Tri-Mor Corp: ODOT bid record

Tri-Mor Corp submitted 35 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 OCT 2026, and was the low bidder on 3 of them (9%). When it was not low, its total sat a median +20% above the low bid.

Owner
Ohio DOT
Low bid volume
$13,443,381
Latest bid
29 OCT 2026
Data through
12 NOV 2026
35Bids
3Low bids
9Win rate, percent
+20%Median gap to the low bid when not low, 32 bids

By year

YearBidsLow bidsWin rate
2020700%
20211318%
2022200%
2023100%
2024300%
2025300%
20266233%
Tri-Mor Corp, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY9222%
MED500%
GEA4125%
POR400%
SUM300%
LOR200%
ASD200%
WAY200%
STA100%
ATB100%
MAH100%
TRU100%
Tri-Mor Corp, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH3434 (100%)$1.00$1.00
Subgrade compaction204E10000SY3510 (29%)$1.25$3.00
Embankment203E20000CY3210 (31%)$15.00$25.00
6" conduit, type F for underdrain outlets611E00510FT209 (45%)$15.50$26.00
Proof rolling204E45000HR258 (32%)$150.00$219.05
Curb, type 6609E26000FT227 (32%)$20.00$37.50
Excavation203E10000CY336 (18%)$18.00$27.00
Manhole adjusted to grade611E99654EACH156 (40%)$740.00$950.00
Pipe removed, 24" and under202E35100FT195 (26%)$15.00$20.00
6" unclassified pipe underdrains605E13300FT115 (45%)$15.00$19.17
Special - mailbox support system, single690E50100EACH174 (24%)$200.00$200.00
Tied concrete block mat with type 1 underlayment601E21050SY124 (33%)$100.00$152.00
Tri-Mor Corp, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Tri-Mor Corp, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026260399CUYCUY-US 422-16.20 Interchange (INTERCHANGE)1 of 4$11,288,797Low, 7.0% under the second
01 OCT 2026260429MEDMED-SR 3-20.63 (INTERSECTION)3 of 6$2,029,451+10%
27 AUG 2026260388MEDMED-SR 162-25.11 (INTERSECTION)3 of 4$2,029,895+24%
17 APR 2026268004SUMSUM-IR 77-Vacant Rest Area TP3 of 3$3,795,446+15%
15 JAN 2026260010CUYCUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION)1 of 9$1,870,651Low, 6.0% under the second
15 JAN 2026268000TRUTRU-IR 80-11.32 Truck Parking (PARKING AREAS)2 of 7$4,797,256+2.0%
13 NOV 2025250529MAHMAH-Afton Ave (SRTS) (SIDEWALK)6 of 6$339,318+39%
14 AUG 2025250377CUYCUY-SRTS FY2023 Warrensville Hts (SPOT SAFETY)5 of 6$758,161+21%
27 FEB 2025250134SUMSUM-CR 111/CR 25-04.33/04.10 (INTERSECTION)4 of 4$3,986,740+11%
18 APR 2024240248WAYWAY-SR 57-10.32 (INTERSECTION)4 of 5$1,525,255+4.0%
22 FEB 2024240124ASDASD-US 42-14.77 (PART 1 AND PART 2) (INTERSECTION)5 of 6$4,487,196+8.0%
08 FEB 2024240112WAYWAY-US 30-11.64 (SPOT PATCHING / PAVEMENT REPAIR)5 of 7$1,423,598+25%
09 FEB 2023230081CUYCUY-SR 175 Multi-Purpose Trail (SIDEWALK)5 of 8$756,165+9.0%
13 OCT 2022220529PORPOR-SR 43-18.65 (MINOR RECONSTRUCTION)7 of 7$7,999,313+36%
29 SEP 2022220533CUYCUY-US 422-18.74/VAR Slide (SLIDE REPAIR)6 of 11$1,198,441+42%
30 SEP 2021210503ATBATB-SR 45-19.47 (INTERSECTION)7 of 7$1,877,534+34%
16 SEP 2021210491GEAGEA-US 422-00.30 Slope (SLIDE REPAIR)1 of 6$283,933Low, 2.0% under the second
12 AUG 2021210456CUYCUY-North Royalton TLCI Sidewalk (SIDEWALK)3 of 5$103,028+18%
12 AUG 2021210472MEDMED-SR 57-17.65 (CULVERT REPLACEMENT)7 of 11$1,583,643+19%
29 JUL 2021210443PORPOR-SR 82-05.84 (INTERSECTION)5 of 6$2,289,595+17%
01 JUL 2021210362ASDASD-US 30-00.11 (INTERSECTION)5 of 6$4,273,863+23%
13 MAY 2021210296CUYCUY-SR 175-07.97 (SPOT PATCHING / PAVEMENT REPAIR)6 of 6$849,582+45%
29 APR 2021210240MEDMED-SR 3-09.04 (INTERSECTION)4 of 8$1,147,359+5.0%
15 APR 2021210238LORLOR-SR 113-03.75 Baumhart Sfty (INTERSECTION)6 of 6$1,997,498+32%
25 FEB 2021210071PORPOR-SR 14-03.65 (MINOR RECONSTRUCTION)8 of 10$5,798,267+25%
Tri-Mor Corp: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way