ODOT contract 250529 bid tabulation

MAH-Afton Ave (SRTS) (SIDEWALK). Let by Ohio DOT on November 13, 2025, MAH. 6 bids received; low bid $243,318 by Foust Construction Inc, -26% against the engineer's estimate of $328,000.

Owner
Ohio DOT
Letting
13 NOV 2025
Pay items
35
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Foust Construction Inc$243,318Low-26%
2Daniel A Terreri & Sons Inc$268,800+10%-18%
3Parella-Pannunzio Inc$319,656+31%-3.0%
4Stanley Miller Construction Company$324,843+34%-1.0%
5S.T.A.R.T., LLC$336,452+38%+3.0%
6Tri-Mor Corp$339,318+39%+3.0%
ODOT contract 250529: bids by rank

Engineer's estimate: $328,000.

Bid tabulation

LinePay itemUnitQuantity1. Foust Construction Inc2. Daniel A Terreri & Sons Inc3. Parella-Pannunzio Inc4. Stanley Miller Construction Company5. S.T.A.R.T., LLC6. Tri-Mor Corp
1Clearing and grubbing (201E11000)LS1$1,000.00$10,000$12,000$6,000.00$13,000$15,000
2Pavement removed, as per plan (202E23001)SY651$20.00$18.00$20.00$21.00$58.56$26.00
3Walk removed (202E30000)SF80$10.00$5.00$10.00$5.00$19.74$5.00
4Curb removed (202E32000)FT36$20.00$20.00$50.00$5.00$29.97$20.00
5Excavation (203E10000)CY172$50.00$50.00$190.00$88.00$44.80$30.00
6Embankment (203E20000)CY14$50.00$100.00$100.00$97.00$74.07$40.00
7Subgrade compaction (204E10000)SY651$1.00$2.00$3.00$2.00$4.18$1.00
8Full depth pavement sawing (252E01500)FT995$3.00$3.00$7.00$4.00$4.62$3.00
94" concrete walk (608E10000)SF6,398$8.50$8.00$9.50$9.35$8.50$12.00
10Curb ramp (608E52000)SF331$20.00$20.00$24.00$23.00$30.94$25.00
11Monument assembly reconstructed to grade (623E39600)EACH2$2,000.00$400.00$1,200.00$1,000.00$748.00$1,000.00
12Special - as-built construction plans (690E91000)LS1$5,000.00$1,000.00$3,000.00$4,000.00$2,500.00$3,900.00
13Special - survey control verification (690E98400)LS1$2,000.00$2,000.00$500.00$4,000.00$1,200.00$15,000
14Soil analysis test (659E00100)EACH2$300.00$200.00$200.00$150.00$84.14$400.00
15Topsoil (659E00300)CY154$55.00$80.00$50.00$62.50$91.87$95.00
16Seeding and mulching (659E10000)SY1,380$3.00$5.00$5.00$5.00$3.51$7.00
17Commercial fertilizer (659E20000)TON0.20$400.00$1,000.00$200.00$800.00$1,249.00$4,000.00
18Lime (659E31000)ACRE0.30$300.00$1,000.00$200.00$100.00$870.00$1,200.00
19Water (659E35000)MGAL18$2.00$50.00$1.00$1.00$0.56$100.00
20Erosion control (832E30000)EACH7,000$1.00$1.00$1.00$1.00$1.00$1.00
21Drainage structure, misc.: sidewalk trench (611E99900)EACH5$1,200.00$800.00$1,600.00$500.00$1,500.70$3,850.00
226" non-reinforced concrete pavement, class QC MS (452E10050)SY651$65.00$100.00$92.00$101.00$93.41$100.00
23Valve box adjusted to grade (638E10800)EACH3$150.00$200.00$400.00$300.00$562.00$400.00
24Ground mounted support, no. 3 post (630E03100)FT75$16.00$17.00$16.00$27.00$16.00$12.00
25Sign, flat sheet (630E80100)SF39$25.00$25.00$25.00$77.00$25.00$35.00
26Removal of ground mounted sign and disposal (630E84900)EACH3$36.00$36.00$36.00$40.00$36.00$50.00
27Removal of ground mounted sign and reerection (630E85100)EACH1$95.00$100.00$95.00$110.00$95.00$100.00
28Removal of ground mounted post support and disposal (630E86002)EACH3$60.00$60.00$60.00$70.00$60.00$50.00
29Signing, misc.: solar powered rectangular rapid FL (630E97700)EACH2$8,910.00$9,000.00$9,000.00$11,500$8,985.00$12,500
30Stop line (644E00500)FT12$33.25$35.00$33.25$90.00$33.25$20.00
31Crosswalk line, 12" (644E00620)FT128$21.45$25.00$21.45$50.00$21.45$20.00
32Premium for contract performance bond and for payment bond (103E05000)LS1$4,000.00$6,500.00$5,000.00$13,000$5,000.00$3,500.00
33Maintaining traffic (614E11000)LS1$10,000$10,000$35,000$12,500$34,600$15,000
34Construction layout stakes and surveying (623E10000)LS1$11,135$9,000.00$6,500.00$18,250$10,800$10,000
35Mobilization (624E10000)LS1$25,000$22,593$13,000$32,500$26,038$11,400
ODOT contract 250529: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy