ODOT contract 250134 bid tabulation
SUM-CR 111/CR 25-04.33/04.10 (INTERSECTION). Let by Ohio DOT on February 27, 2025, SUM. 4 bids received; low bid $3,598,322 by Shelly & Sands Inc, +27% against the engineer's estimate of $2,844,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 178
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $3,598,322 | Low | +27% |
| 2 | S E T Inc | $3,724,631 | +4.0% | +31% |
| 3 | Eclipse Co LLC | $3,841,570 | +7.0% | +35% |
| 4 | Tri-Mor Corp | $3,986,740 | +11% | +40% |
Engineer's estimate: $2,844,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. S E T Inc | 3. Eclipse Co LLC | 4. Tri-Mor Corp |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $14,500 | $50,000 | $6,500.00 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 1,798 | $25.00 | $35.00 | $36.41 | $30.00 |
| 3 | Walk removed (202E30000) | SF | 4,107 | $1.20 | $5.00 | $2.59 | $5.00 |
| 4 | Curb removed (202E32000) | FT | 1,971 | $2.50 | $10.00 | $5.30 | $10.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 1,366 | $27.00 | $25.00 | $24.92 | $20.00 |
| 6 | Guardrail removed (202E38000) | FT | 251 | $11.00 | $8.00 | $10.06 | $5.00 |
| 7 | Manhole removed (202E58000) | EACH | 2 | $3,630.00 | $1,300.00 | $512.07 | $500.00 |
| 8 | Catch basin removed (202E58100) | EACH | 13 | $765.00 | $1,200.00 | $512.05 | $500.00 |
| 9 | Monument assembly removed (202E60010) | EACH | 2 | $340.00 | $200.00 | $623.40 | $100.00 |
| 10 | Removal misc.: inspection well (202E98100) | EACH | 1 | $785.00 | $500.00 | $246.48 | $100.00 |
| 11 | Removal misc.: conduit (202E98200) | FT | 10 | $80.00 | $25.00 | $23.96 | $50.00 |
| 12 | Excavation (203E10000) | CY | 1,222 | $42.00 | $25.00 | $73.37 | $40.00 |
| 13 | Excavation (203E10000) | CY | 50 | $60.00 | $55.00 | $20.12 | $40.00 |
| 14 | Embankment (203E20000) | CY | 854 | $40.00 | $30.00 | $62.06 | $25.00 |
| 15 | Embankment, as per plan (203E20001) | CY | 3 | $174.00 | $100.00 | $220.83 | $25.00 |
| 16 | Subgrade compaction (204E10000) | SY | 4,380 | $9.00 | $2.50 | $1.04 | $2.00 |
| 17 | Excavation of subgrade (204E13000) | CY | 687 | $50.00 | $35.00 | $113.25 | $25.00 |
| 18 | Granular material, type B (204E30010) | CY | 687 | $116.00 | $85.00 | $147.60 | $85.00 |
| 19 | Proof rolling (204E45000) | HR | 2 | $262.00 | $250.00 | $1,138.10 | $250.00 |
| 20 | Geotextile fabric (204E50000) | SY | 1,703 | $0.40 | $3.00 | $1.86 | $2.00 |
| 21 | Guardrail, type MGS (606E15050) | FT | 100 | $27.00 | $27.00 | $30.18 | $60.00 |
| 22 | Anchor assembly, MGS type E , (MASH 2016) (606E26150) | EACH | 4 | $800.00 | $3,000.00 | $2,766.50 | $1,000.00 |
| 23 | 4" concrete walk (608E10000) | SF | 3,858 | $11.00 | $10.00 | $5.89 | $15.00 |
| 24 | Curb ramp (608E52000) | SF | 870 | $27.00 | $24.00 | $19.72 | $25.00 |
| 25 | Monument assembly, type C (623E38500) | EACH | 2 | $2,300.00 | $1,500.00 | $3,335.91 | $2,000.00 |
| 26 | Special - mailbox support system, single (690E50100) | EACH | 7 | $350.00 | $300.00 | $148.80 | $200.00 |
| 27 | Special - as-built construction plans (690E91000) | LS | 1 | $3,000.00 | $7,000.00 | $8,437.80 | $7,000.00 |
