ODOT contract 268000 bid tabulation
TRU-IR 80-11.32 Truck Parking (PARKING AREAS). Let by Ohio DOT on January 15, 2026, TRU. 7 bids received; low bid $4,717,162 by Shelly & Sands Inc, -32% against the engineer's estimate of $6,937,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 139
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $4,717,162 | Low | -32% |
| 2 | Tri-Mor Corp | $4,797,256 | +2.0% | -31% |
| 3 | Karvo Companies Inc | $4,817,315 | +2.0% | -31% |
| 4 | Great Lakes Construction Co | $4,905,531 | +4.0% | -29% |
| 5 | Marucci & Gaffney Excavating Co | $5,143,875 | +9.0% | -26% |
| 6 | Ruhlin Company | $5,405,890 | +15% | -22% |
| 7 | Rudzik Excavating Inc | $6,370,000 | +35% | -8.0% |
Engineer's estimate: $6,937,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Tri-Mor Corp | 3. Karvo Companies Inc | 4. Great Lakes Construction Co | 5. Marucci & Gaffney Excavating Co | 6. Ruhlin Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $12,800 | $15,000 | $30,000 | $65,000 | $200,000 | $43,000 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $540.00 | $500.00 | $1,000.00 | $300.00 | $500.00 | $253.00 |
| 3 | Pavement removed (202E23000) | SY | 3,153 | $10.00 | $18.00 | $15.00 | $12.00 | $9.90 | $11.00 |
| 4 | Pavement removed (202E23000) | SY | 2,462 | $11.00 | $25.00 | $35.00 | $16.00 | $13.90 | $11.00 |
| 5 | Pavement removed (202E23000) | SY | 4,556 | $2.80 | $10.00 | $5.00 | $8.00 | $3.25 | $5.30 |
| 6 | Walk removed (202E30000) | SF | 13,713 | $0.50 | $2.00 | $2.00 | $1.15 | $0.70 | $2.80 |
| 7 | Curb removed (202E32000) | FT | 1,778 | $2.00 | $9.00 | $4.00 | $1.50 | $2.00 | $3.00 |
| 8 | Pipe removed, 24" and under (202E35100) | FT | 584 | $31.00 | $16.00 | $45.00 | $17.00 | $19.00 | $15.50 |
| 9 | Catch basin removed (202E58100) | EACH | 5 | $590.00 | $425.00 | $575.00 | $630.00 | $200.00 | $400.00 |
| 10 | Fence removed (202E75000) | FT | 405 | $3.00 | $3.25 | $5.00 | $3.00 | $3.00 | $14.00 |
| 11 | Gate removed, as per plan (202E75251) | EACH | 2 | $475.00 | $510.00 | $500.00 | $325.00 | $475.00 | $500.00 |
| 12 | Removal misc.: inspection well (202E98100) | EACH | 1 | $500.00 | $160.00 | $525.00 | $315.00 | $500.00 | $1,400.00 |
| 13 | Removal misc.: rest area appurtenances (202E98100) | EACH | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Removal misc.: conduit (202E98200) | FT | 50 | $5.00 | $13.00 | $10.00 | $12.00 | $10.00 | $12.00 |
| 15 | Excavation (203E10000) | CY | 9,328 | $18.00 | $16.50 | $25.00 | $21.00 | $18.10 | $19.00 |
| 16 | Embankment (203E20000) | CY | 4,189 | $8.00 | $6.00 | $10.00 | $7.00 | $13.53 | $38.00 |
| 17 | Embankment, as per plan (203E20001) | CY | 100 | $14.00 | $15.50 | $50.00 | $15.00 | $13.53 | $63.00 |
| 18 | Subgrade compaction (204E10000) | SY | 21,513 | $2.00 | $1.50 | $3.00 | $1.00 | $1.12 | $1.60 |
| 19 | Excavation of subgrade (204E13000) | CY | 2,815 | $25.00 | $21.00 | $25.00 | $25.00 | $13.17 | $19.00 |
| 20 | Excavation of subgrade (204E13000) | CY | 1,338 | $27.00 | $35.00 | $75.00 | $27.00 | $22.00 | $25.00 |
| 21 | Granular material, type B (204E30010) | CY | 4,152 | $60.00 | $60.00 | $60.00 | $65.00 | $39.47 | $70.00 |
| 22 | Proof rolling (204E45000) | HR | 14 | $670.00 | $200.00 | $400.00 | $385.00 | $150.00 | $165.00 |
| 23 | Geotextile fabric (204E50000) | SY | 17,618 | $0.90 | $1.35 | $1.00 | $2.00 | $1.50 | $0.50 |
| 24 | Linear grading (209E60200) | STA | 26 | $180.00 | $500.00 | $325.00 | $240.00 | $100.00 | $57.00 |
