ODOT contract 260399 bid tabulation
CUY-US 422-16.20 Interchange (INTERCHANGE). Let by Ohio DOT on October 29, 2026, CUY. 4 bids received; low bid $11,288,797 by Tri-Mor Corp, +2.5% against the engineer's estimate of $11,009,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 316
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Tri-Mor Corp | $11,288,797 | Low | +3.0% |
| 2 | S E T Inc | $12,124,213 | +7.0% | +10% |
| 3 | Great Lakes Construction Co | $12,428,762 | +10% | +13% |
| 4 | Karvo Companies Inc | $12,553,301 | +11% | +14% |
Engineer's estimate: $11,009,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Tri-Mor Corp | 2. S E T Inc | 3. Great Lakes Construction Co | 4. Karvo Companies Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $112,800 | $50,000 | $9,600.00 | $15,000 |
| 2 | Pavement removed (202E23000) | SY | 25,131 | $15.00 | $18.00 | $18.00 | $18.00 |
| 3 | Walk removed (202E30000) | SF | 7,489 | $3.00 | $3.00 | $2.75 | $4.00 |
| 4 | Concrete median removed (202E30600) | SY | 475 | $15.00 | $25.00 | $20.00 | $35.00 |
| 5 | Traffic island removed (202E30800) | SY | 390 | $15.00 | $30.00 | $19.50 | $25.00 |
| 6 | Curb removed (202E32000) | FT | 5,039 | $10.00 | $7.00 | $1.50 | $10.00 |
| 7 | Gutter removed (202E32600) | FT | 32 | $15.00 | $16.00 | $27.50 | $18.00 |
| 8 | Concrete slope protection removed (202E32800) | SY | 1,200 | $18.00 | $19.00 | $16.50 | $25.00 |
| 9 | Pipe removed, 24" and under (202E35100) | FT | 1,866 | $15.00 | $19.00 | $12.50 | $20.00 |
| 10 | Pipe removed, over 24" diameter (202E35200) | FT | 1,018 | $33.00 | $31.00 | $8.00 | $30.00 |
| 11 | Guardrail removed (202E38000) | FT | 2,287 | $2.00 | $3.00 | $2.00 | $2.00 |
| 12 | Manhole removed (202E58000) | EACH | 8 | $800.00 | $1,297.00 | $700.00 | $575.00 |
| 13 | Catch basin removed (202E58100) | EACH | 26 | $800.00 | $1,191.00 | $775.00 | $500.00 |
| 14 | Fence removed (202E75000) | FT | 462 | $10.00 | $4.00 | $10.00 | $10.00 |
| 15 | Excavation (203E10000) | CY | 10,687 | $25.00 | $29.00 | $40.00 | $45.00 |
| 16 | Embankment (203E20000) | CY | 4,097 | $25.00 | $26.00 | $24.00 | $12.00 |
| 17 | Embankment, as per plan (203E20001) | CY | 392 | $16.00 | $33.00 | $52.00 | $10.00 |
| 18 | Granular embankment, as per plan (203E35001) | CY | 196 | $100.00 | $74.00 | $150.00 | $60.00 |
| 19 | Subgrade compaction (204E10000) | SY | 31,845 | $1.50 | $2.00 | $1.15 | $1.00 |
| 20 | Excavation of subgrade (204E13000) | CY | 2,596 | $20.00 | $30.00 | $40.00 | $45.00 |
| 21 | Granular material, type B, as per plan (204E30011) | CY | 2,596 | $89.00 | $78.00 | $84.00 | $85.00 |
| 22 | Proof rolling (204E45000) | HR | 15 | $200.00 | $266.00 | $400.00 | $500.00 |
| 23 | Geogrid (204E51000) | SY | 7,788 | $4.00 | $4.00 | $4.25 | $1.50 |
| 24 | Linear grading, as per plan (209E60201) | STA | 11 | $600.00 | $389.00 | $1,050.00 | $850.00 |
| 25 | Guardrail, type MGS (606E15050) | FT | 375 | $27.00 | $29.00 | $24.50 | $24.50 |
| 26 | Guardrail, type MGS, as per plan (606E15051) | FT | 388 | $27.00 | $32.00 | $24.50 | $24.50 |
| 27 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,650.00 | $2,835.00 | $2,450.00 | $2,450.00 |
| 28 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 3 | $2,700.00 | $3,150.00 | $2,500.00 | $2,500.00 |
| 29 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,600.00 | $1,680.00 | $1,450.00 | $1,450.00 |
| 30 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,500.00 | $2,835.00 | $2,350.00 | $2,350.00 |
| 31 | Impact attenuator, type 2 (bidirectional) (35 MPH, (606E60028) | EACH | 2 | $25,200 | $26,250 | $23,500 | $23,500 |
| 32 | Fence, type CLT (607E23000) | FT | 223 | $55.00 | $53.00 | $49.95 | $49.95 |
| 33 | Fence, misc.:wood fence (607E98000) | FT | 52 | $85.00 | $100.00 | $79.50 | $79.50 |
| 34 | 4" concrete walk (608E10000) | SF | 12,199 | $9.00 | $10.00 | $10.50 | $6.00 |
| 35 | 6" concrete walk (608E13000) | SF | 15,682 | $10.00 | $10.00 | $11.50 | $8.00 |
| 36 | 6" concrete walk, as per plan (608E13001) | SF | 500 | $12.00 | $11.00 | $12.00 | $8.00 |
| 37 | 8" concrete walk, as per plan (608E15001) | SF | 1,113 | $13.00 | $13.00 | $14.00 | $10.00 |
