ODOT letting results, November 14, 2024
31 contracts let by Ohio DOT on November 14, 2024, $69,609,136 in low bids, a median of 3 bidders per contract. On the 31 with an engineer's estimate, the low bid came in under it 23 times; median low bid -8.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 31
- Low bids, total
- $69,609,136
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 240522 | ERI-SR 2-00.00 (FOUR LANE RESURFACING) | ERI | 2 | Erie Blacktop Inc | $7,626,194 | $7,795,832 | +2.0% | -7.0% | ODOT |
| 240517 | CUY-SR 176-13.34/VAR Deck (BRIDGE REPAIR) | CUY | 1 | Great Lakes Construction Co | $7,471,501 | +23% | ODOT | ||
| 240531 | NOB-IR 77-00.00 WAS-IR 77-13.19 NB (FOUR LANE RESURFACING) | NOB | 2 | Shelly & Sands Inc | $5,822,081 | $6,926,246 | +19% | -6.0% | ODOT |
| 240528 | JEF-SR 150/VAR-03.43/VAR (TWO LANE RESURFACING) | JEF | 3 | Shelly & Sands Inc | $5,385,189 | $5,691,081 | +6.0% | -4.0% | ODOT |
| 240510 | CUY-SR 14-12.12E (PART 1 AND PART 2) (BRIDGE REPLACEMENT (1 BRIDGE)) | CUY | 2 | Black Horse Bridge Construction Inc | $4,861,699 | $5,282,264 | +9.0% | -5.0% | ODOT |
| 240513 | ASD-SR 95/SR 511-06.49/18.329 (TWO LANE RESURFACING) | ASD | 2 | Shelly & Sands Inc | $3,926,992 | $3,961,385 | +1.0% | -13% | ODOT |
| 240514 | BEL-Barnesville Trail (BIKEWAYS) | BEL | 4 | Cast & Baker Corporation | $3,270,190 | $3,324,389 | +2.0% | +9.0% | ODOT |
| 240526 | HIG-SR 73/SR 785-10.72/00.00 (TWO LANE RESURFACING) | HIG | 4 | Brown County Asphalt Inc | $3,188,281 | $3,297,899 | +3.0% | -14% | ODOT |
| 240538 | D12-PM FY2025 (PAVEMENT MARKING) | District 12 | 2 | Oglesby Construction Inc | $2,797,525 | $3,070,000 | +10% | -10% | ODOT |
| 240532 | NOB-IR 77-06.40 (SPOT PATCHING / PAVEMENT REPAIR) | NOB | 6 | Shelly & Sands Inc | $2,776,000 | $3,775,000 | +36% | -27% | ODOT |
| 240535 | SUM-SR 82-00.14/08.04 (TWO LANE RESURFACING) | SUM | 5 | Ronyak Paving Inc | $2,736,000 | $2,931,703 | +7.0% | -8.0% | ODOT |
| 240523 | FAY-US 35/SR 435-00.00/00.00 (FOUR LANE RESURFACING) | FAY | 3 | John R Jurgensen Company | $2,526,017 | $3,068,852 | +21% | -11% | ODOT |
| 240493 | GEA-US 322-19.41 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | GEA | 4 | Marucci & Gaffney Excavating Co | $2,068,325 | $2,369,237 | +15% | -13% | ODOT |
| 240533 | PAU-US/DEF US 127 11.78/0.00 (MICROSURFACING) | PAU | 2 | Pavement Maintenance Systems LLC | $1,796,478 | $1,922,496 | +7.0% | -1.0% | ODOT |
| 240518 | D01-BP FY25 (BRIDGE PAINTING) | District 1 | 9 | Apbn Inc | $1,778,500 | $1,976,283 | +11% | +4.0% | ODOT |
| 240492 | GEA-SR 87-12.13 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | GEA | 5 | Matt Winters Excavation LLC | $1,513,228 | $1,631,515 | +8.0% | -13% | ODOT |
| 240540 | LOG-SR 273-00.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | LOG | 3 | George J Igel & Co Inc | $1,109,012 | $1,176,757 | +6.0% | -4.0% | ODOT |
| 240520 | D04-CHIP FY2025 (CHIP SEAL) | District 4 | 2 | Geauga Highway Co | $991,283 | $1,010,237 | +2.0% | -3.0% | ODOT |
| 240515 | CLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE)) | CLA | 12 | Buds Inc | $938,820 | $959,960 | +2.0% | -26% | ODOT |
| 240537 | D05-CS FY2025 (CRACK SEALING) | District 5 | 3 of 4 | Scodeller Construction Inc | $839,009 | +3.0% | ODOT | ||
| 240516 | COL-SR-SR 9/VAR-14.72/VAR (TWO LANE RESURFACING) | COL | 5 | Shelly & Sands Inc | $810,683 | $830,370 | +2.0% | -13% | ODOT |
| 244024 | MER-BH FY25 (BRIDGE REPAIR) | MER | 1 | BCC Ohio Inc | $769,176 | -15% | ODOT | ||
| 240539 | FAI-US 33-12.53 (INTERSECTION) | FAI | 5 | Axis Civil Construction LLC | $756,229 | $768,280 | +2.0% | -8.0% | ODOT |
| 240524 | FRA-IR 70-07.38 (CULVERT REPLACEMENT) | FRA | 3 | Complete General Construction Company | $710,251 | $734,128 | +3.0% | -17% | ODOT |
| 244025 | WIL-US 6-11.07 Bridge Repl. (CULVERT REPLACEMENT) | WIL | 5 | Vernon Nagel Inc | $684,423 | $687,764 | 0.0% | +1.0% | ODOT |
| 240529 | LAW-SR 93-01.90-Safety (INTERSECTION) | LAW | 3 | Shelly Company | $577,825 | $693,106 | +20% | +5.0% | ODOT |
| 240521 | D10-Chip Seal FY 2025 North (CHIP SEAL) | District 10 | 1 | Shelly Company | $469,317 | -10% | ODOT | ||
| 240525 | HAM-Culverts FY25 (CULVERT REPLACEMENT) | HAM | 5 | Rack & Ballauer Excavating Co Inc | $442,497 | $491,597 | +11% | +48% | ODOT |
| 240527 | HOC-US 33-10.12 (CULVERT REPLACEMENT) | HOC | 7 | Axis Civil Construction LLC | $394,139 | $436,624 | +11% | -20% | ODOT |
| 240536 | D03-LG TSG RM FY2025 (SIGNALIZATION) | District 3 | 2 | Asplundh Construction LLC | $349,940 | $353,675 | +1.0% | +10% | ODOT |
| 240534 | ROS-GR-FY2025(C.R.) (GUARDRAIL REBUILDING) | ROS | 3 | PDK Construction Inc | $222,333 | $249,325 | +12% | -29% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.