Tri-Mor Corp: ODOT bid record
Tri-Mor Corp submitted 35 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 OCT 2026, and was the low bidder on 3 of them (9%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $13,443,381
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 0 | 0% |
| 2021 | 13 | 1 | 8% |
| 2022 | 2 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 0 | 0% |
| 2025 | 3 | 0 | 0% |
| 2026 | 6 | 2 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 9 | 2 | 22% |
| MED | 5 | 0 | 0% |
| GEA | 4 | 1 | 25% |
| POR | 4 | 0 | 0% |
| SUM | 3 | 0 | 0% |
| LOR | 2 | 0 | 0% |
| ASD | 2 | 0 | 0% |
| WAY | 2 | 0 | 0% |
| STA | 1 | 0 | 0% |
| ATB | 1 | 0 | 0% |
| MAH | 1 | 0 | 0% |
| TRU | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 34 | 34 (100%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 35 | 10 (29%) | $1.25 | $3.00 |
| Embankment | 203E20000 | CY | 32 | 10 (31%) | $15.00 | $25.00 |
| 6" conduit, type F for underdrain outlets | 611E00510 | FT | 20 | 9 (45%) | $15.50 | $26.00 |
| Proof rolling | 204E45000 | HR | 25 | 8 (32%) | $150.00 | $219.05 |
| Curb, type 6 | 609E26000 | FT | 22 | 7 (32%) | $20.00 | $37.50 |
| Excavation | 203E10000 | CY | 33 | 6 (18%) | $18.00 | $27.00 |
| Manhole adjusted to grade | 611E99654 | EACH | 15 | 6 (40%) | $740.00 | $950.00 |
| Pipe removed, 24" and under | 202E35100 | FT | 19 | 5 (26%) | $15.00 | $20.00 |
| 6" unclassified pipe underdrains | 605E13300 | FT | 11 | 5 (45%) | $15.00 | $19.17 |
| Special - mailbox support system, single | 690E50100 | EACH | 17 | 4 (24%) | $200.00 | $200.00 |
| Tied concrete block mat with type 1 underlayment | 601E21050 | SY | 12 | 4 (33%) | $100.00 | $152.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 24 | 16 of 24 |
| Karvo Companies Inc | 22 | 15 of 22 |
| Eclipse Co LLC | 20 | 15 of 20 |
| Catts Construction Inc | 12 | 10 of 12 |
| Lockhart Concrete Co | 12 | 5 of 12 |
| S E T Inc | 11 | 3 of 11 |
| Perk Company Inc | 10 | 6 of 10 |
| Great Lakes Construction Co | 9 | 4 of 9 |
| Marucci & Gaffney Excavating Co | 9 | 6 of 9 |
| Digioia-Suburban Excavating LLC | 8 | 7 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 260399 | CUY | CUY-US 422-16.20 Interchange (INTERCHANGE) | 1 of 4 | $11,288,797 | Low, 7.0% under the second |
| 01 OCT 2026 | 260429 | MED | MED-SR 3-20.63 (INTERSECTION) | 3 of 6 | $2,029,451 | +10% |
| 27 AUG 2026 | 260388 | MED | MED-SR 162-25.11 (INTERSECTION) | 3 of 4 | $2,029,895 | +24% |
| 17 APR 2026 | 268004 | SUM | SUM-IR 77-Vacant Rest Area TP | 3 of 3 | $3,795,446 | +15% |
| 15 JAN 2026 | 260010 | CUY | CUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION) | 1 of 9 | $1,870,651 | Low, 6.0% under the second |
| 15 JAN 2026 | 268000 | TRU | TRU-IR 80-11.32 Truck Parking (PARKING AREAS) | 2 of 7 | $4,797,256 | +2.0% |
| 13 NOV 2025 | 250529 | MAH | MAH-Afton Ave (SRTS) (SIDEWALK) | 6 of 6 | $339,318 | +39% |
| 14 AUG 2025 | 250377 | CUY | CUY-SRTS FY2023 Warrensville Hts (SPOT SAFETY) | 5 of 6 | $758,161 | +21% |
| 27 FEB 2025 | 250134 | SUM | SUM-CR 111/CR 25-04.33/04.10 (INTERSECTION) | 4 of 4 | $3,986,740 | +11% |
| 18 APR 2024 | 240248 | WAY | WAY-SR 57-10.32 (INTERSECTION) | 4 of 5 | $1,525,255 | +4.0% |
| 22 FEB 2024 | 240124 | ASD | ASD-US 42-14.77 (PART 1 AND PART 2) (INTERSECTION) | 5 of 6 | $4,487,196 | +8.0% |
| 08 FEB 2024 | 240112 | WAY | WAY-US 30-11.64 (SPOT PATCHING / PAVEMENT REPAIR) | 5 of 7 | $1,423,598 | +25% |
| 09 FEB 2023 | 230081 | CUY | CUY-SR 175 Multi-Purpose Trail (SIDEWALK) | 5 of 8 | $756,165 | +9.0% |
| 13 OCT 2022 | 220529 | POR | POR-SR 43-18.65 (MINOR RECONSTRUCTION) | 7 of 7 | $7,999,313 | +36% |
| 29 SEP 2022 | 220533 | CUY | CUY-US 422-18.74/VAR Slide (SLIDE REPAIR) | 6 of 11 | $1,198,441 | +42% |
| 30 SEP 2021 | 210503 | ATB | ATB-SR 45-19.47 (INTERSECTION) | 7 of 7 | $1,877,534 | +34% |
| 16 SEP 2021 | 210491 | GEA | GEA-US 422-00.30 Slope (SLIDE REPAIR) | 1 of 6 | $283,933 | Low, 2.0% under the second |
| 12 AUG 2021 | 210456 | CUY | CUY-North Royalton TLCI Sidewalk (SIDEWALK) | 3 of 5 | $103,028 | +18% |
| 12 AUG 2021 | 210472 | MED | MED-SR 57-17.65 (CULVERT REPLACEMENT) | 7 of 11 | $1,583,643 | +19% |
| 29 JUL 2021 | 210443 | POR | POR-SR 82-05.84 (INTERSECTION) | 5 of 6 | $2,289,595 | +17% |
| 01 JUL 2021 | 210362 | ASD | ASD-US 30-00.11 (INTERSECTION) | 5 of 6 | $4,273,863 | +23% |
| 13 MAY 2021 | 210296 | CUY | CUY-SR 175-07.97 (SPOT PATCHING / PAVEMENT REPAIR) | 6 of 6 | $849,582 | +45% |
| 29 APR 2021 | 210240 | MED | MED-SR 3-09.04 (INTERSECTION) | 4 of 8 | $1,147,359 | +5.0% |
| 15 APR 2021 | 210238 | LOR | LOR-SR 113-03.75 Baumhart Sfty (INTERSECTION) | 6 of 6 | $1,997,498 | +32% |
| 25 FEB 2021 | 210071 | POR | POR-SR 14-03.65 (MINOR RECONSTRUCTION) | 8 of 10 | $5,798,267 | +25% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.