| 38 | Curb ramp (608E52000) | SF | 4,322 | $18.00 | $22.00 | $21.00 | $20.00 |
| 39 | Concrete barrier, single slope, type C1 (622E10140) | FT | 56 | $500.00 | $452.00 | $550.00 | $350.00 |
| 40 | Concrete barrier, single slope, type D (622E10160) | FT | 605 | $215.00 | $154.00 | $240.00 | $100.00 |
| 41 | Concrete barrier end section, type C1 (622E24860) | EACH | 1 | $15,000 | $4,410.00 | $19,000 | $10,500 |
| 42 | Concrete barrier end section, type D (622E25000) | EACH | 2 | $8,500.00 | $3,570.00 | $8,000.00 | $9,000.00 |
| 43 | Concrete barrier, end anchorage, reinforced, type C1 (622E25014) | EACH | 1 | $9,500.00 | $3,570.00 | $11,000 | $6,500.00 |
| 44 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 2 | $7,500.00 | $3,150.00 | $7,500.00 | $6,000.00 |
| 45 | Monument assembly, as per plan (623E38501) | EACH | 1 | $1,850.00 | $1,284.00 | $2,250.00 | $1,500.00 |
| 46 | Reference monument, type A (623E40500) | EACH | 5 | $500.00 | $1,260.00 | $500.00 | $400.00 |
| 47 | Right-of-way monument, type B (623E40520) | EACH | 21 | $350.00 | $315.00 | $250.00 | $250.00 |
| 48 | Special - mailbox support system, single (690E50100) | EACH | 2 | $250.00 | $379.00 | $100.00 | $250.00 |
| 49 | Special - survey control verification (690E98400) | LS | 1 | $9,500.00 | $5,775.00 | $5,452.93 | $8,700.00 |
| 50 | Concrete slope protection (601E21000) | SY | 1,175 | $95.00 | $128.00 | $135.00 | $90.00 |
| 51 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 8 | $100.00 | $154.00 | $124.77 | $175.00 |
| 52 | Paved gutter, type 1-2, as per plan (601E37501) | FT | 94 | $76.00 | $236.00 | $145.00 | $150.00 |
| 53 | Soil analysis test (659E00100) | EACH | 2 | $400.00 | $159.00 | $400.00 | $400.00 |
| 54 | Topsoil (659E00300) | CY | 3,406 | $40.00 | $81.00 | $40.00 | $32.00 |
| 55 | Seeding and mulching, class 1 (659E00500) | SY | 14,259 | $1.25 | $3.00 | $0.90 | $1.00 |
| 56 | Seeding and mulching (659E10000) | SY | 11,775 | $1.25 | $2.00 | $0.85 | $1.00 |
| 57 | Repair seeding and mulching (659E14000) | SY | 1,302 | $1.25 | $2.00 | $1.00 | $1.00 |
| 58 | Inter-seeding (659E15000) | SY | 1,302 | $0.75 | $1.00 | $1.00 | $1.00 |
| 59 | Commercial fertilizer (659E20000) | TON | 3.64 | $600.00 | $945.00 | $1,800.00 | $1,800.00 |
| 60 | Lime (659E31000) | ACRE | 5.38 | $50.00 | $53.00 | $0.01 | $0.01 |
| 61 | Water (659E35000) | MGAL | 145 | $10.00 | $11.00 | $60.00 | $60.00 |
| 62 | Mowing (659E40000) | MSF | 59 | $35.00 | $11.00 | $12.00 | $12.00 |
| 63 | Slope erosion protection (670E00500) | SY | 3,062 | $2.00 | $3.00 | $2.50 | $2.50 |
| 64 | Ditch erosion protection (670E00700) | SY | 1,681 | $2.00 | $3.00 | $3.00 | $3.00 |
| 65 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,500.00 | $5,250.00 | $6,000.00 | $25,000 |
| 66 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $23,000 | $21,000 | $24,000 | $30,000 |
| 67 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $21,025 | $25,502 | $22,500 | $10,000 |
| 68 | Erosion control (832E30000) | EACH | 100,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | Seeding and erosion control with turf reinforcing mat, type 2 (836E10020) | SY | 27 | $3.00 | $16.00 | $15.00 | $15.00 |
| 70 | Concrete masonry (602E20000) | CY | 1 | $2,800.00 | $1,999.00 | $3,500.00 | $2,550.00 |
| 71 | 6" shallow pipe underdrains, as per plan (605E11101) | FT | 9,079 | $15.00 | $24.00 | $28.00 | $20.00 |
| 72 | 6" unclassified pipe underdrains, as per plan (605E13301) | FT | 416 | $14.00 | $25.00 | $32.00 | $25.00 |
| 73 | 6" base pipe underdrains, as per plan (605E14001) | FT | 6,519 | $15.00 | $25.00 | $19.00 | $15.00 |
| 74 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 391 | $16.00 | $27.00 | $40.00 | $22.00 |
| 75 | 6" conduit, type B (611E00900) | FT | 1,014 | $68.00 | $41.00 | $35.00 | $25.00 |
| 76 | 6" conduit, type C (611E01100) | FT | 200 | $32.00 | $41.00 | $40.00 | $25.00 |
| 77 | 6" conduit, type E (611E01400) | FT | 200 | $32.00 | $31.00 | $30.00 | $35.00 |
| 78 | 6" conduit, type F (611E01500) | FT | 240 | $15.00 | $31.00 | $30.00 | $30.00 |
| 79 | 12" conduit, type B (611E04400) | FT | 13 | $200.00 | $206.00 | $265.00 | $300.00 |
| 80 | 12" conduit, type B (611E04400) | FT | 111 | $135.00 | $120.00 | $145.00 | $135.00 |