| 25 | Fence, type 47RA (607E15100) | FT | 320 | $27.00 | $30.00 | $29.50 | $26.50 | $26.50 | $29.50 |
| 26 | Fence, misc.: dumpster screen wall (607E98000) | FT | 40 | $285.00 | $310.00 | $243.50 | $285.00 | $285.00 | $243.50 |
| 27 | 5" concrete walk (608E12000) | SF | 516 | $12.00 | $11.00 | $15.00 | $15.00 | $15.00 | $12.50 |
| 28 | Curb ramp (608E52000) | SF | 248 | $24.00 | $20.00 | $15.00 | $22.00 | $30.00 | $29.00 |
| 29 | Special - bollard (690E50600) | EACH | 10 | $795.00 | $1,650.00 | $275.00 | $1,060.00 | $420.00 | $800.00 |
| 30 | Special - as-built construction plans (690E91000) | LS | 1 | $3,000.00 | $2,500.00 | $2,500.00 | $4,000.00 | $1,000.00 | $3,000.00 |
| 31 | Special - survey control verification (690E98400) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $10,000 | $1,000.00 | $7,500.00 |
| 32 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 14 | $150.00 | $75.00 | $250.00 | $195.00 | $225.00 | $165.00 |
| 33 | Soil analysis test (659E00100) | EACH | 2 | $25.00 | $200.00 | $25.00 | $25.00 | $10.00 | $25.00 |
| 34 | Topsoil (659E00300) | CY | 1,920 | $15.00 | $40.00 | $20.00 | $46.00 | $35.00 | $44.00 |
| 35 | Seeding and mulching (659E10000) | SY | 17,294 | $0.70 | $2.00 | $1.50 | $0.67 | $0.75 | $0.67 |
| 36 | Commercial fertilizer (659E20000) | TON | 2.33 | $250.00 | $3,500.00 | $250.00 | $250.00 | $400.00 | $250.00 |
| 37 | Lime (659E31000) | ACRE | 3.57 | $25.00 | $250.00 | $25.00 | $25.00 | $20.00 | $25.00 |
| 38 | Water (659E35000) | MGAL | 93 | $0.10 | $400.00 | $0.10 | $1.00 | $0.01 | $0.10 |
| 39 | Slope erosion protection (670E00500) | SY | 1,472 | $1.25 | $2.00 | $1.25 | $1.25 | $4.00 | $1.25 |
| 40 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,800.00 | $3,000.00 | $10,000 | $3,000.00 | $5,000.00 | $2,800.00 |
| 41 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $8,560.00 | $9,200.00 | $15,000 | $10,000 | $9,000.00 | $12,840 |
| 42 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $11,600 | $12,425 | $25,000 | $15,000 | $12,000 | $11,600 |
| 43 | Erosion control (832E30000) | EACH | 60,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 44 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 157 | $4.50 | $8.00 | $4.50 | $4.50 | $9.00 | $4.50 |
| 45 | Concrete masonry (602E20000) | CY | 0.50 | $1,760.00 | $2,600.00 | $1,575.00 | $3,000.00 | $3,000.00 | $3,350.00 |
| 46 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 20 | $26.00 | $12.00 | $28.00 | $22.00 | $25.00 | $70.00 |
| 47 | 6" rock cut underdrains with geotextile fabric (605E13510) | FT | 2,311 | $13.00 | $15.00 | $20.00 | $17.00 | $16.05 | $15.00 |
| 48 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 4,754 | $10.00 | $10.00 | $20.00 | $17.00 | $11.90 | $15.00 |
| 49 | Aggregate drains (605E31100) | FT | 50 | $8.00 | $18.00 | $25.00 | $14.00 | $10.00 | $21.00 |
| 50 | 4" conduit, type C (611E00200) | FT | 40 | $16.00 | $15.00 | $20.00 | $36.00 | $4.00 | $45.00 |
| 51 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 147 | $25.00 | $13.00 | $15.00 | $55.00 | $25.00 | $50.00 |
| 52 | 12" conduit, type B (611E04400) | FT | 196 | $83.00 | $65.00 | $80.00 | $115.00 | $70.00 | $95.00 |
| 53 | 18" conduit, type B (611E07400) | FT | 50 | $113.00 | $90.00 | $115.00 | $135.00 | $75.00 | $140.00 |
| 54 | 24" conduit, type B (611E10400) | FT | 159 | $147.00 | $135.00 | $80.00 | $175.00 | $85.00 | $190.00 |