| 28 | Special - survey control verification (690E98400) | LS | 1 | $5,250.00 | $4,000.00 | $4,218.90 | $4,500.00 |
| 29 | Soil analysis test (659E00100) | EACH | 2 | $135.00 | $250.00 | $125.75 | $200.00 |
| 30 | Topsoil (659E00300) | CY | 510 | $66.00 | $85.00 | $89.42 | $50.00 |
| 31 | Seeding and mulching (659E10000) | SY | 4,597 | $1.00 | $3.00 | $0.89 | $5.00 |
| 32 | Commercial fertilizer (659E20000) | TON | 0.62 | $960.00 | $850.00 | $896.74 | $3,700.00 |
| 33 | Lime (659E31000) | ACRE | 0.95 | $167.00 | $250.00 | $156.44 | $900.00 |
| 34 | Water (659E35000) | MGAL | 25 | $1.00 | $10.00 | $1.01 | $85.00 |
| 35 | Mowing (659E40000) | MSF | 10 | $5.30 | $30.00 | $40.24 | $300.00 |
| 36 | Erosion control mat, type B (671E15010) | SY | 127 | $1.60 | $3.00 | $1.50 | $2.00 |
| 37 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,600.00 | $5,000.00 | $2,439.55 | $2,700.00 |
| 38 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $26,300 | $12,000 | $22,575 | $24,922 |
| 39 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $18,000 | $22,000 | $16,731 | $18,392 |
| 40 | Erosion control (832E30000) | EACH | 63,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 3,671 | $17.00 | $20.00 | $34.21 | $25.00 |
| 42 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 230 | $34.00 | $25.00 | $34.40 | $25.00 |
| 43 | 12" conduit, type B (611E04400) | FT | 1,040 | $109.00 | $120.00 | $150.75 | $140.00 |
| 44 | 15" conduit, type B (611E05900) | FT | 430 | $106.00 | $125.00 | $151.55 | $150.00 |
| 45 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 10 | $108.00 | $150.00 | $95.05 | $40.00 |
| 46 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 10 | $108.00 | $140.00 | $80.36 | $40.00 |
| 47 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 10 | $108.00 | $140.00 | $80.36 | $40.00 |
| 48 | Catch basin, no. 3 (611E98150) | EACH | 5 | $4,775.00 | $4,000.00 | $6,984.66 | $5,500.00 |
| 49 | Catch basin, no. 3A (611E98180) | EACH | 14 | $4,000.00 | $3,500.00 | $5,818.08 | $4,300.00 |
| 50 | Catch basin, no. 2-2B (611E98470) | EACH | 5 | $1,880.00 | $3,000.00 | $5,037.18 | $2,800.00 |
| 51 | Catch basin adjusted to grade (611E98630) | EACH | 10 | $1,030.00 | $1,200.00 | $822.93 | $800.00 |
| 52 | Catch basin reconstructed to grade (611E98634) | EACH | 2 | $2,050.00 | $4,000.00 | $1,645.86 | $1,500.00 |
| 53 | Manhole, no. 3 (611E99574) | EACH | 3 | $6,100.00 | $5,500.00 | $7,376.25 | $4,700.00 |
| 54 | Manhole, no. 3 with 90" base I.D. and 8" weir (611E99582) | EACH | 1 | $12,100 | $13,000 | $16,006 | $15,000 |
| 55 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 4 | $2,000.00 | $2,000.00 | $2,618.68 | $2,800.00 |
| 56 | Inspection well (611E99720) | EACH | 1 | $3,000.00 | $1,200.00 | $910.83 | $1,500.00 |
| 57 | Special - miscellaneous metal (611E99820) | LB | 10,000 | $2.00 | $3.50 | $14.35 | $2.50 |
| 58 | Manufactured water quality structure, type 2 (895E10020) | EACH | 1 | $48,000 | $30,000 | $29,869 | $36,000 |
| 59 | Partial depth pavement repair (441) (251E01000) | SY | 1,500 | $55.00 | $30.00 | $45.27 | $50.00 |