| 81 | 15" conduit, type B (611E05900) | FT | 158 | $145.00 | $130.00 | $185.00 | $200.00 |
| 82 | 15" conduit, type C (611E06100) | FT | 449 | $100.00 | $112.00 | $135.00 | $175.00 |
| 83 | 21" conduit, type C (611E09100) | FT | 237 | $170.00 | $153.00 | $170.00 | $160.00 |
| 84 | 24" conduit, type B (611E10400) | FT | 141 | $225.00 | $184.00 | $230.00 | $285.00 |
| 85 | 24" conduit, type C (611E10600) | FT | 83 | $210.00 | $175.00 | $190.00 | $170.00 |
| 86 | 30" conduit, type B, as per plan (611E13401) | FT | 152 | $300.00 | $237.00 | $360.00 | $375.00 |
| 87 | 36" conduit, type B, as per plan (611E16401) | FT | 48 | $380.00 | $284.00 | $395.00 | $400.00 |
| 88 | 36" conduit, type C, as per plan (611E16601) | FT | 70 | $310.00 | $262.00 | $290.00 | $275.00 |
| 89 | 42" conduit, type B, as per plan (611E19401) | FT | 206 | $410.00 | $321.00 | $380.00 | $375.00 |
| 90 | 42" conduit, type C, as per plan (611E19601) | FT | 24 | $460.00 | $335.00 | $445.00 | $475.00 |
| 91 | 48" conduit, type B, as per plan (611E20901) | FT | 349 | $470.00 | $388.00 | $535.00 | $475.00 |
| 92 | 48" conduit, type C, as per plan, 707.65 (611E21101) | FT | 178 | $400.00 | $373.00 | $420.00 | $500.00 |
| 93 | Catch basin, no. 4 (611E98230) | EACH | 1 | $7,000.00 | $7,549.00 | $7,400.00 | $5,600.00 |
| 94 | Catch basin, no. 5 (611E98300) | EACH | 4 | $5,800.00 | $6,257.00 | $6,400.00 | $5,000.00 |
| 95 | Catch basin, no. 6, as per plan (611E98371) | EACH | 2 | $4,900.00 | $4,137.00 | $4,000.00 | $4,500.00 |
| 96 | Catch basin, misc.: city of solon standard 2-2B CA (611E98690) | EACH | 4 | $4,000.00 | $3,651.00 | $3,250.00 | $4,500.00 |
| 97 | Catch basin, misc.: city of solon standard vertica (611E98690) | EACH | 33 | $5,200.00 | $3,929.00 | $5,250.00 | $4,500.00 |
| 98 | Manhole, no. 3, as per plan (611E99575) | EACH | 9 | $13,300 | $11,762 | $15,000 | $15,000 |
| 99 | Manhole adjusted to grade (611E99654) | EACH | 2 | $675.00 | $1,624.00 | $1,000.00 | $850.00 |
| 100 | Manhole, misc.: city of solon standard manhole, TY (611E99690) | EACH | 13 | $7,800.00 | $6,879.00 | $7,000.00 | $10,000 |
| 101 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $500.00 | $393.00 | $475.00 | $1,250.00 |
| 102 | Special - miscellaneous metal (611E99820) | LB | 500 | $3.00 | $7.00 | $2.50 | $3.00 |
| 109 | 12" conduit, type B (611E04400) | FT | 1,026 | $120.00 | $117.00 | $155.00 | $195.00 |
| 110 | 12" conduit, type C (611E04600) | FT | 517 | $95.00 | $100.00 | $145.00 | $175.00 |
| 111 | 15" conduit, type B (611E05900) | FT | 105 | $140.00 | $138.00 | $185.00 | $165.00 |
| 112 | 21" conduit, type C (611E09100) | FT | 36 | $180.00 | $172.00 | $200.00 | $145.00 |
| 113 | 36" conduit, type C, as per plan (611E16601) | FT | 37 | $310.00 | $257.00 | $395.00 | $200.00 |
| 114 | 48" conduit, type C, as per plan, 707.65 (alternat [alternate group AA2] (611E21101) | FT | 52 | $460.00 | $397.00 | $450.00 | $350.00 |
| 115 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 5,082 | $235.00 | $229.00 | $218.50 | $225.00 |
| 116 | Aggregate base, as per plan (304E20001) | CY | 4,716 | $90.00 | $86.00 | $120.00 | $100.00 |
| 117 | Aggregate base, as per plan (304E20001) | CY | 375 | $115.00 | $87.00 | $220.00 | $225.00 |
| 118 | Non-tracking tack coat (407E20000) | GAL | 2,869 | $5.00 | $4.00 | $4.00 | $4.00 |
| 119 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 4 | $700.00 | $683.00 | $650.00 | $500.00 |
| 120 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 6 | $650.00 | $630.00 | $600.00 | $500.00 |
| 121 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 27 | $800.00 | $788.00 | $750.00 | $500.00 |
| 122 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 1,078 | $375.00 | $368.00 | $350.00 | $300.00 |
| 123 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 1,264 | $360.00 | $352.00 | $335.00 | $285.00 |
| 124 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 65 | $100.00 | $69.00 | $170.00 | $125.00 |
| 125 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 270 | $105.00 | $79.00 | $130.00 | $135.00 |
| 126 | Curb, type 6 (609E26000) | FT | 6,931 | $20.00 | $21.00 | $43.00 | $25.00 |
