Rudzik Excavating Inc: ODOT bid record

Rudzik Excavating Inc submitted 51 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 13 AUG 2026, and was the low bidder on 6 of them (12%). When it was not low, its total sat a median +19% above the low bid.

Owner
Ohio DOT
Low bid volume
$4,172,632
Latest bid
13 AUG 2026
Data through
12 NOV 2026
51Bids
6Low bids
12Win rate, percent
+19%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
20201417%
20218113%
20225120%
2023900%
20245240%
2025300%
20267114%
Rudzik Excavating Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
COL1119%
BEL7114%
JEF600%
MAH6233%
ATB4125%
TRU300%
POR300%
SUM200%
GEA200%
CUY200%
STA11100%
District 12100%
Rudzik Excavating Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5151 (100%)$1.00$1.00
Topsoil659E00300CY4222 (52%)$25.50$45.00
Commercial fertilizer659E20000TON3620 (56%)$500.00$850.00
Water659E35000MGAL2314 (61%)$1.00$1.00
Lime659E31000ACRE3212 (38%)$55.00$150.00
Pavement removed202E23000SY3111 (35%)$12.00$17.00
Seeding and mulching659E10000SY399 (23%)$3.00$2.60
Asphalt concrete for maintaining traffic614E13000CY249 (38%)$196.80$250.00
Law enforcement officer with patrol car for assistance614E11110HR228 (36%)$67.50$80.00
Soil analysis test659E00100EACH267 (27%)$50.00$115.50
Excavation203E10000CY456 (13%)$35.00$27.00
Repair seeding and mulching659E14000SY306 (20%)$1.50$1.25
Rudzik Excavating Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Rudzik Excavating Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
13 AUG 2026268017ATBATB-US 6-22.78 (CULVERT REPLACEMENT)1 of 3$343,274Low, 15% under the second
09 APR 2026260189ATBATB-/TRU Culverts FY2026 (CULVERT REPLACEMENT)2 of 5$593,000+9.0%
29 JAN 2026260054JEFJEF-US 22-06.99 (SLIDE REPAIR)2 of 8$544,820+7.0%
15 JAN 2026260008BELBEL-SR 149-15.10 (SLIDE REPAIR)2 of 4$570,000+2.0%
15 JAN 2026260019JEFJEF-SR 213-04.51 (SLIDE REPAIR)2 of 8$1,518,470+7.0%
15 JAN 2026264000COLCOL-SR 644-07.96 (MISCELLANEOUS)2 of 4$660,049-1.0%
15 JAN 2026268000TRUTRU-IR 80-11.32 Truck Parking (PARKING AREAS)7 of 7$6,370,000+35%
23 OCT 2025250490COLCOL-SR 164-01.66 (CULVERT REPLACEMENT)6 of 9$502,700+5.0%
23 OCT 2025250499JEFJEF-SR 7-30.92 (CULVERT REPLACEMENT)3 of 6$1,782,869+21%
16 JAN 2025250006COLCOL-SR 170-20.03 (CULVERT REPLACEMENT)2 of 10$620,795+3.0%
31 OCT 2024240486COLCOL-SR 172-10.80 (CULVERT REPLACEMENT)2 of 7$365,449+2.0%
12 SEP 2024240419MAHMAH-IR 680-09.30 Noise Walls (NOISE WALLS)5 of 7$4,670,870+17%
21 MAR 2024240199MAHMAH-/POR Culverts FY2024 (CULVERT REPLACEMENT)1 of 4$690,000Low, 3.0% under the second
25 JAN 2024240064PORPOR-/TRU-SR 305/VAR-00.72/VAR (CULVERT REPLACEMENT)4 of 4$2,705,880+25%
11 JAN 2024240018MAHMAH-SR 11-13.30 Noise Wall (NOISE WALLS)1 of 5$1,983,589Low, 4.0% under the second
30 NOV 2023230569JEFJEF-US 22-13.83/14.71 (CULVERT REPLACEMENT)2 of 6$883,769+4.0%
09 NOV 2023230545MAHMAH-IR 76-03.03 Noise Wall (NOISE WALLS)3 of 7$1,269,000+10%
28 SEP 2023230472MAHMAH-SR 170-04.35 (MINOR RECONSTRUCTION)5 of 6$9,130,000+14%
25 MAY 2023230329District 4D04-Culverts FY2023 (East) (CULVERT REPLACEMENT)3 of 5$1,108,795+2.0%
25 MAY 2023230345PORPOR-/STA Culverts FY2023 (CULVERT REPLACEMENT)2 of 6$906,449+18%
11 MAY 2023238003ATBATB-SR 531-13.50/15.85 (SLIDE REPAIR)3 of 7$5,424,000+9.0%
27 APR 2023230272TRUTRU-SR 46-01.05 (MISCELLANEOUS)3 of 5$1,971,770+6.0%
26 JAN 2023230059PORPOR-IR 76-20.05 Slide (SLIDE REPAIR)3 of 5$2,773,300+13%
12 JAN 2023230006BELBEL-SR 9-18.70 (SLIDE REPAIR)5 of 6$363,476+35%
15 DEC 2022220654COLCOL-SR 14-01.42 (CULVERT REPLACEMENT)1 of 6$466,400Low, 3.0% under the second
Rudzik Excavating Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy