ODOT letting results, October 29, 2026
20 contracts let by Ohio DOT on October 29, 2026, $119,778,627 in low bids, a median of 4 bidders per contract. On the 20 with an engineer's estimate, the low bid came in under it 11 times; median low bid -9.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 20
- Low bids, total
- $119,778,627
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260453 | DEL-IR 71-00.00, FRA-IR 71-28.62 (FOUR LANE RESURFACING) | DEL | 3 | Shelly & Sands Inc | $23,183,469 | $28,219,896 | +22% | 0.0% | ODOT |
| 260417 | LOR-SR 611-03.44 (BRIDGE PAINTING) | LOR | 7 | Corrosion Resistance LTD | $17,153,185 | $17,298,439 | +1.0% | -18% | ODOT |
| 260399 | CUY-US 422-16.20 Interchange (INTERCHANGE) | CUY | 4 | Tri-Mor Corp | $11,288,797 | $12,124,213 | +7.0% | +3.0% | ODOT |
| 260474 | WAR-IR 71-00.00 (FOUR LANE RESURFACING) | WAR | 2 | Barrett Paving Materials Inc | $11,197,318 | $12,830,188 | +15% | +9.0% | ODOT |
| 260477 | ATB-IR 90 Vacant Rest Areas TP (PARKING AREAS) | ATB | 3 | Karvo Companies Inc | $9,185,577 | $9,242,650 | +1.0% | +8.0% | ODOT |
| 260467 | LAW-US 52-07.44 (SLIDE REPAIR) | LAW | 2 | Allard Excavation LLC | $8,751,687 | $8,878,603 | +1.0% | +9.0% | ODOT |
| 260455 | ASD-OVERLAY VAR FY2027 (TWO LANE RESURFACING) | ASD | 2 | Kokosing Construction Company Inc | $6,659,917 | $6,865,632 | +3.0% | -9.0% | ODOT |
| 260468 | MAH-SR 46-13.55 (PART 1 AND PART 2) (INTERSECTION) | MAH | 4 | Shelly & Sands Inc | $6,562,795 | $7,475,832 | +14% | -9.0% | ODOT |
| 260471 | MOT-SR 835-02.57 (BRIDGE REPLACEMENT (1 BRIDGE)) | MOT | 5 | Eagle Bridge Co | $5,570,980 | $5,914,491 | +6.0% | -26% | ODOT |
| 260454 | ADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES)) | ADA | 5 | D G M Inc | $4,877,413 | $5,103,924 | +5.0% | -16% | ODOT |
| 268021 | JEF-SR 7-32.95 (SLIDE REPAIR) | JEF | 3 | Buds Inc | $3,442,043 | $3,579,815 | +4.0% | +10% | ODOT |
| 260475 | WOO-IR 75-13.83 Deck Replacement (BRIDGE REPAIR) | WOO | 3 | Eagle Bridge Co | $2,769,748 | $3,022,171 | +9.0% | -9.0% | ODOT |
| 260461 | HAM-IR 275-11.40 (SLIDE REPAIR) | HAM | 5 | Sunesis Construction Co | $2,766,883 | $2,901,596 | +5.0% | +8.0% | ODOT |
| 260456 | COL-EL Riverfront Trail Phase1.1 (SIDEWALK) | COL | 2 | Shelly & Sands Inc | $1,779,282 | $1,830,844 | +3.0% | +12% | ODOT |
| 260469 | MOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | MOT | 6 | Double Z Construction Company | $1,306,719 | $1,523,584 | +17% | -13% | ODOT |
| 260476 | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | WOO | 7 | Great Lakes Demolition Company | $952,236 | $1,003,615 | +5.0% | -32% | ODOT |
| 264027 | CLI-/GRE Inverts FY27 (CULVERT REPLACEMENT) | CLI | 3 | BCC Ohio Inc | $791,078 | $999,343 | +26% | +5.0% | ODOT |
| 264028 | HAN-SR 103-12.43 (BRIDGE REPAIR) | HAN | 4 | BCC Ohio Inc | $581,103 | $593,528 | +2.0% | -12% | ODOT |
| 260465 | HOL-US 62-30.74 (SLIDE REPAIR) | HOL | 5 | Dennison Bridge Inc | $482,245 | $524,559 | +9.0% | -16% | ODOT |
| 264029 | LAK-SR 283-03.29 Sidewalk (SIDEWALK) | LAK | 4 | D L Smith Concrete LLC | $476,153 | $545,972 | +15% | -13% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.