| 127 | Curb, type 7 (609E28000) | FT | 322 | $40.00 | $21.00 | $75.00 | $45.00 |
| 128 | 4" concrete traffic island (609E50000) | SY | 920 | $81.00 | $65.00 | $55.00 | $55.00 |
| 129 | 6" concrete traffic island, as per plan (609E54001) | SY | 167 | $85.00 | $83.00 | $85.00 | $85.00 |
| 130 | Compacted aggregate (617E10100) | CY | 72 | $135.00 | $131.00 | $125.00 | $150.00 |
| 131 | Shoulder preparation (617E20000) | SY | 1,284 | $8.00 | $3.00 | $32.30 | $4.00 |
| 132 | Water (617E25000) | MGAL | 4 | $200.00 | $203.00 | $600.00 | $5.00 |
| 133 | Manhole adjusted to grade (611E99654) | EACH | 1 | $1,000.00 | $1,624.00 | $1,000.00 | $1,500.00 |
| 134 | Fire hydrant removed, as per plan (638E10481) | EACH | 4 | $800.00 | $1,524.00 | $4,000.00 | $1,500.00 |
| 135 | Valve box adjusted to grade (638E10800) | EACH | 16 | $250.00 | $1,054.00 | $650.00 | $750.00 |
| 136 | Special - 12" water main dip class 52 mechanical joints and fittings (638E20168) | FT | 5 | $1,100.00 | $902.00 | $1,250.00 | $2,250.00 |
| 137 | Special - 6" fire hydrant (cleveland) (638E20750) | EACH | 2 | $15,900 | $8,938.00 | $23,500 | $20,000 |
| 138 | Special - fire hydrant service line extended and adjusted to grade (638E20762) | EACH | 1 | $14,500 | $3,475.00 | $12,000 | $10,000 |
| 139 | Special - fire hydrant service line shortened and adjusted to grade (638E20764) | EACH | 1 | $9,200.00 | $3,475.00 | $11,500 | $8,500.00 |
| 140 | Water work, misc.: cleveland water department fees (638E98000) | EACH | 61 | $500.00 | $500.00 | $500.00 | $500.00 |
| 141 | Water work, misc.: meter removed and reset (clevel (638E98000) | EACH | 1 | $15,000 | $4,600.00 | $3,950.00 | $5,000.00 |
| 142 | Water work, misc.: cleveland water department as-B (638E98100) | LS | 1 | $2,500.00 | $5,250.00 | $650.00 | $1,250.00 |
| 143 | Manhole adjusted to grade (611E99654) | EACH | 4 | $900.00 | $1,624.00 | $2,750.00 | $1,500.00 |
| 144 | Manhole reconstructed to grade (611E99660) | EACH | 2 | $1,500.00 | $6,156.00 | $4,400.00 | $2,000.00 |
| 145 | Connection, fused pull apart (625E00450) | EACH | 20 | $165.00 | $140.00 | $130.00 | $151.90 |
| 146 | Light pole, conventional, as per plan, AT15B35 (625E10491) | EACH | 7 | $6,500.00 | $5,791.00 | $4,700.00 | $6,075.00 |
| 147 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 9 | $2,600.00 | $1,845.00 | $2,400.00 | $2,500.00 |
| 148 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 14,820 | $5.00 | $5.00 | $5.50 | $5.00 |
| 149 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,440 | $2.00 | $2.00 | $2.00 | $1.35 |
| 150 | Conduit, 2", 725.051, as per plan (625E25409) | FT | 2,151 | $11.00 | $6.00 | $11.00 | $9.65 |
| 151 | Conduit, 3", 725.051, as per plan (625E25505) | FT | 1,172 | $14.00 | $9.00 | $13.00 | $12.40 |
| 152 | Conduit, 4", 725.051, as per plan (625E25605) | FT | 105 | $42.00 | $16.00 | $16.00 | $38.44 |
| 153 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 8 | $900.00 | $676.00 | $525.00 | $824.60 |
| 154 | Luminaire, underpass, solid state (LED), medium DI (625E27502) | EACH | 4 | $3,400.00 | $2,216.00 | $750.00 | $3,200.00 |
| 155 | Trench (625E29000) | FT | 3,428 | $10.00 | $16.00 | $12.00 | $8.64 |
| 156 | Pull box, 725.06, size 4 (625E30510) | EACH | 16 | $1,300.00 | $1,026.00 | $1,200.00 | $1,147.00 |
| 157 | Ground rod (625E32000) | EACH | 11 | $180.00 | $261.00 | $300.00 | $166.00 |
| 158 | Power service, as per plan (625E34001) | EACH | 1 | $7,900.00 | $12,288 | $11,500 | $7,285.00 |
| 159 | Underground warning marking tape (625E36010) | FT | 3,428 | $2.50 | $0.50 | $2.00 | $2.08 |
| 160 | Light pole removed (625E75400) | EACH | 9 | $400.00 | $489.00 | $200.00 | $347.20 |
| 161 | Light pole foundation removed (625E75500) | EACH | 9 | $515.00 | $410.00 | $200.00 | $475.33 |
| 162 | Luminaire removed (625E75506) | EACH | 11 | $105.00 | $264.00 | $50.00 | $96.95 |
| 163 | Power service removed (625E75510) | EACH | 1 | $740.00 | $1,732.00 | $600.00 | $682.00 |
| 164 | Arc flash calculations and label, lighting control (625E76000) | EACH | 1 | $2,730.00 | $1,260.00 | $3,625.00 | $2,542.00 |
| 165 | Lighting, misc.: existing light pole, bracket arm (625E98000) | EACH | 2 | $1,135.00 | $5,154.00 | $1,500.00 | $1,054.00 |
| 166 | Delineator, post ground mounted (620E00500) | EACH | 29 | $100.00 | $105.00 | $65.00 | $65.00 |
| 167 | Removal of delineator (620E31200) | EACH | 50 | $11.00 | $21.00 | $10.00 | $10.00 |
| 168 | RPM (621E00100) | EACH | 132 | $70.00 | $105.00 | $63.90 | $63.90 |
| 169 | Raised pavement marker removed (621E54000) | EACH | 65 | $25.00 | $26.00 | $14.82 | $1.00 |
| 170 | Ground rod (625E32000) | EACH | 7 | $400.00 | $410.00 | $375.00 | $375.00 |
| 171 | Barrier reflector, type 1, one way (626E00102) | EACH | 9 | $15.00 | $26.00 | $13.00 | $13.00 |
| 172 | Barrier reflector, type 2, one way (626E00110) | EACH | 18 | $15.00 | $29.00 | $13.00 | $13.00 |
| 173 | Ground mounted support, no. 2 post (630E02100) | FT | 90 | $18.00 | $21.00 | $16.00 | $16.00 |
| 174 | Ground mounted support, no. 3 post (630E03100) | FT | 718.90 | $20.00 | $23.00 | $18.00 | $18.00 |
| 175 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 85.30 | $55.00 | $55.00 | $50.00 | $50.00 |
| 176 | Sign post reflector (630E08600) | EACH | 6 | $50.00 | $79.00 | $46.00 | $46.00 |
| 177 | Breakaway structural beam connection (630E09000) | EACH | 4 | $750.00 | $788.00 | $695.00 | $695.00 |
| 178 | Overhead sign support, type TC-9.31, design 2 (630E72210) | EACH | 3 | $18,000 | $17,325 | $16,450 | $16,450 |
| 179 | Overhead sign support, type TC-15.116, design 1 (630E72410) | EACH | 1 | $81,500 | $84,000 | $75,850 | $75,850 |
| 180 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 1 | $128,100 | $126,000 | $119,350 | $119,350 |
| 181 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 9 | $450.00 | $525.00 | $410.00 | $410.00 |
| 182 | Sign support assembly, pole mounted (630E79500) | EACH | 5 | $250.00 | $131.00 | $230.00 | $230.00 |
| 183 | Sign, flat sheet (630E80100) | SF | 662.20 | $25.00 | $29.00 | $19.00 | $19.00 |
| 184 | Sign, overhead extrusheet (630E80224) | SF | 421 | $35.00 | $32.00 | $32.00 | $32.00 |
| 185 | Sign erected, flat sheet, as per plan (630E81101) | SF | 12.50 | $18.00 | $16.00 | $16.00 | $16.00 |
| 186 | Ground mounted structural beam support foundation (630E84500) | EACH | 4 | $1,350.00 | $1,050.00 | $1,240.00 | $1,240.00 |
| 187 | Rigid overhead sign support foundation (630E84510) | EACH | 7 | $11,500 | $11,550 | $9,320.00 | $10,620 |
| 188 | Removal of ground mounted sign and disposal (630E84900) | EACH | 73 | $16.00 | $21.00 | $15.00 | $15.00 |
| 189 | Removal of ground mounted sign and storage, as per plan (630E85001) | EACH | 5 | $75.00 | $105.00 | $65.00 | $65.00 |
| 190 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 7 | $300.00 | $263.00 | $280.00 | $280.00 |
| 191 | Removal of ground mounted post support and disposal (630E86002) | EACH | 60 | $12.00 | $26.00 | $10.00 | $10.00 |
| 192 | Removal of ground mounted structural beam support (630E86102) | EACH | 10 | $315.00 | $420.00 | $295.00 | $295.00 |
| 193 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 11 | $345.00 | $236.00 | $320.00 | $320.00 |
| 194 | Removal of pole mounted sign and disposal (630E87500) | EACH | 15 | $38.00 | $26.00 | $35.00 | $35.00 |
| 195 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 2 | $2,800.00 | $2,100.00 | $2,550.00 | $2,600.00 |
| 196 | Removal of overhead sign support and disposal, type TC-17.10 (630E89810) | EACH | 1 | $1,800.00 | $3,150.00 | $1,650.00 | $1,650.00 |
| 197 | Edge line, 4", type 1 (642E00100) | MI | 0.96 | $1,500.00 | $1,400.00 | $1,350.00 | $1,350.00 |
| 198 | Lane line, 4", type 1 (642E00200) | MI | 0.59 | $1,250.00 | $1,200.00 | $1,145.00 | $1,145.00 |
| 199 | Center line, type 1 (642E00300) | MI | 0.45 | $1,900.00 | $1,890.00 | $1,770.00 | $1,770.00 |
| 200 | Channelizing line, 8", type 1 (642E00400) | FT | 2,033 | $1.00 | $1.00 | $0.75 | $0.75 |
| 201 | Stop line, type 1 (642E00500) | FT | 249 | $4.00 | $4.00 | $3.75 | $3.75 |
| 202 | Transverse/diagonal line, type 1 (642E00700) | FT | 430 | $4.00 | $4.00 | $3.50 | $3.50 |
| 203 | Lane arrow, type 1 (642E01300) | EACH | 70 | $60.00 | $58.00 | $55.00 | $55.00 |
| 204 | Word on pavement, 72", type 1 (642E01400) | EACH | 2 | $75.00 | $68.00 | $65.00 | $65.00 |
| 205 | Dotted line, 4", type 1 (642E01500) | FT | 1,083 | $1.00 | $1.00 | $0.70 | $0.70 |
| 206 | Edge line, 6" (644E00104) | MI | 2.94 | $6,500.00 | $6,200.00 | $5,865.00 | $5,865.00 |
| 207 | Lane line, 6" (644E00204) | MI | 0.06 | $4,000.00 | $4,000.00 | $3,665.00 | $3,665.00 |
| 208 | Channelizing line, 12" (644E00404) | FT | 2,261 | $2.00 | $2.00 | $1.50 | $1.50 |
| 209 | Stop line (644E00500) | FT | 85 | $6.00 | $6.00 | $5.50 | $5.50 |
| 210 | Crosswalk line, 12" (644E00620) | FT | 343 | $6.00 | $5.00 | $5.00 | $5.00 |
| 211 | Transverse/diagonal line (644E00700) | FT | 891 | $6.00 | $6.00 | $5.25 | $5.25 |
| 212 | Lane arrow (644E01300) | EACH | 50 | $150.00 | $152.00 | $145.00 | $145.00 |
| 213 | Lane reduction arrow (644E01350) | EACH | 2 | $370.00 | $362.00 | $345.00 | $345.00 |
| 214 | Dotted line, 6" (644E01510) | FT | 1,035 | $2.00 | $1.00 | $1.25 | $1.25 |
| 215 | Yield line (644E20800) | FT | 20 | $8.00 | $8.00 | $7.50 | $7.50 |
| 216 | Removal of pavement marking (644E30000) | FT | 1,500 | $2.00 | $1.00 | $1.20 | $1.20 |
| 217 | Removal of pavement marking (644E30030) | MI | 0.22 | $7,000.00 | $6,800.00 | $6,465.00 | $6,465.00 |
| 218 | Bracket arm, 10', as per plan (625E18001) | EACH | 1 | $1,550.00 | $2,067.00 | $1,100.00 | $1,426.00 |
| 219 | Bracket arm, 15', as per plan (625E18201) | EACH | 5 | $1,800.00 | $2,920.00 | $1,200.00 | $1,661.60 |
| 220 | Bracket arm, 25', as per plan (625E18501) | EACH | 2 | $2,720.00 | $4,284.00 | $2,000.00 | $2,535.80 |
| 221 | Conduit, 2", 725.051, as per plan (625E25409) | FT | 1,863 | $12.50 | $6.00 | $11.00 | $11.71 |
| 222 | Conduit, 3", 725.051, as per plan (625E25505) | FT | 457 | $13.50 | $9.00 | $13.00 | $12.60 |
| 223 | Conduit, 4", 725.051, as per plan (625E25605) | FT | 1,109 | $44.00 | $15.00 | $15.00 | $40.98 |
| 224 | Trench (625E29000) | FT | 3,283 | $11.00 | $16.00 | $12.00 | $9.70 |
| 225 | Pull box, 725.06, size 7 (625E30520) | EACH | 14 | $1,260.00 | $1,167.00 | $1,350.00 | $1,171.80 |
| 226 | Pull box, 725.06, size 18 (625E30530) | EACH | 3 | $2,600.00 | $2,570.00 | $2,950.00 | $2,362.20 |
| 227 | Pull box, misc.: pull box, 24" X 35" X 26" (625E31600) | EACH | 2 | $2,400.00 | $2,617.00 | $2,800.00 | $3,151.40 |
| 228 | Ground rod (625E32000) | EACH | 26 | $180.00 | $261.00 | $300.00 | $166.92 |
| 229 | Underground warning marking tape (625E36010) | FT | 3,283 | $2.50 | $0.50 | $2.00 | $2.14 |
| 230 | Arc flash calculations and label, traffic signal C (625E76000) | EACH | 3 | $2,350.00 | $1,260.00 | $3,625.00 | $2,170.00 |
| 231 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 31 | $1,480.00 | $1,182.00 | $1,400.00 | $1,370.20 |
| 232 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $800.00 | $691.00 | $800.00 | $737.80 |
| 233 | Covering of vehicular signal head, as per plan (632E25001) | EACH | 31 | $62.00 | $86.00 | $50.00 | $57.40 |
| 234 | Covering of pedestrian signal head, as per plan (632E25011) | EACH | 8 | $63.00 | $86.00 | $40.00 | $58.90 |
| 235 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 8 | $515.00 | $307.00 | $325.00 | $476.63 |
| 236 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 3,076 | $13.00 | $3.00 | $3.00 | $12.19 |
| 237 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,443 | $13.00 | $4.00 | $3.50 | $11.75 |
| 238 | Signal support foundation (632E64010) | EACH | 10 | $4,650.00 | $7,614.00 | $6,500.00 | $4,309.00 |
| 239 | Pedestal foundation (632E64020) | EACH | 4 | $1,700.00 | $1,299.00 | $1,350.00 | $1,573.25 |
| 240 | Pedestal foundation, as per plan (632E64021) | EACH | 6 | $1,800.00 | $1,332.00 | $1,750.00 | $1,674.00 |
| 241 | Test hole performed (632E64950) | EACH | 10 | $215.00 | $487.00 | $250.00 | $198.40 |
| 242 | Loop detector lead-in cable (632E65200) | FT | 3,473 | $2.00 | $2.00 | $2.50 | $1.60 |
| 243 | Power service, as per plan (632E70001) | EACH | 3 | $3,800.00 | $3,313.00 | $3,000.00 | $3,503.00 |
| 244 | Signal support, type TC-12.31 design 6 pole, with mast arms TC-81.22 design 4 and design 4, as per plan (632E71225) | EACH | 1 | $32,000 | $29,787 | $27,200 | $29,605 |
| 245 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 1 | $19,000 | $18,615 | $15,500 | $17,577 |
| 246 | Combination signal support, type TC-81.22, design 4, as per plan (632E79111) | EACH | 5 | $20,000 | $20,626 | $16,250 | $18,321 |
| 247 | Combination signal support, type TC-81.22, design 12, as per plan (632E79131) | EACH | 3 | $24,000 | $26,760 | $20,400 | $22,289 |
| 248 | Pedestal, 10.7' tall, transformer base, as per plan (632E89921) | EACH | 4 | $2,550.00 | $2,506.00 | $2,100.00 | $2,356.00 |
| 249 | Pedestal, misc.: pedestal, 19', transformer base (632E90010) | EACH | 6 | $3,000.00 | $3,217.00 | $2,350.00 | $2,752.80 |
| 250 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 2 | $3,400.00 | $4,844.00 | $1,500.00 | $3,162.00 |
| 251 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 3 | $25,000 | $23,411 | $21,850 | $22,506 |
| 252 | Cabinet foundation, as per plan (633E67101) | EACH | 3 | $3,000.00 | $2,517.00 | $3,000.00 | $2,728.00 |
| 253 | Controller work pad, as per plan (633E67201) | EACH | 3 | $1,800.00 | $637.00 | $800.00 | $1,674.00 |
| 254 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 3 | $8,750.00 | $7,788.00 | $7,500.00 | $8,060.00 |
| 255 | Controller item, misc.: controller modifications (633E99000) | EACH | 1 | $4,100.00 | $1,968.00 | $1,200.00 | $3,813.00 |
| 256 | Controller item, misc.: fiber optic ethernet switc (633E99000) | EACH | 3 | $4,200.00 | $3,987.00 | $3,600.00 | $3,906.00 |
| 257 | Controller item, misc.: programming of centracs SY (633E99000) | EACH | 1 | $9,100.00 | $6,285.00 | $4,500.00 | $7,502.00 |
| 258 | Fiber optic cable, armored, 18 fiber, as per plan (804E20011) | FT | 2,208 | $9.00 | $5.00 | $7.50 | $7.49 |
| 259 | Drop cable, 6 fiber (804E32000) | EACH | 3 | $525.00 | $525.00 | $750.00 | $488.56 |
| 260 | Fiber termination panel, 12 fiber (804E34012) | EACH | 3 | $3,000.00 | $1,575.00 | $1,750.00 | $2,728.00 |
| 261 | Splice enclosure, butt style (804E37000) | EACH | 3 | $3,000.00 | $1,575.00 | $2,100.00 | $2,728.00 |
| 262 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $12,200 | $13,972 | $15,000 | $11,346 |
| 263 | Atc controller, as per plan (809E69123) | EACH | 3 | $7,600.00 | $7,807.00 | $7,100.00 | $7,068.00 |
| 264 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 2 | $4,200.00 | $5,289.00 | $600.00 | $3,875.00 |
| 265 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 1 | $23,700 | $23,916 | $24,500 | $22,010 |
| 266 | Preempt receiving unit, as per plan (809E69211) | EACH | 8 | $1,450.00 | $1,042.00 | $1,250.00 | $1,333.00 |
| 267 | Preempt receiving unit, as per plan (809E69211) | EACH | 1 | $5,200.00 | $1,247.00 | $1,450.00 | $4,774.00 |
| 268 | Preempt detector cable (809E69220) | FT | 1,916 | $3.50 | $2.00 | $4.00 | $3.06 |
| 269 | Preempt phase selector (809E69230) | EACH | 6 | $5,500.00 | $133.00 | $3,750.00 | $5,115.00 |
| 270 | Preempt confirmation light, as per plan (809E69241) | EACH | 11 | $800.00 | $585.00 | $850.00 | $723.71 |
| 272 | Video detection system, as per plan (816E30001) | EACH | 2 | $50,300 | $51,100 | $55,000 | $46,841 |
| 273 | Stabilized crushed aggregate (411E10000) | CY | 85 | $115.00 | $121.00 | $215.00 | $125.00 |
| 274 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,800.00 | $2,940.00 | $2,450.00 | $2,450.00 |
| 275 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 140 | $115.00 | $89.00 | $105.00 | $150.00 |
| 276 | Special - work zone traffic signal (614E11300) | EACH | 3 | $30,700 | $36,162 | $40,000 | $28,520 |
| 277 | Increased barrier delineation (614E11630) | FT | 505 | $4.00 | $3.00 | $1.95 | $3.00 |
| 278 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 7 | $2,600.00 | $1,969.00 | $2,000.00 | $1,869.57 |
| 279 | Detour signing (614E12420) | LS | 1 | $40,000 | $37,459 | $55,500 | $50,000 |
| 280 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $315.00 | $336.00 | $560.75 | $350.00 |
| 281 | Barrier reflector, type 1, 1-way (614E13310) | EACH | 94 | $12.00 | $12.00 | $9.50 | $11.32 |
| 282 | Object marker, one way (614E13350) | EACH | 94 | $24.00 | $23.00 | $16.65 | $21.69 |
| 283 | Portable changeable message sign, as per plan (614E18601) | SNMT | 17 | $950.00 | $919.00 | $750.00 | $869.57 |
| 284 | Work zone lane line, class I, 4" (614E20000) | MI | 0.48 | $900.00 | $866.00 | $810.00 | $810.00 |
