) | MGAL | 112 | $0.56 | $0.50 | $5.00 |
| 37 | Slope erosion protection (670E00500) | SY | 1,929 | $2.09 | $1.88 | $3.00 |
| 38 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,219.00 | $6,000.00 | $3,200.00 |
| 39 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $11,877 | $11,500 | $7,100.00 |
| 40 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $5,661.00 | $10,000 | $10,305 |
| 41 | Erosion control (832E30000) | EACH | 61,000 | $1.00 | $1.00 | $1.00 |
| 42 | Concrete masonry (602E20000) | CY | 1.80 | $4,518.36 | $3,005.00 | $4,000.00 |
| 43 | 6" shallow pipe underdrains (605E11100) | FT | 9,082 | $13.54 | $12.75 | $10.00 |
| 44 | 6" unclassified pipe underdrains (605E13300) | FT | 20 | $33.78 | $27.00 | $18.00 |
| 45 | 6" base pipe underdrains (605E14000) | FT | 4,027 | $11.33 | $12.00 | $10.00 |
| 46 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 609 | $20.68 | $44.00 | $15.00 |
| 47 | 15" conduit, type B (611E05900) | FT | 22 | $226.93 | $390.00 | $135.00 |
| 48 | 24" conduit, type A (611E10200) | FT | 24 | $285.05 | $405.00 | $275.00 |
| 49 | 48" conduit, type B (611E20900) | FT | 61 | $501.40 | $425.00 | $570.00 |
| 50 | Manhole adjusted to grade (611E99654) | EACH | 1 | $980.61 | $900.00 | $740.00 |
| 51 | Precast reinforced concrete outlet (611E99710) | EACH | 12 | $448.95 | $445.00 | $900.00 |
| 52 | Aggregate base (304E20000) | CY | 5,435 | $61.44 | $80.00 | $78.00 |
| 53 | Prime coat, as per plan (408E10001) | GAL | 412 | $9.99 | $9.20 | $10.00 |
| 55 | Curb, type 7 (609E28000) | FT | 2,422 | $31.80 | $27.00 | $18.00 |
| 56 | Compacted aggregate, as per plan (617E10101) | CY | 450 | $62.68 | $60.50 | $67.00 |
| 57 | Connection, fused pull apart (625E00450) | EACH | 26 | $122.10 | $150.00 | $120.00 |
| 58 | Connection, unfused permanent (625E00480) | EACH | 18 | $111.00 | $150.00 | $110.00 |
| 59 | Light pole (installation only), as per plan (625E10503) | EACH | 13 | $555.00 | $1,000.00 | $550.00 |
| 60 | Light pole (installation only), as per plan (625E10503) | EACH | 4 | $1,110.00 | $2,500.00 | $1,100.00 |
| 61 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 13 | $1,887.00 | $1,500.00 | $1,900.00 |
| 62 | Light tower foundation, misc.: 36" X 8' deep (625E15700) | EACH | 4 | $2,775.00 | $5,000.00 | $2,800.00 |
| 63 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 438 | $11.10 | $3.50 | $11.00 |
| 64 | No. 10 AWG pole and bracket cable (625E23400) | FT | 2,340 | $1.55 | $1.25 | $1.50 |
| 65 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 4,495 | $19.98 | $14.00 | $20.00 |
| 66 | Conduit, 3", 725.04 (625E25500) | FT | 111 | $42.18 | $32.00 | $42.00 |
| 67 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 13 | $444.00 | $400.00 | $442.00 |
| 68 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 8 | $999.00 | $1,100.00 | $994.00 |
| 69 | Trench, 24" deep (625E29002) | FT | 4,406 | $15.54 | $6.00 | $15.00 |
| 70 | Pull box, 725.08, 18" (625E30700) | EACH | 5 | $971.25 | $1,200.00 | $1,000.00 |
| 71 | Ground rod (625E32000) | EACH | 21 | $144.30 | $150.00 | $145.00 |
| 72 | Power service, as per plan (625E34001) | EACH | 1 | $8,547.00 | $11,000 | $8,500.00 |
| 73 | Underground warning marking tape (625E36010) | FT | 4,406 | $1.67 | $1.00 | $2.00 |
| 74 | Arc flash calculations and label(CC-'GR') (625E76000) | EACH | 1 | $4,218.00 | $500.00 | $4,200.00 |
| 75 | RPM (621E00100) | EACH | 228 | $43.29 | $39.00 | $65.00 |
| 76 | Raised pavement marker removed (621E54000) | EACH | 228 | $4.30 | $14.08 | $25.00 |
| 77 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 4 | $18.02 | $15.00 | $17.00 |
| 78 | Ground mounted support, no. 2 post (630E02100) | FT | 15.90 | $20.47 | $12.35 | $20.00 |
| 79 | Ground mounted support, no. 3 post (630E03100) | FT | 33.40 | $23.32 | $15.85 | $23.00 |
