ODOT contract 268017 bid tabulation
ATB-US 6-22.78 (CULVERT REPLACEMENT). Let by Ohio DOT on August 13, 2026, ATB. 3 bids received; low bid $343,274 by Rudzik Excavating Inc, +4.3% against the engineer's estimate of $329,000.
- Owner
- Ohio DOT
- Letting
- 13 AUG 2026
- Pay items
- 43
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rudzik Excavating Inc | $343,274 | Low | +4.0% |
| 2 | Craig Edward Susany Inc | $393,309 | +15% | +20% |
| 3 | S E T Inc | $480,545 | +40% | +46% |
Engineer's estimate: $329,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rudzik Excavating Inc | 2. Craig Edward Susany Inc | 3. S E T Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $8,000.00 | $1,000.00 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 167 | $40.00 | $65.00 | $25.00 |
| 3 | Removal misc.: conduit (202E98200) | FT | 50 | $125.00 | $10.00 | $30.00 |
| 4 | Excavation (203E10000) | CY | 69 | $150.00 | $100.00 | $35.00 |
| 5 | Embankment (203E20000) | CY | 11 | $150.00 | $250.00 | $45.00 |
| 6 | Subgrade compaction (204E10000) | SY | 147 | $5.00 | $3.00 | $4.00 |
| 7 | 4" concrete walk (608E10000) | SF | 250 | $25.00 | $25.00 | $12.00 |
| 8 | Special - as-built construction plans (690E91000) | LS | 1 | $2,000.00 | $100.00 | $1,200.00 |
| 9 | Special - survey control verification (690E98400) | LS | 1 | $2,000.00 | $8,000.00 | $3,200.00 |
| 10 | Topsoil (659E00300) | CY | 73 | $48.00 | $40.00 | $85.00 |
| 11 | Seeding and mulching (659E10000) | SY | 660 | $6.00 | $9.00 | $6.00 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.09 | $500.00 | $1,000.00 | $4,000.00 |
| 13 | Lime (659E31000) | ACRE | 0.14 | $10.00 | $500.00 | $1,800.00 |
| 14 | Water (659E35000) | MGAL | 4 | $0.01 | $1.00 | $80.00 |
| 15 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 |
| 16 | Aggregate drains (605E31100) | FT | 50 | $40.00 | $25.00 | $24.00 |
| 17 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 50 | $100.00 | $100.00 | $115.00 |
| 18 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $1,250.00 | $4,500.00 | $2,500.00 |
| 19 | Pavement planing, asphalt concrete (T=3") (254E01000) | SY | 290 | $24.75 | $52.00 | $24.00 |
| 20 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 30 | $618.00 | $500.00 | $575.00 |
| 21 | Aggregate base (304E20000) | CY | 26 | $140.00 | $250.00 | $115.00 |
| 22 | Non-tracking tack coat (407E20000) | GAL | 45 | $3.50 | $5.00 | $4.00 |
| 23 | Stabilized crushed aggregate (411E10000) | CY | 5 | $145.00 | $250.00 | $135.00 |
| 24 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 38 | $675.00 | $500.00 | $630.00 |
| 25 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 10 | $675.00 | $900.00 | $630.00 |
| 26 | Ground mounted support, no. 2 post (630E02100) | FT | 14 | $66.00 | $90.00 | $65.00 |
| 27 | Sign, flat sheet (630E80100) | SF | 2 | $165.00 | $102.00 | $155.00 |
| 28 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $330.00 | $350.00 | $325.00 |
| 29 | Edge line, 6" (646E10010) | MI | 0.06 | $53,900 | $44,000 | $52,000 |
| 30 | Center line (646E10200) | MI | 0.03 | $60,500 | $44,000 | $58,000 |
| 31 | Structure removed, as per plan (202E11001) | LS | 1 | $15,000 | $20,000 | $35,000 |
| 32 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $7,500.00 | $1,000.00 | $26,000 |
| 33 | Unclassified excavation (503E21300) | LS | 1 | $12,500 | $5,000.00 | $28,000 |
| 34 | Special - structures, installation of stone blocks (530E00200) | LS | 1 | $10,000 | $10,000 | $12,000 |
| 35 | Special - structures, removal of asbestos containi (530E01300) | FT | 20 | $200.00 | $500.00 | $750.00 |
| 36 | Riprap, type D (601E11000) | SY | 19 | $500.00 | $400.00 | $275.00 |
| 37 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 49 | $240.00 | $190.00 | $200.00 |
| 38 | Concrete masonry (602E20000) | CY | 35 | $910.00 | $1,000.00 | $1,600.00 |
| 39 | 66" conduit, type A, 707.01 or 707.02 (aluminized) (611E25000) | FT | 122 | $595.00 | $1,000.00 | $850.00 |
| 40 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $12,000 | $8,000.00 |
| 41 | Maintaining traffic (614E11000) | LS | 1 | $10,626 | $10,000 | $15,000 |
| 42 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $10,000 | $12,000 |
| 43 | Mobilization (624E10000) | LS | 1 | $16,000 | $10,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.