| 55 | 24" conduit, type C (611E10600) | FT | 110 | $130.00 | $130.00 | $90.00 | $160.00 | $77.00 | $145.00 |
| 56 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 50 | $27.00 | $35.00 | $20.00 | $50.00 | $10.00 | $75.00 |
| 57 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 50 | $27.00 | $35.00 | $20.00 | $45.00 | $10.00 | $75.00 |
| 58 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 50 | $24.00 | $35.00 | $20.00 | $45.00 | $10.00 | $75.00 |
| 59 | Catch basin, no. 3 (611E98150) | EACH | 5 | $5,300.00 | $5,000.00 | $3,750.00 | $6,500.00 | $4,900.00 | $3,600.00 |
| 60 | Precast reinforced concrete outlet (611E99710) | EACH | 7 | $266.00 | $775.00 | $150.00 | $400.00 | $200.00 | $510.00 |
| 61 | Inspection well (611E99720) | EACH | 1 | $1,650.00 | $625.00 | $650.00 | $2,200.00 | $250.00 | $2,400.00 |
| 62 | Pavement planing, asphalt concrete [T = 3"] (254E01000) | SY | 8,279 | $5.00 | $5.00 | $1.50 | $4.00 | $5.00 | $4.88 |
| 63 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 73 | $325.02 | $370.00 | $300.00 | $340.00 | $325.00 | $340.00 |
| 64 | Aggregate base (304E20000) | CY | 3,644 | $62.00 | $60.00 | $75.00 | $60.00 | $72.00 | $80.00 |
| 65 | Non-tracking tack coat (407E20000) | GAL | 1,179 | $3.05 | $4.50 | $2.25 | $4.00 | $3.05 | $4.00 |
| 66 | Prime coat, as per plan (408E10001) | GAL | 457 | $3.50 | $8.50 | $8.00 | $8.00 | $3.50 | $8.00 |
| 67 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 360 | $250.00 | $325.00 | $300.00 | $295.00 | $250.00 | $295.00 |
| 68 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 360 | $202.00 | $325.00 | $300.00 | $295.00 | $202.00 | $295.00 |
| 69 | 9" reinforced concrete pavement, class QC 1P (451E14010) | SY | 20,353 | $103.00 | $94.00 | $80.00 | $93.00 | $116.95 | $107.50 |
| 70 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 104 | $106.00 | $94.00 | $100.00 | $130.00 | $90.00 | $107.00 |
| 71 | Curb, type 6 (609E26000) | FT | 290 | $16.00 | $20.00 | $20.00 | $63.00 | $43.00 | $23.00 |
| 72 | Curb, type 7 (609E28000) | FT | 652 | $28.00 | $25.00 | $20.00 | $65.00 | $52.00 | $17.00 |
| 73 | Compacted aggregate, as per plan (617E10101) | CY | 32 | $230.00 | $130.00 | $125.00 | $225.00 | $230.00 | $225.00 |
| 74 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 2,552 | $2.60 | $9.00 | $2.45 | $2.45 | $2.70 | $2.58 |
| 75 | Special - pavement overlay fabric composite (690E12060) | SY | 85 | $60.00 | $86.00 | $60.00 | $72.00 | $60.00 | $72.00 |
| 76 | Connection, fused pull apart (625E00450) | EACH | 50 | $150.00 | $160.00 | $148.70 | $148.70 | $148.70 | $180.00 |
| 77 | Connection, unfused permanent (625E00480) | EACH | 9 | $150.00 | $141.00 | $131.50 | $131.50 | $131.50 | $160.00 |
| 78 | Light pole, conventional, AT22B40 (625E10490) | EACH | 18 | $5,300.00 | $5,500.00 | $5,042.00 | $5,042.00 | $5,042.00 | $4,540.00 |
| 79 | Light tower, misc.: BB45 (625E13500) | EACH | 7 | $17,500 | $11,000 | $10,236 | $10,236 | $10,236 | $18,450 |
| 80 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 18 | $1,600.00 | $2,000.00 | $1,848.00 | $1,848.00 | $1,848.00 | $1,540.00 |
| 81 | Light tower foundation, misc.: 36" X 8' deep, as P (625E15700) | EACH | 7 | $5,000.00 | $4,500.00 | $4,144.29 | $4,144.29 | $4,144.29 | $8,750.00 |
| 82 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 285 | $3.00 | $5.00 | $4.44 | $4.44 | $4.44 | $4.00 |
| 83 | No. 10 AWG pole and bracket cable (625E23400) | FT | 3,348 | $1.50 | $1.00 | $0.92 | $0.92 | $0.92 | $2.00 |