| 60 | Pavement repair (253E01000) | SY | 750 | $130.00 | $75.00 | $125.75 | $80.00 |
| 61 | Pavement repair, as per plan (253E01001) | SY | 245 | $138.00 | $95.00 | $105.63 | $100.00 |
| 62 | Pavement planing, asphalt concrete, as per plan (3 (254E01001) | SY | 10,029 | $12.00 | $6.50 | $4.02 | $7.00 |
| 63 | Pavement planing, asphalt concrete, as per plan (3 (254E01001) | SY | 612 | $28.00 | $12.00 | $20.12 | $15.00 |
| 64 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 100 | $253.00 | $355.00 | $503.00 | $680.00 |
| 65 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 68 | $393.00 | $285.00 | $553.30 | $320.00 |
| 66 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 589 | $266.00 | $355.00 | $427.55 | $390.00 |
| 67 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 92 | $297.00 | $265.00 | $452.70 | $300.00 |
| 68 | Aggregate base (304E20000) | CY | 718 | $145.00 | $85.00 | $117.58 | $125.00 |
| 69 | Aggregate base (304E20000) | CY | 50 | $90.00 | $125.00 | $90.54 | $125.00 |
| 70 | Non-tracking tack coat (407E20000) | GAL | 2,514 | $3.00 | $3.50 | $6.04 | $5.00 |
| 71 | Stabilized crushed aggregate (411E10000) | CY | 6 | $400.00 | $250.00 | $301.80 | $300.00 |
| 72 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 17 | $1,000.00 | $950.00 | $905.40 | $1,000.00 |
| 73 | Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101) | CY | 570 | $260.00 | $320.00 | $352.10 | $345.00 |
| 74 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 570 | $240.00 | $465.00 | $477.85 | $500.00 |
| 75 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 163 | $270.00 | $265.00 | $503.00 | $290.00 |
| 76 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 170 | $145.00 | $110.00 | $111.01 | $100.00 |
| 77 | Curb, type 6 (609E26000) | FT | 4,315 | $35.99 | $22.00 | $21.78 | $25.00 |
| 78 | Special - 5' pavement overlay fabric composite (690E98300) | SY | 2,331 | $35.00 | $35.00 | $35.21 | $36.00 |
| 79 | Manhole adjusted to grade (611E99654) | EACH | 2 | $1,085.00 | $2,000.00 | $1,074.43 | $625.00 |
| 80 | Fire hydrant extended and adjusted to grade, as per plan (638E10301) | EACH | 4 | $10,000 | $10,000 | $9,895.75 | $15,000 |
| 81 | Special - valve box adjusted to grade (CWD) (638E20500) | EACH | 17 | $1,600.00 | $1,200.00 | $1,074.43 | $280.00 |
| 82 | Special - service box adjusted to grade (CWD) (638E20902) | EACH | 2 | $415.00 | $1,400.00 | $1,074.43 | $160.00 |
| 83 | Special - fire hydrant adjusted to grade (CWD) (638E21400) | EACH | 1 | $2,200.00 | $3,000.00 | $9,690.74 | $3,700.00 |
| 84 | 8" conduit, type B (611E01800) | FT | 20 | $166.00 | $75.00 | $323.35 | $125.00 |
| 85 | Manhole, no. 3 (611E99574) | EACH | 1 | $6,280.00 | $6,500.00 | $9,365.00 | $6,500.00 |
| 86 | Manhole adjusted to grade (611E99654) | EACH | 7 | $1,580.00 | $2,000.00 | $1,074.43 | $1,400.00 |
| 87 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 1 | $3,500.00 | $4,000.00 | $2,618.67 | $2,000.00 |
| 88 | Ground mounted support, no. 3 post (630E03100) | FT | 317.60 | $10.00 | $10.00 | $17.32 | $15.00 |
| 89 | Ground mounted support, no. 4 post (630E04100) | FT | 33.20 | $10.00 | $10.00 | $25.34 | $20.00 |
