ODOT contract 250529 bid tabulation
MAH-Afton Ave (SRTS) (SIDEWALK). Let by Ohio DOT on November 13, 2025, MAH. 6 bids received; low bid $243,318 by Foust Construction Inc, -26% against the engineer's estimate of $328,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 35
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Foust Construction Inc | $243,318 | Low | -26% |
| 2 | Daniel A Terreri & Sons Inc | $268,800 | +10% | -18% |
| 3 | Parella-Pannunzio Inc | $319,656 | +31% | -3.0% |
| 4 | Stanley Miller Construction Company | $324,843 | +34% | -1.0% |
| 5 | S.T.A.R.T., LLC | $336,452 | +38% | +3.0% |
| 6 | Tri-Mor Corp | $339,318 | +39% | +3.0% |
Engineer's estimate: $328,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Foust Construction Inc | 2. Daniel A Terreri & Sons Inc | 3. Parella-Pannunzio Inc | 4. Stanley Miller Construction Company | 5. S.T.A.R.T., LLC | 6. Tri-Mor Corp |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,000.00 | $10,000 | $12,000 | $6,000.00 | $13,000 | $15,000 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 651 | $20.00 | $18.00 | $20.00 | $21.00 | $58.56 | $26.00 |
| 3 | Walk removed (202E30000) | SF | 80 | $10.00 | $5.00 | $10.00 | $5.00 | $19.74 | $5.00 |
| 4 | Curb removed (202E32000) | FT | 36 | $20.00 | $20.00 | $50.00 | $5.00 | $29.97 | $20.00 |
| 5 | Excavation (203E10000) | CY | 172 | $50.00 | $50.00 | $190.00 | $88.00 | $44.80 | $30.00 |
| 6 | Embankment (203E20000) | CY | 14 | $50.00 | $100.00 | $100.00 | $97.00 | $74.07 | $40.00 |
| 7 | Subgrade compaction (204E10000) | SY | 651 | $1.00 | $2.00 | $3.00 | $2.00 | $4.18 | $1.00 |
| 8 | Full depth pavement sawing (252E01500) | FT | 995 | $3.00 | $3.00 | $7.00 | $4.00 | $4.62 | $3.00 |
| 9 | 4" concrete walk (608E10000) | SF | 6,398 | $8.50 | $8.00 | $9.50 | $9.35 | $8.50 | $12.00 |
| 10 | Curb ramp (608E52000) | SF | 331 | $20.00 | $20.00 | $24.00 | $23.00 | $30.94 | $25.00 |
| 11 | Monument assembly reconstructed to grade (623E39600) | EACH | 2 | $2,000.00 | $400.00 | $1,200.00 | $1,000.00 | $748.00 | $1,000.00 |
| 12 | Special - as-built construction plans (690E91000) | LS | 1 | $5,000.00 | $1,000.00 | $3,000.00 | $4,000.00 | $2,500.00 | $3,900.00 |
| 13 | Special - survey control verification (690E98400) | LS | 1 | $2,000.00 | $2,000.00 | $500.00 | $4,000.00 | $1,200.00 | $15,000 |
| 14 | Soil analysis test (659E00100) | EACH | 2 | $300.00 | $200.00 | $200.00 | $150.00 | $84.14 | $400.00 |
| 15 | Topsoil (659E00300) | CY | 154 | $55.00 | $80.00 | $50.00 | $62.50 | $91.87 | $95.00 |
| 16 | Seeding and mulching (659E10000) | SY | 1,380 | $3.00 | $5.00 | $5.00 | $5.00 | $3.51 | $7.00 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.20 | $400.00 | $1,000.00 | $200.00 | $800.00 | $1,249.00 | $4,000.00 |
| 18 | Lime (659E31000) | ACRE | 0.30 | $300.00 | $1,000.00 | $200.00 | $100.00 | $870.00 | $1,200.00 |
| 19 | Water (659E35000) | MGAL | 18 | $2.00 | $50.00 | $1.00 | $1.00 | $0.56 | $100.00 |
| 20 | Erosion control (832E30000) | EACH | 7,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 21 | Drainage structure, misc.: sidewalk trench (611E99900) | EACH | 5 | $1,200.00 | $800.00 | $1,600.00 | $500.00 | $1,500.70 | $3,850.00 |
| 22 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 651 | $65.00 | $100.00 | $92.00 | $101.00 | $93.41 | $100.00 |
| 23 | Valve box adjusted to grade (638E10800) | EACH | 3 | $150.00 | $200.00 | $400.00 | $300.00 | $562.00 | $400.00 |
| 24 | Ground mounted support, no. 3 post (630E03100) | FT | 75 | $16.00 | $17.00 | $16.00 | $27.00 | $16.00 | $12.00 |
| 25 | Sign, flat sheet (630E80100) | SF | 39 | $25.00 | $25.00 | $25.00 | $77.00 | $25.00 | $35.00 |
| 26 | Removal of ground mounted sign and disposal (630E84900) | EACH | 3 | $36.00 | $36.00 | $36.00 | $40.00 | $36.00 | $50.00 |
| 27 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $95.00 | $100.00 | $95.00 | $110.00 | $95.00 | $100.00 |
| 28 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $60.00 | $60.00 | $60.00 | $70.00 | $60.00 | $50.00 |
| 29 | Signing, misc.: solar powered rectangular rapid FL (630E97700) | EACH | 2 | $8,910.00 | $9,000.00 | $9,000.00 | $11,500 | $8,985.00 | $12,500 |
| 30 | Stop line (644E00500) | FT | 12 | $33.25 | $35.00 | $33.25 | $90.00 | $33.25 | $20.00 |
| 31 | Crosswalk line, 12" (644E00620) | FT | 128 | $21.45 | $25.00 | $21.45 | $50.00 | $21.45 | $20.00 |
| 32 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,000.00 | $6,500.00 | $5,000.00 | $13,000 | $5,000.00 | $3,500.00 |
| 33 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $10,000 | $35,000 | $12,500 | $34,600 | $15,000 |
| 34 | Construction layout stakes and surveying (623E10000) | LS | 1 | $11,135 | $9,000.00 | $6,500.00 | $18,250 | $10,800 | $10,000 |
| 35 | Mobilization (624E10000) | LS | 1 | $25,000 | $22,593 | $13,000 | $32,500 | $26,038 | $11,400 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.