| 84 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 5,472 | $10.00 | $14.00 | $12.92 | $12.92 | $12.92 | $15.50 |
| 85 | Conduit, 3", 725.04 (625E25500) | FT | 85 | $35.00 | $35.00 | $31.81 | $31.81 | $31.81 | $36.00 |
| 86 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 18 | $450.00 | $510.00 | $472.80 | $472.80 | $472.80 | $466.00 |
| 87 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 14 | $1,500.00 | $2,000.00 | $1,827.00 | $1,827.00 | $1,827.00 | $1,450.00 |
| 88 | Trench, 24" deep (625E29002) | FT | 5,152 | $7.00 | $9.00 | $8.33 | $8.33 | $8.33 | $8.00 |
| 89 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $1,500.00 | $1,335.00 | $1,243.00 | $1,243.00 | $1,243.00 | $1,060.00 |
| 90 | Ground rod (625E32000) | EACH | 25 | $200.00 | $200.00 | $165.00 | $165.20 | $165.20 | $245.00 |
| 91 | Power service, as per plan (625E34001) | EACH | 1 | $10,000 | $13,400 | $12,430 | $12,430 | $12,430 | $8,200.00 |
| 92 | Control center cabinet, complete (625E34450) | EACH | 1 | $6,000.00 | $6,900.00 | $6,360.00 | $6,360.00 | $6,360.00 | $5,100.00 |
| 93 | Underground warning/marking tape, as per plan (625E36011) | FT | 4,840 | $1.00 | $1.50 | $1.37 | $1.37 | $1.37 | $1.00 |
| 94 | Arc flash calculations and label (tru-80 truck par (625E76000) | EACH | 1 | $500.00 | $2,075.00 | $1,920.00 | $1,920.00 | $1,920.00 | $685.00 |
| 95 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 7 | $110.00 | $120.00 | $105.00 | $98.00 | $110.00 | $105.00 |
| 96 | Ground mounted support, no. 3 post (630E03100) | FT | 230 | $17.00 | $12.00 | $10.50 | $9.00 | $17.00 | $10.50 |
| 97 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 110 | $45.00 | $25.00 | $23.00 | $22.80 | $45.00 | $23.00 |
| 98 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 46 | $65.00 | $55.00 | $46.00 | $45.00 | $65.00 | $46.00 |
| 99 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 43 | $57.00 | $45.00 | $36.00 | $34.00 | $57.00 | $36.00 |
| 100 | Sign post reflector (630E08600) | EACH | 12 | $45.00 | $30.00 | $21.00 | $20.00 | $45.00 | $21.00 |
| 101 | Breakaway structural beam connection (630E09000) | EACH | 10 | $635.00 | $550.00 | $500.00 | $475.00 | $635.00 | $500.00 |
| 102 | Sign, flat sheet (630E80100) | SF | 202 | $16.00 | $18.00 | $16.50 | $15.50 | $16.00 | $16.50 |
| 103 | Sign, ground mounted extrusheet (630E80200) | SF | 242 | $23.50 | $30.00 | $26.50 | $25.00 | $23.50 | $26.50 |
| 104 | Ground mounted structural beam support foundation (630E84500) | EACH | 10 | $845.00 | $1,400.00 | $1,250.00 | $1,100.00 | $845.00 | $1,250.00 |
| 105 | Removal of ground mounted sign and disposal (630E84900) | EACH | 26 | $10.00 | $25.00 | $23.00 | $22.00 | $10.00 | $23.00 |
| 106 | Removal of ground mounted post support and disposal (630E86002) | EACH | 18 | $20.00 | $30.00 | $26.00 | $25.00 | $20.00 | $26.00 |
| 107 | Edge line, 6" (646E10010) | MI | 1.45 | $3,765.00 | $7,500.00 | $7,000.00 | $7,000.00 | $3,300.00 | $7,000.00 |
| 108 | Channelizing line, 12" (646E10310) | FT | 2,465 | $2.00 | $2.00 | $1.50 | $1.50 | $1.35 | $1.50 |
| 109 | Transverse/diagonal line (646E10600) | FT | 1,364 | $4.00 | $7.00 | $6.00 | $6.00 | $13.00 | $6.00 |
| 110 | Chevron marking (646E10620) | FT | 110 | $12.50 | $14.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 111 | Parking lot stall marking (646E20200) | FT | 3,618 | $3.50 | $1.50 | $1.35 | $1.35 | $2.00 | $1.35 |
| 112 | Dotted line, 6" (646E20504) | FT | 1,323 | $2.00 | $2.00 | $1.95 | $1.95 | $1.25 | $1.95 |
| 113 | Light pole, conventional, AT40 (625E10490) | EACH | 4 | $2,750.00 | $3,700.00 | $3,359.00 | $3,359.00 | $3,359.00 | $2,905.00 |
| 114 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 4 | $1,600.00 | $2,000.00 | $1,818.00 | $1,818.00 | $1,818.00 | $1,450.00 |
| 115 | No. 6 AWG 600 volt distribution cable (625E22990) | FT | 3,480 | $2.25 | $3.00 | $2.64 | $2.64 | $2.64 | $3.00 |
| 116 | Conduit, 2", 725.051 (625E25408) | FT | 990 | $8.00 | $5.00 | $3.95 | $3.95 | $3.95 | $5.00 |
| 117 | Conduit, 3", 725.04 (625E25500) | FT | 180 | $35.00 | $32.00 | $29.40 | $29.40 | $29.40 | $38.00 |
| 118 | Trench, 30" deep (625E29010) | FT | 185 | $15.00 | $18.00 | $16.43 | $16.43 | $16.43 | $9.00 |
| 119 | Pull box, 725.08, 18" (625E30700) | EACH | 5 | $1,200.00 | $1,175.00 | $1,090.50 | $1,090.50 | $1,090.50 | $1,211.00 |
| 120 | Ground rod (625E32000) | EACH | 13 | $200.00 | $170.00 | $156.62 | $156.62 | $156.62 | $245.00 |
| 121 | Underground warning marking tape (625E36010) | FT | 1,550 | $2.50 | $2.00 | $1.45 | $1.45 | $1.45 | $1.00 |
| 122 | Arc flash calculations and label (tru-80 truck par (625E76000) | EACH | 2 | $500.00 | $2,100.00 | $1,920.00 | $1,920.00 | $1,920.00 | $685.00 |
| 123 | ITS pull box with pad and standard lid assembly, 3 (809E01900) | EACH | 9 | $4,000.00 | $5,320.00 | $4,950.00 | $4,950.00 | $4,950.00 | $2,600.00 |
| 124 | Conduit, 2" diameter, HDPE (809E23900) | FT | 1,325 | $6.00 | $5.00 | $4.36 | $4.36 | $4.36 | $4.50 |
| 125 | CCTV IP-camera system, fixed-view (809E60060) | EACH | 4 | $3,500.00 | $4,000.00 | $3,612.50 | $3,612.50 | $3,612.50 | $3,300.00 |
| 126 | Ethernet cable, outdoor-rated (809E64550) | FT | 670 | $3.00 | $2.00 | $1.77 | $1.77 | $1.77 | $3.00 |
| 127 | ITS cabinet - ground mounted (809E65000) | EACH | 2 | $14,000 | $12,100 | $11,240 | $11,240 | $11,240 | $10,240 |
| 128 | Step-down transformer, 3KVA (809E65100) | EACH | 2 | $1,000.00 | $945.00 | $880.00 | $880.00 | $880.00 | $3,500.00 |
| 129 | As-built construction plans (809E70050) | LS | 1 | $1,000.00 | $260.00 | $5,000.00 | $250.00 | $241.00 | $3,000.00 |
| 130 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $95.00 | $93.00 | $125.00 | $100.00 | $90.00 | $100.00 |
| 131 | Work zone increased penalties sign (614E12484) | EACH | 4 | $320.00 | $500.00 | $235.00 | $215.00 | $200.00 | $235.00 |
| 132 | Portable changeable message sign, as per plan (614E18601) | SNMT | 3 | $900.00 | $1,000.00 | $785.00 | $735.00 | $1,100.00 | $785.00 |
| 133 | Water (616E10000) | MGAL | 30 | $111.00 | $85.00 | $1.00 | $60.00 | $1.00 | $37.54 |
| 134 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 6 | $650.00 | $700.00 | $615.00 | $585.00 | $700.00 | $615.00 |
| 135 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,500.00 | $55,000 | $25,000 | $35,000 | $30,000 | $27,500 |
| 136 | Maintaining traffic (614E11000) | LS | 1 | $17,000 | $50,000 | $50,000 | $16,600 | $43,000 | $24,000 |
| 137 | Field office, type C (619E16020) | MNTH | 8 | $3,750.00 | $3,300.00 | $3,000.00 | $4,300.00 | $1,500.00 | $7,000.00 |
| 138 | Construction layout stakes and surveying (623E10000) | LS | 1 | $16,000 | $28,825 | $135,000 | $40,000 | $28,000 | $59,000 |
| 139 | Mobilization (624E10000) | LS | 1 | $235,000 | $75,000 | $225,000 | $245,000 | $200,000 | $270,250 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.