| 90 | Street name sign support, no. 3 post (630E08520) | FT | 12.60 | $10.00 | $12.00 | $17.32 | $15.00 |
| 91 | Sign post reflector (630E08600) | EACH | 3 | $35.00 | $40.00 | $64.44 | $40.00 |
| 92 | Sign hanger assembly, mast arm (630E79100) | EACH | 4 | $425.00 | $450.00 | $431.16 | $500.00 |
| 93 | Sign, flat sheet (630E80100) | SF | 252.50 | $19.00 | $20.00 | $20.09 | $25.00 |
| 94 | Sign, double faced, street name (630E80500) | EACH | 2 | $90.00 | $100.00 | $254.01 | $100.00 |
| 95 | Removal of ground mounted sign and disposal (630E84900) | EACH | 32 | $15.00 | $20.00 | $16.77 | $20.00 |
| 96 | Removal of ground mounted sign and disposal, as per plan (630E84901) | EACH | 1 | $36.00 | $40.00 | $419.42 | $40.00 |
| 97 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $53.00 | $60.00 | $64.67 | $50.00 |
| 98 | Removal of ground mounted post support and disposal (630E86002) | EACH | 23 | $16.00 | $20.00 | $22.36 | $20.00 |
| 99 | Removal of ground mounted post support and reerection (630E86010) | EACH | 2 | $16.00 | $20.00 | $67.67 | $20.00 |
| 100 | Removal of pole mounted sign and disposal (630E87500) | EACH | 2 | $16.00 | $20.00 | $16.77 | $20.00 |
| 101 | Removal of wood pole and disposal (630E89812) | EACH | 1 | $155.00 | $250.00 | $100.60 | $165.00 |
| 102 | Channelizing line, 8" (644E00400) | FT | 2,583 | $1.60 | $2.00 | $1.46 | $1.80 |
| 103 | Stop line (644E00500) | FT | 117 | $8.00 | $8.00 | $5.53 | $8.00 |
| 104 | Crosswalk line, 12" (644E00620) | FT | 500 | $4.00 | $4.00 | $5.03 | $4.00 |
| 105 | Transverse/diagonal line (644E00700) | FT | 224 | $7.00 | $8.00 | $5.28 | $8.00 |
| 106 | Island marking (644E00900) | SF | 54 | $6.00 | $6.00 | $5.03 | $6.00 |
| 107 | Lane arrow (644E01300) | EACH | 49 | $125.00 | $125.00 | $105.63 | $125.00 |
| 108 | Center line (646E10200) | MI | 0.66 | $5,900.00 | $6,000.00 | $10,231 | $6,200.00 |
| 109 | Conduit, 2", 725.051, as per plan (625E25409) | FT | 138 | $9.50 | $8.00 | $18.88 | $12.00 |
| 110 | Conduit, 3", 725.051, as per plan (625E25505) | FT | 210 | $12.00 | $10.00 | $14.15 | $14.00 |
| 111 | Conduit, 4", 725.051, as per plan (625E25605) | FT | 122 | $16.00 | $16.00 | $23.41 | $12.00 |
| 112 | Trench (625E29000) | FT | 260 | $10.00 | $23.00 | $7.02 | $12.00 |
| 113 | Trench in paved areas, as per plan (625E29401) | FT | 204 | $80.00 | $125.00 | $169.44 | $85.00 |
| 114 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,280.00 | $1,000.00 | $987.89 | $1,500.00 |
| 115 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,600.00 | $1,500.00 | $1,126.72 | $1,665.00 |
| 116 | Ground rod, as per plan (625E32001) | EACH | 10 | $215.00 | $250.00 | $164.98 | $250.00 |
| 117 | Underground warning/marking tape, as per plan (625E36011) | FT | 464 | $0.20 | $2.00 | $1.55 | $1.00 |
| 118 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 4 | $1,000.00 | $1,200.00 | $1,074.81 | $1,100.00 |
| 119 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 6 | $1,750.00 | $2,200.00 | $1,874.65 | $1,800.00 |
| 120 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $700.00 | $700.00 | $615.67 | $800.00 |
