ODOT contract 260474 bid tabulation
WAR-IR 71-00.00 (FOUR LANE RESURFACING). Let by Ohio DOT on October 29, 2026, WAR. 2 bids received; low bid $11,197,318 by Barrett Paving Materials Inc, +8.5% against the engineer's estimate of $10,318,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 80
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $11,197,318 | Low | +9.0% |
| 2 | John R Jurgensen Company | $12,830,188 | +15% | +24% |
Engineer's estimate: $10,318,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. John R Jurgensen Company |
|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 4,037.50 | $5.50 | $5.50 |
| 2 | Guardrail removed, barrier design (202E38300) | FT | 313 | $10.00 | $10.00 |
| 3 | Anchor assembly removed, type E (202E42010) | EACH | 11 | $150.00 | $150.00 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 8 | $125.00 | $125.00 |
| 5 | Bridge terminal assembly removed (202E47000) | EACH | 16 | $200.00 | $200.00 |
| 6 | Impact attenuator removed (202E47800) | EACH | 4 | $350.00 | $350.00 |
| 7 | Removal misc.: median crossover (202E98300) | SY | 102 | $30.00 | $203.74 |
| 9 | Guardrail, type MGS with long posts (606E15100) | FT | 4,287.50 | $32.35 | $32.35 |
| 10 | Guardrail, barrier design, type MGS (606E15550) | FT | 362.50 | $36.80 | $36.80 |
| 11 | Anchor assembly, MGS type E (606E26150) | EACH | 11 | $2,725.00 | $2,725.00 |
| 12 | Anchor assembly, MGS type T (606E26550) | EACH | 7 | $1,450.00 | $1,450.00 |
| 13 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 11 | $2,565.00 | $2,565.00 |
| 14 | MGS bridge terminal assembly, type 1, barrier design (606E35006) | EACH | 2 | $3,875.00 | $3,875.00 |
| 15 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $315.00 | $315.00 |
| 16 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 4 | $12,250 | $12,250 |
| 20 | Cable barrier (gibraltar) (alternate 2) [alternate group AA2] (610E10000) | FT | 25,843 | $28.25 | $28.25 |
| 21 | Cable barrier, anchor terminal (gibraltar) (altern [alternate group AA2] (610E10100) | EACH | 32 | $5,100.00 | $5,100.00 |
| 24 | Topsoil (659E00300) | CY | 1,285 | $30.00 | $35.07 |
| 25 | Seeding and mulching (659E10000) | SY | 11,577 | $1.50 | $1.15 |
| 26 | Commercial fertilizer (659E20000) | TON | 1.56 | $500.00 | $1,500.00 |
| 27 | Lime (659E31000) | ACRE | 2.39 | $2.00 | $200.00 |
| 28 | Water (659E35000) | MGAL | 62.50 | $1.00 | $1.00 |
| 29 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,500.00 | $3,500.00 |
| 30 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,000.00 | $4,425.00 |
| 31 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $2,247.00 | $2,246.35 |
| 32 | Erosion control (832E30000) | EACH | 4,000 | $1.00 | $1.00 |
| 33 | Pavement planing, asphalt concrete 1.5" depth (254E01000) | SY | 316,062 | $2.75 | $3.94 |
| 34 | Patching planed surface (254E01600) | SY | 3,168 | $3.00 | $7.14 |
| 35 | Full depth pavement removal and rigid replacement, type 1, class QC RS (255E19000) | SY | 2,500 | $480.00 | $881.81 |
| 36 | Non-tracking tack coat (407E20000) | GAL | 28,446 | $4.00 | $5.00 |
| 37 | Anti-segregation equipment (442E00100) | CY | 8,997 | $22.00 | $13.00 |
| 38 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 13,170 | $306.00 | $323.81 |
| 39 | Combination curb and gutter, type 4, as per plan (609E23001) | FT | 225 | $150.00 | $151.51 |
| 40 | Compacted aggregate (617E10100) | CY | 309 | $150.00 | $176.96 |
| 41 | Shoulder preparation (617E20000) | SY | 5,564 | $2.00 | $2.07 |
| 42 | Water (617E25000) | MGAL | 6 | $100.00 | $7.78 |
| 43 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 13.32 | $1,800.00 | $1,043.00 |