| 80 | Ground mounted support, no. 4 post (630E04100) | FT | 54.70 | $26.16 | $16.00 | $25.00 |
| 81 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 23.40 | $45.49 | $40.85 | $44.00 |
| 82 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 102.80 | $62.55 | $42.00 | $60.00 |
| 83 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 144.40 | $73.93 | $49.85 | $72.00 |
| 84 | Sign post reflector (630E08600) | EACH | 3 | $51.18 | $26.00 | $50.00 |
| 85 | Breakaway structural beam connection (630E09000) | EACH | 8 | $824.59 | $715.00 | $800.00 |
| 86 | Sign, flat sheet (630E80100) | SF | 63.10 | $22.75 | $23.00 | $22.00 |
| 87 | Sign, ground mounted extrusheet (630E80200) | SF | 324 | $30.71 | $27.00 | $30.00 |
| 88 | Ground mounted structural beam support foundation (630E84500) | EACH | 8 | $1,461.51 | $1,400.00 | $1,500.00 |
| 89 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $73.93 | $225.00 | $72.00 |
| 90 | Edge line, 6" (646E10010) | MI | 2.67 | $2,886.00 | $2,600.00 | $4,200.00 |
| 91 | Lane line, 6" (646E10110) | MI | 2.38 | $2,109.00 | $1,900.00 | $2,850.00 |
| 92 | Channelizing line, 12" (646E10310) | FT | 2,855 | $1.50 | $1.35 | $3.00 |
| 93 | Transverse/diagonal line, as per plan (646E10601) | FT | 511 | $7.22 | $6.50 | $7.00 |
| 94 | Chevron marking (646E10620) | FT | 86 | $7.22 | $6.50 | $11.00 |
| 95 | Parking lot stall marking (646E20200) | FT | 2,111 | $1.94 | $1.75 | $4.00 |
| 96 | Dotted line, 6" (646E20504) | FT | 1,544 | $1.89 | $1.70 | $2.00 |
| 97 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $133.20 | $100.00 | $90.00 |
| 98 | Increased barrier delineation (614E11630) | FT | 120 | $4.53 | $4.08 | $3.00 |
| 99 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,508.75 | $2,260.13 | $3,000.00 |
| 100 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 474 | $7.50 | $6.76 | $8.00 |
| 101 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 65 | $12.94 | $11.66 | $10.00 |
| 102 | Object marker, one way (614E13350) | EACH | 63 | $24.11 | $21.72 | $16.00 |
| 103 | Maintaining traffic, misc.: shoulder rumble strips (614E18030) | FT | 5,666 | $5.55 | $6.26 | $10.00 |
| 104 | Work zone lane line, class I, 6" (614E20010) | MI | 1.62 | $888.00 | $800.00 | $2,000.00 |
| 105 | Work zone edge line, class I, 6" (614E22010) | MI | 2.38 | $1,060.05 | $955.00 | $2,000.00 |
| 106 | Work zone channelizing line, class I, 8" (614E23000) | FT | 3,960 | $1.11 | $1.00 | $1.00 |
| 107 | Water (616E10000) | MGAL | 40 | $76.18 | $50.00 | $190.00 |
| 108 | Portable barrier, unanchored (622E41100) | FT | 3,200 | $20.77 | $26.00 | $45.00 |
| 109 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 12 | $702.15 | $632.57 | $750.00 |
| 110 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 953 | $217.56 | $148.00 | $164.00 |
| 112 | Non-tracking tack coat (407E20000) | GAL | 867 | $3.33 | $3.15 | $3.50 |
| 113 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 329 | $330.78 | $242.00 | $268.00 |
| 114 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 548 | $273.06 | $196.00 | $215.00 |
| 115 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 2,975 | $3.80 | $0.80 | $3.00 |
| 117 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 12,295 | $62.92 | $75.00 | $75.00 |
| 119 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,968 | $24,000 | $39,000 |
| 120 | Maintaining traffic (614E11000) | LS | 1 | $89,117 | $65,000 | $102,000 |
| 121 | Field office, type B (619E16010) | MNTH | 6 | $2,994.11 | $3,500.00 | $3,200.00 |
| 122 | Construction layout stakes and surveying (623E10000) | LS | 1 | $17,663 | $32,000 | $38,700 |
| 123 | Mobilization (624E10000) | LS | 1 | $102,762 | $165,000 | $85,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 17, 2026. Compiled by Mirage Metrics.