| 121 | Covering of vehicular signal head (632E25000) | EACH | 10 | $26.00 | $60.00 | $36.22 | $28.00 |
| 122 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $26.00 | $45.00 | $42.25 | $28.00 |
| 123 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 8 | $375.00 | $275.00 | $371.42 | $388.00 |
| 124 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,279 | $3.00 | $3.00 | $5.10 | $3.00 |
| 125 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 493 | $3.00 | $4.00 | $6.71 | $3.50 |
| 126 | Signal cable, 9 conductor, no. 14 AWG (632E40900) | FT | 367 | $4.00 | $5.00 | $8.99 | $4.00 |
| 127 | Signal support foundation, as per plan (632E64011) | EACH | 4 | $7,500.00 | $7,500.00 | $5,030.00 | $7,800.00 |
| 128 | Pedestal foundation (632E64020) | EACH | 5 | $1,300.00 | $1,100.00 | $1,529.12 | $1,350.00 |
| 129 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 1,217 | $2.00 | $2.00 | $1.19 | $2.25 |
| 130 | Power cable, 3 conductor, no. 8 AWG (632E67300) | FT | 10 | $6.50 | $30.00 | $9.86 | $7.00 |
| 131 | Service cable, 3 conductor, no. 8 AWG (632E69700) | FT | 87 | $6.50 | $9.00 | $4.59 | $7.00 |
| 132 | Power service, as per plan (632E70001) | EACH | 1 | $2,700.00 | $4,500.00 | $2,857.04 | $2,800.00 |
| 133 | Conduit riser, 3" diameter (632E70600) | EACH | 1 | $640.00 | $1,300.00 | $1,327.92 | $700.00 |
| 134 | Signal support, type TC-81.22, design 12, as per plan (632E72131) | EACH | 3 | $15,000 | $18,000 | $16,197 | $15,000 |
| 135 | Signal support, type TC-81.22, design 13, as per plan (632E72141) | EACH | 1 | $16,600 | $21,000 | $17,947 | $18,000 |
| 136 | Pedestal, 8', transformer base (632E89900) | EACH | 5 | $859.00 | $1,000.00 | $893.20 | $900.00 |
| 137 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $3,220.00 | $6,000.00 | $5,754.32 | $3,500.00 |
| 138 | Signalization, misc.: foundation test hole (632E90400) | EACH | 10 | $530.00 | $450.00 | $261.56 | $550.00 |
| 139 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $2,700.00 | $2,700.00 | $2,172.96 | $2,800.00 |
| 140 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,000.00 | $650.00 | $1,086.48 | $1,200.00 |
| 141 | Uninterruptible power supply (UPS), as per plan (633E74001) | EACH | 1 | $10,200 | $12,000 | $11,066 | $10,500 |
| 142 | Controller item, misc.: controller unit, type TS2/ (633E99000) | EACH | 1 | $25,800 | $32,000 | $27,041 | $27,000 |
| 143 | Stop line radar detection (809E69100) | EACH | 4 | $8,800.00 | $11,000 | $9,738.08 | $10,000 |
| 144 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 1 | $500.00 | $650.00 | $2,434.52 | $500.00 |
| 145 | Preempt receiving unit, as per plan (809E69211) | EACH | 4 | $900.00 | $1,200.00 | $1,187.08 | $1,000.00 |
| 146 | Preempt detector cable, as per plan (809E69221) | FT | 857 | $1.00 | $3.00 | $0.99 | $2.00 |
| 147 | Preempt phase selector, as per plan (809E69231) | EACH | 1 | $4,300.00 | $5,000.00 | $4,386.16 | $4,500.00 |
| 148 | Preempt confirmation light, as per plan (809E69241) | EACH | 4 | $640.00 | $750.00 | $806.81 | $700.00 |
