ODOT contract 264000 bid tabulation
COL-SR 644-07.96 (MISCELLANEOUS). Let by Ohio DOT on January 15, 2026, COL. 4 bids received; low bid $665,351 by S.T.A.R.T., LLC, +3.6% against the engineer's estimate of $642,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 55
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | S.T.A.R.T., LLC | $665,351 | Low | +4.0% |
| 2 | Rudzik Excavating Inc | $660,049 | -1.0% | +3.0% |
| 3 | Shook Company LLC | $896,700 | +35% | +40% |
| 4 | Bog Construction Inc | $1,092,836 | +64% | +70% |
Engineer's estimate: $642,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S.T.A.R.T., LLC | 2. Rudzik Excavating Inc | 3. Shook Company LLC | 4. Bog Construction Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $12,290 | $17,500 | $25,000 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 859 | $12.66 | $12.50 | $15.00 | $18.00 |
| 3 | Guardrail removed (202E38000) | FT | 680 | $2.00 | $3.60 | $3.00 | $3.00 |
| 4 | Special - fill and plug existing conduit (202E70000) | FT | 84 | $98.89 | $61.25 | $150.00 | $55.00 |
| 5 | Excavation (203E10000) | CY | 845 | $27.17 | $30.00 | $35.00 | $30.00 |
| 6 | Embankment (203E20000) | CY | 2,141 | $31.24 | $49.13 | $40.00 | $40.00 |
| 7 | Subgrade compaction (204E10000) | SY | 1,072 | $4.14 | $3.00 | $2.00 | $5.00 |
| 8 | Proof rolling (204E45000) | HR | 1 | $435.00 | $250.00 | $50.00 | $100.00 |
| 9 | Guardrail, type MGS (606E15050) | FT | 475 | $21.00 | $23.00 | $30.00 | $24.00 |
| 10 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,620.00 | $2,882.00 | $3,000.00 | $2,850.00 |
| 11 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 3 | $1,100.93 | $770.00 | $250.00 | $150.00 |
| 12 | Soil analysis test (659E00100) | EACH | 1 | $168.28 | $50.00 | $50.00 | $100.00 |
| 13 | Topsoil (659E00300) | CY | 90 | $54.11 | $40.00 | $35.00 | $35.00 |
| 14 | Seeding and mulching (659E10000) | SY | 807 | $3.64 | $4.00 | $3.00 | $8.00 |
| 15 | Repair seeding and mulching (659E14000) | SY | 40 | $6.38 | $1.00 | $1.00 | $3.00 |
| 16 | Inter-seeding (659E15000) | SY | 40 | $6.38 | $1.00 | $1.00 | $1.00 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.11 | $2,544.45 | $400.00 | $100.00 | $1,000.00 |
| 18 | Lime (659E31000) | ACRE | 0.17 | $1,067.35 | $5.00 | $100.00 | $500.00 |
| 19 | Water (659E35000) | MGAL | 5 | $2.00 | $0.01 | $1.00 | $1.00 |
| 20 | Erosion control (832E30000) | EACH | 17,041 | $1.00 | $1.00 | $1.00 | $1.00 |
| 21 | Concrete masonry (602E20000) | CY | 0.90 | $4,799.47 | $5,268.00 | $5,000.00 | $2,500.00 |
| 22 | Aggregate drains (605E31100) | FT | 60 | $38.64 | $37.35 | $20.00 | $20.00 |
| 23 | Conduit, bored or jacked, 30" type A, 748.06 (611E96600) | FT | 124 | $918.97 | $895.00 | $1,500.00 | $4,100.00 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 172 | $366.00 | $297.00 | $300.00 | $510.00 |
| 25 | Aggregate base (304E20000) | CY | 179 | $114.19 | $105.00 | $100.00 | $125.00 |
| 26 | Tack coat (407E10000) | GAL | 59 | $3.60 | $3.40 | $3.50 | $10.00 |
| 27 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 34 | $584.00 | $771.00 | $580.00 | $720.00 |
| 28 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 48 | $508.00 | $690.00 | $350.00 | $660.00 |
| 29 | RPM (621E00100) | EACH | 17 | $150.00 | $165.00 | $175.00 | $20.00 |
| 30 | Raised pavement marker removed (621E54000) | EACH | 17 | $22.06 | $35.00 | $25.00 | $50.00 |
| 31 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 8 | $15.00 | $16.50 | $13.00 | $20.00 |
| 32 | Ground mounted support, no. 2 post (630E02100) | FT | 9.50 | $35.00 | $83.00 | $154.00 | $200.00 |
| 33 | Sign, flat sheet (630E80100) | SF | 1 | $100.00 | $687.50 | $50.00 | $200.00 |
| 34 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $10.00 | $50.00 | $100.00 | $200.00 |
| 35 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $10.00 | $50.00 | $100.00 | $200.00 |
| 36 | Edge line, 6" (646E10010) | MI | 0.26 | $13,500 | $16,500 | $8,500.00 | $10,000 |
| 37 | Center line (646E10200) | MI | 0.13 | $25,000 | $31,350 | $8,500.00 | $10,000 |
| 38 | Traffic compacted surface, type C (410E13000) | CY | 35 | $164.67 | $82.00 | $350.00 | $40.00 |
| 39 | Increased barrier delineation (614E11630) | FT | 740 | $1.00 | $1.55 | $2.00 | $3.00 |
| 40 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 6 | $2,156.44 | $2,930.40 | $3,000.00 | $2,500.00 |
| 41 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 14 | $12.56 | $40.00 | $15.00 | $15.00 |
| 42 | Object marker, two way (614E13360) | EACH | 29 | $25.00 | $32.00 | $26.00 | $15.00 |
| 43 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.13 | $4,750.00 | $5,225.00 | $6,100.00 | $8,000.00 |
| 44 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.26 | $2,650.00 | $2,915.00 | $6,100.00 | $8,000.00 |
| 45 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.33 | $10,053 | $12,000 | $10,300 | $7,500.00 |
| 46 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 20 | $12.00 | $13.20 | $7.00 | $25.00 |
| 47 | Roads for maintaining traffic (615E10000) | LS | 1 | $10,053 | $10,000 | $25,000 | $7,500.00 |
| 48 | Pavement for maintaining traffic, class A (615E20000) | SY | 233 | $81.00 | $98.00 | $100.00 | $115.00 |
| 49 | Water (616E10000) | MGAL | 57 | $2.00 | $1.00 | $10.00 | $1.00 |
| 50 | Portable barrier, unanchored (622E41100) | FT | 1,430 | $32.03 | $31.00 | $35.00 | $25.00 |
| 51 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $32.03 | $6,650.00 | $40,000 | $25,000 |
| 52 | Maintaining traffic (614E11000) | LS | 1 | $40,422 | $28,540 | $96,000 | $50,000 |
| 53 | Field office, type B (619E16010) | MNTH | 6 | $3,200.00 | $1,400.00 | $2,000.00 | $500.00 |
| 54 | Construction layout stakes and surveying (623E10000) | LS | 1 | $14,500 | $4,500.00 | $20,000 | $10,000 |
| 55 | Mobilization (624E10000) | LS | 1 | $55,150 | $26,499 | $65,000 | $29,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.