ODOT contract 250269 bid tabulation

JEF-SR 150-03.544 (INTERSECTION). Let by Ohio DOT on May 8, 2025, JEF. 5 bids received; low bid $498,957 by LMS Construction Inc, -4.0% against the engineer's estimate of $520,000.

Owner
Ohio DOT
Letting
08 MAY 2025
Pay items
70
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1LMS Construction Inc$498,957Low-4.0%
2Ohio-West Virginia Excavating Co$619,022+24%+19%
3Tucson Inc$630,662+26%+21%
4NLS Paving, Inc$646,155+30%+24%
5Shelly & Sands Inc$657,944+32%+27%
ODOT contract 250269: bids by rank

Engineer's estimate: $520,000.

Bid tabulation

LinePay itemUnitQuantity1. LMS Construction Inc2. Ohio-West Virginia Excavating Co3. Tucson Inc4. NLS Paving, Inc5. Shelly & Sands Inc
1Clearing and grubbing (201E11000)LS1$1,000.00$3,600.00$10,120$1,000.00$900.00
2Pavement removed (202E23000)SY1,362$10.00$27.00$10.00$40.00$21.00
3Walk removed, as per plan (202E30001)SF804$5.00$5.00$3.50$9.00$1.50
4Curb removed (202E32000)FT65$12.00$27.00$18.15$13.50$9.00
5Pipe removed, 24" and under (202E35100)FT128$10.00$95.00$11.10$45.00$42.00
6Catch basin removed (202E58100)EACH3$800.00$1,700.00$380.00$1,625.00$450.00
7Removal misc.: foundation (202E98000)LS1$800.00$1,800.00$1,525.00$950.00$2,250.00
8Removal misc.: sign support on building (202E98000)LS1$800.00$1,500.00$2,000.00$450.00$575.00
9Excavation (203E10000)CY252$35.00$40.00$57.00$48.25$47.00
10Embankment (203E20000)CY112$35.00$73.00$36.50$100.00$20.00
11Roadway, misc.: removal and reset of decorative RO (203E98100)SY47$10.00$90.00$104.00$110.00$60.00
12Subgrade compaction (204E10000)SY1,694$4.00$1.00$3.00$0.50$8.00
13Proof rolling (204E45000)HR1$300.00$200.00$178.00$250.00$250.00
146" concrete walk (608E13000)SF985$20.00$20.00$13.65$17.50$14.00
15Curb ramp (608E52000)SF244$25.00$40.00$32.15$44.00$45.00
16Special - work involving petroleum contaminated soil (690E65016)TON290$25.00$100.00$124.00$110.00$128.00
17Special - work involving regulated water (690E65024)GAL50$10.00$33.00$68.00$40.00$58.00
18Seeding and mulching, class 1 (659E00500)SY182$5.00$6.00$17.00$8.00$15.50
19Commercial fertilizer (659E20000)TON0.02$20,000$1,475.00$2,430.00$16,500$850.00
20Lime (659E31000)ACRE0.04$10,000$180.00$2,500.00$4,000.00$50.00
21Water (659E35000)MGAL5$5.00$1.00$1.00$275.00$1.00
22Erosion control (832E30000)EACH5,000$1.00$1.00$1.00$1.00$1.00
236" shallow pipe underdrains (605E11100)FT680$25.00$26.00$36.00$35.00$25.00
2412" conduit, type C (611E04600)FT43$80.00$140.00$178.00$104.00$150.00
2515" conduit, type B (611E05900)FT8$200.00$516.00$178.00$230.00$200.00
2618" conduit, type B (611E07400)FT62$150.00$265.00$151.00$105.00$200.00
27Catch basin, no. 3 (611E98150)EACH1$6,000.00$4,700.00$4,650.00$4,425.00$5,300.00
28Catch basin, no. 2-2B (611E98470)EACH2$3,500.00$2,960.00$3,325.00$4,150.00$3,100.00
29Manhole adjusted to grade (611E99654)EACH1$600.00$1,490.00$1,008.00$950.00$100.00
30Full depth pavement sawing (252E01500)FT203$5.00$15.00$8.85$10.50$8.00
31Asphalt concrete base, PG64-22, (449) (301E56000)CY287$235.00$259.00$292.00$250.00$265.00
32Asphalt concrete base, PG64-22, (449), (driveways) (301E56100)CY3$950.00$1,105.00$991.00$450.00$900.00
33Aggregate base (304E20000)CY252$125.00$161.00$128.00$145.00$145.00