| 149 | Traffic compacted surface, type A or B (410E12000) | CY | 100 | $120.00 | $125.00 | $176.05 | $130.00 |
| 150 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $100.00 | $85.00 | $65.39 | $150.00 |
| 151 | Detour signing (614E12420) | LS | 1 | $3,300.00 | $3,500.00 | $5,988.40 | $3,500.00 |
| 152 | Asphalt concrete for maintaining traffic (614E13000) | CY | 16 | $400.00 | $300.00 | $352.10 | $700.00 |
| 153 | Portable changeable message sign, as per plan (614E18601) | SNMT | 72 | $900.00 | $625.00 | $974.38 | $700.00 |
| 154 | Work zone center line, class I, 642 paint (614E21100) | MI | 2.29 | $1,000.00 | $1,100.00 | $1,146.84 | $1,200.00 |
| 155 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.12 | $11,000 | $11,000 | $14,263 | $15,000 |
| 156 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.66 | $1,000.00 | $1,100.00 | $553.30 | $1,200.00 |
| 157 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 1.23 | $1,000.00 | $1,100.00 | $618.69 | $1,200.00 |
| 158 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.14 | $5,300.00 | $5,500.00 | $8,381.64 | $5,600.00 |
| 159 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 5,684 | $0.50 | $0.75 | $0.65 | $1.00 |
| 160 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 2,578 | $0.50 | $0.75 | $0.60 | $1.00 |
| 161 | Work zone dotted line, class I, 4", 642 paint (614E24200) | FT | 448 | $0.50 | $0.75 | $0.55 | $1.00 |
| 162 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 640 | $3.00 | $4.00 | $3.27 | $3.00 |
| 163 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 225 | $3.00 | $4.00 | $3.22 | $3.00 |
| 164 | Work zone stop line, class I, 642 paint (614E26200) | FT | 391 | $3.00 | $3.00 | $3.52 | $3.00 |
| 165 | Work zone stop line, class III, 642 paint (614E26610) | FT | 118 | $3.00 | $3.00 | $3.47 | $3.00 |
| 166 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 501 | $2.50 | $3.00 | $3.27 | $3.00 |
| 167 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 501 | $2.50 | $3.00 | $3.22 | $3.00 |
| 168 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 114 | $48.00 | $50.00 | $60.36 | $50.00 |
| 169 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 49 | $48.00 | $50.00 | $55.33 | $50.00 |
| 170 | Work zone island marking, class I (614E32700) | SF | 173 | $2.50 | $10.00 | $3.27 | $2.50 |
| 171 | Work zone island marking, class III, 642 paint (614E32800) | SF | 53 | $2.50 | $3.00 | $3.22 | $2.50 |
| 172 | Pavement for maintaining traffic, class B (615E25000) | SY | 69 | $135.00 | $200.00 | $216.29 | $122.00 |
| 173 | Water (616E10000) | MGAL | 22 | $50.00 | $40.00 | $70.46 | $205.00 |
| 174 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $18,000 | $30,000 | $37,000 | $28,000 |
| 175 | Maintaining traffic (614E11000) | LS | 1 | $367,000 | $475,000 | $168,171 | $625,000 |
| 176 | Field office, type B (619E16010) | MNTH | 22 | $4,000.00 | $1,800.00 | $968.53 | $2,200.00 |
| 177 | Construction layout stakes and surveying (623E10000) | LS | 1 | $50,000 | $55,000 | $18,085 | $50,000 |
| 178 | Mobilization (624E10000) | LS | 1 | $180,000 | $200,000 | $81,141 | $135,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.