Tucson Inc: ODOT bid record

Tucson Inc submitted 53 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 JAN 2026, and was the low bidder on 14 of them (26%). When it was not low, its total sat a median +20% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,664,730
Latest bid
29 JAN 2026
Data through
12 NOV 2026
53Bids
14Low bids
26Win rate, percent
+20%Median gap to the low bid when not low, 39 bids

By year

YearBidsLow bidsWin rate
202015320%
202112433%
20227229%
202310330%
2024300%
20255120%
202611100%
Tucson Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL700%
HAS6467%
MUS6117%
TUS5120%
JEF5240%
HOL400%
COL2150%
NOB2150%
CAR22100%
STA2150%
GUE200%
CUY200%
Tucson Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5454 (100%)$1.00$1.00
Water659E35000MGAL4431 (70%)$1.00$1.00
Embankment203E20000CY4715 (32%)$20.00$25.00
Subgrade compaction204E10000SY4010 (25%)$2.00$3.00
Repair seeding and mulching659E14000SY2910 (34%)$1.00$1.25
Lime659E31000ACRE459 (20%)$210.00$150.00
Pavement removed202E23000SY319 (29%)$15.00$17.00
Soil analysis test659E00100EACH249 (38%)$75.00$115.50
Excavation203E10000CY477 (15%)$24.75$27.00
Aggregate base304E20000CY416 (15%)$100.00$90.00
Inter-seeding659E15000SY126 (50%)$1.00$1.00
Topsoil659E00300CY314 (13%)$40.00$45.00
Tucson Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Tucson Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 JAN 2026260054JEFJEF-US 22-06.99 (SLIDE REPAIR)1 of 8$507,909Low, 7.0% under the second
31 JUL 2025250358HASHAS-SR 149-01.17 (CULVERT REPLACEMENT)1 of 5$711,194Low, 0.0% under the second
08 MAY 2025250254JEFJEF-SR 43-08.40 (INTERSECTION)4 of 4$1,538,958+26%
08 MAY 2025250269JEFJEF-SR 150-03.544 (INTERSECTION)3 of 5$630,662+26%
24 APR 2025250213BELBEL-SR 149-12.20 (SLIDE REPAIR)4 of 5$175,310+47%
10 APR 2025250188BELBEL-SR 148-08.45 (SLIDE REPAIR)7 of 8$654,178+34%
05 DEC 2024240569MUSMUS-SR 376-05.09 (SLIDE REPAIR)6 of 7$622,579+15%
31 OCT 2024240502MUSMUS-SR 146-29.36 (SLIDE REPAIR)2 of 8$696,760+1.0%
08 FEB 2024240108TUSTUS-Towpath Trail Improvements (BIKEWAYS)10 of 14$1,098,975+53%
26 OCT 2023230520HASHAS-SR 342-03.88 (SLIDE REPAIR)1 of 6$315,749Low, 52% under the second
28 SEP 2023230476MUSMUS-IR 70-07.36 (SLIDE REPAIR)1 of 7$481,638Low, 0.0% under the second
27 JUL 2023230411TUSTUS-Trenton Avenue (MINOR RECONSTRUCTION)1 of 2$752,706Low, 23% under the second
11 MAY 2023230314JEFJEF-SR 151-12.45 (INTERSECTION)2 of 4$636,977+10%
30 MAR 2023230194RICRIC-US 30-18.10 (MISCELLANEOUS)2 of 2$799,254+15%
09 FEB 2023230089GUEGUE-SR 265-05.68 (SLIDE REPAIR)3 of 9$146,574+18%
26 JAN 2023230056MUSMUS-TR 49-00.56 (Multiuse Path) (BIKEWAYS)3 of 6$738,691+16%
26 JAN 2023230062TUSTUS-SR 800-03.82 (DEMOLITION)2 of 7$679,034+24%
12 JAN 2023230006BELBEL-SR 9-18.70 (SLIDE REPAIR)2 of 6$297,779+11%
12 JAN 2023230009CUYCUY-IR 480-18.26 Slope (SLIDE REPAIR)3 of 5$354,279+30%
01 DEC 2022220642MUSMUS-SR 146/SR 340-31.42/03.26 (PART 1 AND PART 2) (SLIDE REPAIR)4 of 6$872,969+28%
29 SEP 2022220533CUYCUY-US 422-18.74/VAR Slide (SLIDE REPAIR)2 of 11$878,407+4.0%
15 SEP 2022220511HASHAS-SR 646-06.33 (MINOR RECONSTRUCTION)1 of 4$683,729Low, 2.0% under the second
11 AUG 2022220468MUSMUS-IR 70-25.90 (SLIDE REPAIR)9 of 10$846,907+32%
28 APR 2022220262BELBEL-CR 56-33.21/34.26 (SLIDE REPAIR)4 of 7$496,897+16%
27 JAN 2022220060STASTA-SR 43-09.08 Drainage (CULVERT REPLACEMENT)1 of 7$335,647Low, 8.0% under the second
Tucson Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.