Tucson Inc: ODOT bid record
Tucson Inc submitted 53 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 JAN 2026, and was the low bidder on 14 of them (26%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $7,664,730
- Latest bid
- 29 JAN 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 15 | 3 | 20% |
| 2021 | 12 | 4 | 33% |
| 2022 | 7 | 2 | 29% |
| 2023 | 10 | 3 | 30% |
| 2024 | 3 | 0 | 0% |
| 2025 | 5 | 1 | 20% |
| 2026 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 7 | 0 | 0% |
| HAS | 6 | 4 | 67% |
| MUS | 6 | 1 | 17% |
| TUS | 5 | 1 | 20% |
| JEF | 5 | 2 | 40% |
| HOL | 4 | 0 | 0% |
| COL | 2 | 1 | 50% |
| NOB | 2 | 1 | 50% |
| CAR | 2 | 2 | 100% |
| STA | 2 | 1 | 50% |
| GUE | 2 | 0 | 0% |
| CUY | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 54 | 54 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 44 | 31 (70%) | $1.00 | $1.00 |
| Embankment | 203E20000 | CY | 47 | 15 (32%) | $20.00 | $25.00 |
| Subgrade compaction | 204E10000 | SY | 40 | 10 (25%) | $2.00 | $3.00 |
| Repair seeding and mulching | 659E14000 | SY | 29 | 10 (34%) | $1.00 | $1.25 |
| Lime | 659E31000 | ACRE | 45 | 9 (20%) | $210.00 | $150.00 |
| Pavement removed | 202E23000 | SY | 31 | 9 (29%) | $15.00 | $17.00 |
| Soil analysis test | 659E00100 | EACH | 24 | 9 (38%) | $75.00 | $115.50 |
| Excavation | 203E10000 | CY | 47 | 7 (15%) | $24.75 | $27.00 |
| Aggregate base | 304E20000 | CY | 41 | 6 (15%) | $100.00 | $90.00 |
| Inter-seeding | 659E15000 | SY | 12 | 6 (50%) | $1.00 | $1.00 |
| Topsoil | 659E00300 | CY | 31 | 4 (13%) | $40.00 | $45.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 42 | 16 of 42 |
| Eclipse Co LLC | 34 | 5 of 34 |
| Ohio-West Virginia Excavating Co | 32 | 17 of 32 |
| Stanley Miller Construction Company | 13 | 4 of 13 |
| Alan Stone Co Inc | 12 | 1 of 12 |
| R C Construction Company and Son Inc | 12 | 0 of 12 |
| NLS Paving, Inc | 12 | 3 of 12 |
| Buds Inc | 11 | 5 of 11 |
| Lockhart Concrete Co | 9 | 2 of 9 |
| Rudzik Excavating Inc | 9 | 0 of 9 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JAN 2026 | 260054 | JEF | JEF-US 22-06.99 (SLIDE REPAIR) | 1 of 8 | $507,909 | Low, 7.0% under the second |
| 31 JUL 2025 | 250358 | HAS | HAS-SR 149-01.17 (CULVERT REPLACEMENT) | 1 of 5 | $711,194 | Low, 0.0% under the second |
| 08 MAY 2025 | 250254 | JEF | JEF-SR 43-08.40 (INTERSECTION) | 4 of 4 | $1,538,958 | +26% |
| 08 MAY 2025 | 250269 | JEF | JEF-SR 150-03.544 (INTERSECTION) | 3 of 5 | $630,662 | +26% |
| 24 APR 2025 | 250213 | BEL | BEL-SR 149-12.20 (SLIDE REPAIR) | 4 of 5 | $175,310 | +47% |
| 10 APR 2025 | 250188 | BEL | BEL-SR 148-08.45 (SLIDE REPAIR) | 7 of 8 | $654,178 | +34% |
| 05 DEC 2024 | 240569 | MUS | MUS-SR 376-05.09 (SLIDE REPAIR) | 6 of 7 | $622,579 | +15% |
| 31 OCT 2024 | 240502 | MUS | MUS-SR 146-29.36 (SLIDE REPAIR) | 2 of 8 | $696,760 | +1.0% |
| 08 FEB 2024 | 240108 | TUS | TUS-Towpath Trail Improvements (BIKEWAYS) | 10 of 14 | $1,098,975 | +53% |
| 26 OCT 2023 | 230520 | HAS | HAS-SR 342-03.88 (SLIDE REPAIR) | 1 of 6 | $315,749 | Low, 52% under the second |
| 28 SEP 2023 | 230476 | MUS | MUS-IR 70-07.36 (SLIDE REPAIR) | 1 of 7 | $481,638 | Low, 0.0% under the second |
| 27 JUL 2023 | 230411 | TUS | TUS-Trenton Avenue (MINOR RECONSTRUCTION) | 1 of 2 | $752,706 | Low, 23% under the second |
| 11 MAY 2023 | 230314 | JEF | JEF-SR 151-12.45 (INTERSECTION) | 2 of 4 | $636,977 | +10% |
| 30 MAR 2023 | 230194 | RIC | RIC-US 30-18.10 (MISCELLANEOUS) | 2 of 2 | $799,254 | +15% |
| 09 FEB 2023 | 230089 | GUE | GUE-SR 265-05.68 (SLIDE REPAIR) | 3 of 9 | $146,574 | +18% |
| 26 JAN 2023 | 230056 | MUS | MUS-TR 49-00.56 (Multiuse Path) (BIKEWAYS) | 3 of 6 | $738,691 | +16% |
| 26 JAN 2023 | 230062 | TUS | TUS-SR 800-03.82 (DEMOLITION) | 2 of 7 | $679,034 | +24% |
| 12 JAN 2023 | 230006 | BEL | BEL-SR 9-18.70 (SLIDE REPAIR) | 2 of 6 | $297,779 | +11% |
| 12 JAN 2023 | 230009 | CUY | CUY-IR 480-18.26 Slope (SLIDE REPAIR) | 3 of 5 | $354,279 | +30% |
| 01 DEC 2022 | 220642 | MUS | MUS-SR 146/SR 340-31.42/03.26 (PART 1 AND PART 2) (SLIDE REPAIR) | 4 of 6 | $872,969 | +28% |
| 29 SEP 2022 | 220533 | CUY | CUY-US 422-18.74/VAR Slide (SLIDE REPAIR) | 2 of 11 | $878,407 | +4.0% |
| 15 SEP 2022 | 220511 | HAS | HAS-SR 646-06.33 (MINOR RECONSTRUCTION) | 1 of 4 | $683,729 | Low, 2.0% under the second |
| 11 AUG 2022 | 220468 | MUS | MUS-IR 70-25.90 (SLIDE REPAIR) | 9 of 10 | $846,907 | +32% |
| 28 APR 2022 | 220262 | BEL | BEL-CR 56-33.21/34.26 (SLIDE REPAIR) | 4 of 7 | $496,897 | +16% |
| 27 JAN 2022 | 220060 | STA | STA-SR 43-09.08 Drainage (CULVERT REPLACEMENT) | 1 of 7 | $335,647 | Low, 8.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.