| 285 | Work zone lane line, class I, 6" (614E20010) | MI | 0.17 | $950.00 | $919.00 | $865.00 | $865.00 |
| 286 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.30 | $900.00 | $866.00 | $810.00 | $810.00 |
| 287 | Work zone center line, class I (614E21000) | MI | 1.31 | $1,800.00 | $1,680.00 | $1,590.00 | $1,590.00 |
| 288 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.15 | $2,100.00 | $1,680.00 | $1,590.00 | $1,590.00 |
| 289 | Work zone edge line, class I, 4" (614E22000) | MI | 3.23 | $1,300.00 | $1,207.00 | $1,145.00 | $1,145.00 |
| 290 | Work zone edge line, class I, 6" (614E22010) | MI | 6.56 | $1,500.00 | $1,444.00 | $1,370.00 | $1,370.00 |
| 291 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 2.60 | $1,300.00 | $1,207.00 | $1,145.00 | $1,145.00 |
| 292 | Work zone channelizing line, class I, 8" (614E23000) | FT | 4,318 | $1.00 | $1.00 | $0.45 | $0.45 |
| 293 | Work zone channelizing line, class I, 12" (614E23010) | FT | 1,478 | $1.00 | $1.00 | $0.75 | $0.75 |
| 294 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 3,494 | $1.00 | $1.00 | $0.45 | $0.45 |
| 295 | Work zone dotted line, class I (614E24000) | FT | 2,424 | $1.00 | $1.00 | $0.40 | $0.40 |
| 296 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 2,118 | $1.00 | $1.00 | $0.40 | $0.40 |
| 297 | Work zone transverse/diagonal line, class I (614E25000) | FT | 337 | $4.00 | $3.00 | $3.00 | $3.00 |
| 298 | Work zone stop line, class I (614E26000) | FT | 601 | $4.00 | $3.00 | $3.25 | $3.25 |
| 299 | Work zone stop line, class III, 642 paint (614E26610) | FT | 229 | $4.00 | $3.00 | $3.25 | $3.25 |
| 300 | Work zone arrow, class I (614E30000) | EACH | 93 | $45.00 | $42.00 | $40.00 | $40.00 |
| 301 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 101 | $45.00 | $42.00 | $101.00 | $40.00 |
| 302 | Work zone island marking, class I (614E32700) | SF | 126 | $4.00 | $3.00 | $3.00 | $3.00 |
| 303 | Business entrance sign, as per plan (614E40051) | EACH | 1 | $235.00 | $236.00 | $175.00 | $225.00 |
| 304 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $80,000 | $164,186 | $80,000 | $125,000 |
| 305 | Pavement for maintaining traffic, class A (615E20000) | SY | 3,913 | $88.00 | $114.00 | $125.00 | $75.00 |
| 306 | Water (616E10000) | MGAL | 100 | $50.00 | $41.00 | $60.00 | $1.00 |
| 307 | Portable barrier, unanchored (622E41100) | FT | 1,300 | $20.00 | $46.00 | $34.00 | $55.00 |
| 308 | Portable barrier, anchored (622E41110) | FT | 2,884 | $55.00 | $54.00 | $35.00 | $40.00 |
| 309 | Unclassified excavation (503E21100) | CY | 2 | $315.00 | $90.00 | $5,500.00 | $1,000.00 |
| 310 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 188 | $40.00 | $41.00 | $32.00 | $36.00 |
| 311 | Special - urethane top coat sealer (512E71500) | SY | 115 | $35.00 | $41.00 | $18.00 | $30.00 |
| 312 | Structure drainage, misc.: weep hole reconstructio (518E62200) | EACH | 24 | $500.00 | $596.00 | $640.00 | $750.00 |
| 313 | Structure drainage, misc.: drainage collection sys (518E63300) | LS | 1 | $21,000 | $20,740 | $158,000 | $100,000 |
| 314 | Special - composite fiber wrap system (519E00100) | SF | 1,570 | $58.00 | $47.00 | $45.00 | $52.00 |
| 315 | Patching concrete structure (519E11100) | SF | 160 | $180.00 | $105.00 | $100.00 | $160.00 |
| 316 | Special -utility coordination and relocation (690E98400) | LS | 1 | $10,000 | $6,376.00 | $23,000 | $5,000.00 |
| 317 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $95,000 | $102,010 | $95,000 | $100,000 |
| 318 | CPM progress schedule (108E10000) | LS | 1 | $15,000 | $7,013.00 | $2,500.00 | $46,000 |
| 319 | Special - departments share facilitated partnering costs (111E10100) | EACH | 7,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 320 | Maintaining traffic (614E11000) | LS | 1 | $650,000 | $900,000 | $519,000 | $898,082 |
| 321 | Field office, type C (619E16020) | MNTH | 20 | $3,200.00 | $2,172.00 | $4,250.00 | $4,000.00 |
| 322 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $95,000 | $189,000 | $140,000 | $350,000 |
| 323 | Mobilization (624E10000) | LS | 1 | $185,000 | $500,000 | $600,000 | $900,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.