34Non-tracking tack coat (407E20000)GAL247$3.00$9.00$4.00$4.00$3.50
35Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY7$950.00$765.00$1,050.00$575.00$950.00
36Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY46$600.00$337.00$551.00$350.00$500.00
37Asphalt concrete intermediate course, type 2, (449) (441E70300)CY64$450.00$305.00$606.00$390.00$550.00
38Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY1$2,000.00$3,772.00$1,000.00$1,500.00$900.00
396" non-reinforced concrete pavement, class QC 1P (452E10010)SY27$150.00$360.00$109.00$300.00$130.00
408" non-reinforced concrete pavement, class QC 1P (452E12010)SY77$140.00$221.00$124.00$170.00$145.00
41Curb, type 6 (609E26000)FT168$50.00$75.00$42.00$66.00$63.00
42Valve box adjusted to grade (638E10800)EACH5$300.00$675.00$825.00$585.00$1,045.00
43Ground mounted support, no. 3 post (630E03100)FT26$48.00$6.00$52.25$50.00$48.00
44Sign post reflector (630E08600)EACH2$45.00$14.00$150.00$50.00$45.00
45Sign, flat sheet (630E80100)SF26$52.00$25.00$57.00$55.00$52.00
46Removal of ground mounted sign and disposal (630E84900)EACH2$15.00$60.00$18.00$230.00$15.00
47Removal of ground mounted sign and reerection (630E85100)EACH1$85.00$236.00$145.00$460.00$85.00
48Removal of ground mounted post support and disposal (630E86002)EACH2$20.00$180.00$108.25$230.00$20.00
49Edge line, 6" (646E10010)MI0.12$15,000$19,260$32,000$17,400$16,320
50Center line (646E10200)MI0.06$25,000$34,000$42,650$30,800$28,965
51Dotted line, 6" (646E20504)FT21$6.00$6.00$4.60$5.50$5.00
52Traffic compacted surface, type A (410E10000)CY50$82.53$198.00$115.00$190.00$95.00
53Temporary asphalt concrete walk (608E21200)SF735$20.00$13.00$6.00$10.50$10.50
54Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH3$2,925.00$2,450.00$2,755.00$3,100.00$2,925.00
55Detour signing (614E12420)LS1$7,500.00$8,900.00$8,300.00$8,000.00$8,200.00
56Asphalt concrete for maintaining traffic (614E13000)CY50$100.00$200.00$372.00$350.00$500.00
57Barrier reflector, type 1, one-way (614E13310)EACH9$50.00$55.00$55.50$50.00$10.00
58Object marker, one way (614E13350)EACH9$50.00$55.00$55.50$50.00$17.00
59Portable changeable message sign, as per plan (614E18601)SNMT9$1,500.00$1,800.00$1,660.00$1,600.00$1,500.00
60Work zone edge line, class I, 6", 642 paint (614E22110)MI0.57$3,325.00$3,900.00$3,660.00$3,600.00$3,325.00
61Work zone edge line, class I, 6", 740.06, type I (614E22210)MI0.57$9,750.00$11,500$10,730$11,000$9,750.00
62Roads for maintaining traffic (615E10000)LS1$3,000.00$7,000.00$12,300$6,700.00$13,000
63Pavement for maintaining traffic, class A (615E20000)SY142$100.00$145.00$132.00$100.00$88.00
64Water (616E10000)MGAL2$5.00$1.00$5.00$185.00$60.00
65Portable barrier, unanchored (622E41100)FT482$40.00$40.00$54.50$45.00$38.00
66Premium for contract performance bond and for payment bond (103E05000)LS1$20,000$8,500.00$9,800.00$3,000.00$4,725.39
67Maintaining traffic (614E11000)LS1$24,000$17,000$33,500$20,000$47,550
68Field office, type B (619E16010)MNTH3$1,400.00$3,800.00$2,375.00$3,000.00$7,900.00
69Construction layout stakes and surveying (623E10000)LS1$2,500.00$4,000.00$16,300$27,000$18,500
70Mobilization (624E10000)LS1$20,000$29,500$22,600$40,000$30,000
ODOT contract 250269: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy