ODOT letting results, December 5, 2024
26 contracts let by Ohio DOT on December 5, 2024, $106,161,587 in low bids, a median of 3 bidders per contract. On the 26 with an engineer's estimate, the low bid came in under it 16 times; median low bid -8.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 26
- Low bids, total
- $106,161,587
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 240511 | CUY-IR 271-09.28 Safety (PART 1 AND PART 2) (INTERCHANGE) | CUY | 3 | Shelly Company | $15,863,127 | $16,195,070 | +2.0% | +2.0% | ODOT |
| 240560 | ROS-US 23-10.97 (FOUR LANE RESURFACING) | ROS | 2 | Shelly & Sands Inc | $14,428,990 | $15,265,509 | +6.0% | +6.0% | ODOT |
| 240557 | MED-IR 71-15.79 (FOUR LANE RESURFACING) | MED | 3 | Kokosing Construction Company Inc | $11,722,819 | $12,499,196 | +7.0% | -9.0% | ODOT |
| 240546 | CLI-/GRE-IR 71-10.57/00.00 (FOUR LANE RESURFACING) | CLI | 1 | John R Jurgensen Company | $7,692,255 | +19% | ODOT | ||
| 240561 | SUM-SR 8-02.91 (FOUR LANE RESURFACING) | SUM | 4 | Shelly & Sands Inc | $7,594,131 | $7,638,244 | +1.0% | -3.0% | ODOT |
| 240545 | CLA-IR 70-00.51/20.86 (MICROSURFACING) | CLA | 2 | Strawser Construction Inc | $5,527,958 | $7,277,049 | +32% | +7.0% | ODOT |
| 240552 | FUL-US 20A/US 127/SR 109-00.00/02.38/08.11 (TWO LANE RESURFACING) | FUL | 1 | Gerken Paving Inc | $4,783,265 | -7.0% | ODOT | ||
| 240556 | KNO-SR 13-15.98 (FOUR LANE RESURFACING) | KNO | 2 | Shelly & Sands Inc | $4,733,682 | $5,502,490 | +16% | -8.0% | ODOT |
| 240562 | TUS-US 250-21.32 (MINOR RECONSTRUCTION) | TUS | 1 | Shelly & Sands Inc | $4,669,866 | +22% | ODOT | ||
| 240558 | MEG-SR 7-18.62 ATH-SR 7-00.00 (TWO LANE RESURFACING) | MEG | 1 | Shelly Company | $4,199,557 | +8.0% | ODOT | ||
| 240563 | WAR-SR 350-08.73 (BRIDGE REPLACEMENT (1 BRIDGE)) | WAR | 7 | Eagle Bridge Co | $4,042,239 | $4,122,504 | +2.0% | +1.0% | ODOT |
| 240547 | CRA-/RIC-SR 61/SR 181-VAR (TWO LANE RESURFACING) | CRA | 2 | Kokosing Construction Company Inc | $2,746,636 | $2,944,661 | +7.0% | -10% | ODOT |
| 240542 | ATH-CR 33/CR 178-01.94/00.00 (TWO LANE RESURFACING) | ATH | 3 | Shelly & Sands Inc | $2,509,632 | $2,795,200 | +11% | -10% | ODOT |
| 240541 | ADA-SR 348-00.00 (TWO LANE RESURFACING) | ADA | 4 | Brown County Asphalt Inc | $2,385,286 | $2,588,563 | +9.0% | -21% | ODOT |
| 240551 | FRA-IR 270-00.55 (SPOT PATCHING / PAVEMENT REPAIR) | FRA | 3 | Shelly & Sands Inc | $2,080,962 | $2,444,791 | +17% | -18% | ODOT |
| 240550 | D07-BH-FY25 (D) (BRIDGE REPAIR) | District 7 | 6 | BCC Ohio Inc | $2,065,496 | $2,308,313 | +12% | -21% | ODOT |
| 240554 | HAM-Inverts FY2025 (CULVERT REPLACEMENT) | HAM | 3 | Sunesis Construction Co | $2,034,135 | $2,251,818 | +11% | +52% | ODOT |
| 240544 | BUT-SR 122-02.70 (INTERSECTION) | BUT | 7 | Kelchner Inc | $1,780,170 | $1,785,196 | 0.0% | -14% | ODOT |
| 240567 | LIC-Flat Sheet Signs 2025 (SIGNING) | LIC | 2 | M P Dory Co | $1,329,682 | $1,635,575 | +23% | -12% | ODOT |
| 240555 | HOC-Main Street Sidewalk Phase 2 (MISCELLANEOUS) | HOC | 4 | Axis Civil Construction LLC | $1,294,470 | $1,312,805 | +1.0% | -18% | ODOT |
| 240564 | WAS-SR 145-02.09 (CULVERT REPLACEMENT) | WAS | 2 | Midwest Mole Inc | $882,668 | $1,738,569 | +97% | +24% | ODOT |
| 240569 | MUS-SR 376-05.09 (SLIDE REPAIR) | MUS | 7 | J & J Bridge Company Inc | $539,864 | $576,889 | +7.0% | -18% | ODOT |
| 240559 | MIA-SR 55-04.89 (BRIDGE PAINTING) | MIA | 7 | Elite Contractors Inc | $477,351 | $520,293 | +9.0% | -6.0% | ODOT |
| 240566 | D09-PM FY2025 (A) (PAVEMENT MARKING) | District 9 | 3 | A & A Safety Inc | $453,174 | $468,000 | +3.0% | +2.0% | ODOT |
| 240565 | D05-RPM FY2025 (RAISED PAVEMENT MARKERS) | District 5 | 2 | W L Markers Inc | $270,103 | $278,623 | +3.0% | -10% | ODOT |
| 240568 | MIA-Charleston Falls & Big Woods (CHIP SEAL) | MIA | 2 | Henry W Bergman Inc | $54,067 | $58,792 | +9.0% | -18% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.