| 44 | RPM (621E00100) | EACH | 1,090 | $37.80 | $37.80 |
| 45 | Raised pavement marker removed (621E54000) | EACH | 1,090 | $15.00 | $12.94 |
| 46 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 14 | $15.00 | $15.00 |
| 47 | Barrier reflector, type 2 (one-way) (626E00110) | EACH | 41 | $13.00 | $13.00 |
| 48 | Barrier reflector, type 6 (626E00118) | EACH | 263 | $12.00 | $12.00 |
| 49 | Chevron marking (644E00720) | FT | 354 | $9.00 | $9.00 |
| 50 | Lane arrow (644E01300) | EACH | 25 | $115.00 | $115.00 |
| 51 | Lane reduction arrow (644E01350) | EACH | 4 | $140.00 | $140.00 |
| 52 | Wrong way arrow (644E01360) | EACH | 5 | $175.00 | $175.00 |
| 53 | Removal of pavement marking (644E30020) | EACH | 18 | $50.00 | $50.00 |
| 54 | Speed measurement marking (644E40000) | EACH | 32 | $250.00 | $651.26 |
| 55 | Edge line, 6", type A4 (645E00118) | MI | 1.29 | $24,000 | $24,000 |
| 56 | Lane line, 6", type A4 (645E00220) | MI | 0.37 | $9,500.00 | $9,500.00 |
| 57 | Channelizing line, 12", type A4 (645E00418) | FT | 1,748 | $6.00 | $6.00 |
| 58 | Stop line (646E10400) | FT | 125 | $14.50 | $14.50 |
| 59 | Transverse/diagonal line (646E10600) | FT | 277 | $14.50 | $14.50 |
| 60 | Lane arrow (646E20300) | EACH | 24 | $155.00 | $155.00 |
| 61 | Wrong way arrow (646E20320) | EACH | 2 | $270.00 | $270.00 |
| 62 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 15.20 | $4,325.00 | $4,325.00 |
| 63 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 18.62 | $1,925.00 | $1,925.00 |
| 64 | Wet reflective thermoplastic pavement marking, center line (807E14200) | MI | 0.06 | $7,000.00 | $7,000.00 |
| 65 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 13,858 | $2.60 | $2.60 |
| 66 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 2,654 | $1.05 | $1.05 |
| 67 | Wet reflective thermoplastic pavement marking, dotted line, 12" (807E14430) | FT | 5,299 | $1.70 | $1.70 |
| 68 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 33.79 | $1,250.00 | $1,250.00 |
| 69 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 2,654 | $1.25 | $1.25 |
| 70 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 19,157 | $1.60 | $1.60 |
| 71 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 1.66 | $3,500.00 | $3,500.00 |
| 72 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 1,748 | $2.00 | $2.00 |
| 73 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 500 | $100.00 | $136.21 |
| 74 | Portable changeable message sign, as per plan (614E18601) | SNMT | 20 | $870.00 | $870.00 |
| 75 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 18.62 | $890.00 | $890.00 |
| 76 | Work zone center line, class I, 807 paint (614E21050) | MI | 0.06 | $5,000.00 | $5,000.00 |
| 77 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 15.20 | $1,950.00 | $1,950.00 |
| 78 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 13,858 | $2.00 | $2.00 |
| 79 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 2,654 | $1.50 | $1.50 |
| 80 | Work zone dotted line, class I, 12", 807 paint (614E24106) | FT | 5,299 | $2.00 | $2.00 |
| 81 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 49 | $70.00 | $70.00 |
| 82 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $39,899 | $36,556 |
| 83 | Maintaining traffic (614E11000) | LS | 1 | $1,529,000 | $1,342,941 |
| 84 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $30,000 | $12,687 |
| 85 | Mobilization (624E10000) | LS | 1 | $400,000 | $600,000 |
| 100 | Vegetation control strip, concrete (610E50000) | SY | 11,877 | $72.00 | $73.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.