ODOT contract 260461 bid tabulation
HAM-IR 275-11.40 (SLIDE REPAIR). Let by Ohio DOT on October 29, 2026, HAM. 5 bids received; low bid $2,766,883 by Sunesis Construction Co, +8.1% against the engineer's estimate of $2,560,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 90
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sunesis Construction Co | $2,766,883 | Low | +8.0% |
| 2 | Prus Construction Company | $2,901,596 | +5.0% | +13% |
| 3 | Alan Stone Co Inc | $3,013,017 | +9.0% | +18% |
| 4 | Eagle Bridge Co | $3,183,832 | +15% | +24% |
| 5 | Complete General Construction Company | $3,621,883 | +31% | +41% |
Engineer's estimate: $2,560,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sunesis Construction Co | 2. Prus Construction Company | 3. Alan Stone Co Inc | 4. Eagle Bridge Co | 5. Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $72,777 | $20,750 | $50,000 | $45,000 | $14,000 |
| 2 | Headwall removed (202E20010) | EACH | 2 | $368.49 | $3,060.00 | $500.00 | $725.00 | $600.00 |
| 3 | Pavement removed (202E23000) | SY | 440 | $13.01 | $17.65 | $25.00 | $20.00 | $40.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 97 | $15.58 | $13.00 | $25.00 | $15.00 | $40.00 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 107 | $33.52 | $23.00 | $85.00 | $20.00 | $50.00 |
| 6 | Guardrail removed (202E38000) | FT | 88 | $10.26 | $11.00 | $45.00 | $10.00 | $5.00 |
| 8 | Manhole removed (202E58000) | EACH | 2 | $641.08 | $3,880.00 | $630.00 | $1,250.00 | $675.00 |
| 9 | Special - pipe cleanout, 24" and under (202E70110) | FT | 207 | $27.42 | $45.00 | $60.00 | $25.00 | $40.00 |
| 10 | Excavation (203E10000) | CY | 2,119 | $14.42 | $23.00 | $20.00 | $25.00 | $33.00 |
| 11 | Embankment (203E20000) | CY | 2,961 | $11.39 | $20.00 | $12.00 | $22.00 | $42.00 |
| 12 | Subgrade compaction (204E10000) | SY | 499 | $2.74 | $2.75 | $4.50 | $6.00 | $5.00 |
| 13 | Excavation of subgrade (204E13000) | CY | 160 | $34.39 | $22.50 | $25.00 | $10.00 | $70.00 |
| 14 | Granular embankment (204E21000) | CY | 160 | $103.18 | $125.00 | $40.00 | $100.00 | $125.00 |
| 15 | Proof rolling (204E45000) | HR | 1 | $287.83 | $153.00 | $220.00 | $150.00 | $145.00 |
| 16 | Geotextile fabric (204E50000) | SY | 499 | $0.89 | $6.00 | $3.00 | $2.00 | $6.00 |
| 17 | Guardrail, type MGS (606E15050) | FT | 362.50 | $37.50 | $36.50 | $30.00 | $33.00 | $29.60 |
| 19 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $7,662.00 | $17,850 | $41,000 | $20,000 | $23,000 |
| 20 | Riprap, type D (601E11000) | SY | 7 | $1,031.22 | $635.00 | $400.00 | $600.00 | $450.00 |
| 21 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $495.26 | $385.00 | $220.00 | $155.00 | $200.00 |
| 22 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 19 | $269.71 | $340.00 | $220.00 | $200.00 | $145.00 |
| 23 | Soil analysis test (659E00100) | EACH | 2 | $75.00 | $85.00 | $140.00 | $450.00 | $250.00 |
| 24 | Topsoil (659E00300) | CY | 490 | $65.00 | $72.00 | $45.00 | $5.00 | $50.00 |
| 25 | Seeding and mulching (659E10000) | SY | 4,413 | $4.31 | $2.40 | $4.50 | $2.75 | $3.00 |
| 26 | Repair seeding and mulching (659E14000) | SY | 221 | $2.20 | $2.40 | $3.00 | $2.00 | $2.00 |
| 27 | Commercial fertilizer (659E20000) | TON | 0.60 | $820.00 | $900.00 | $980.00 | $1,500.00 | $1,000.00 |
| 28 | Lime (659E31000) | ACRE | 0.91 | $50.00 | $55.00 | $400.00 | $1.00 | $55.58 |
| 29 | Water (659E35000) | MGAL | 24 | $50.00 | $55.00 | $1.00 | $20.00 | $1.00 |
| 30 | Erosion control (832E30000) | EACH | 12,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 31 | Ditch cleanout, as per plan (209E10001) | FT | 100 | $28.49 | $30.00 | $120.00 | $50.00 | $50.00 |
| 32 | Concrete masonry (602E20000) | CY | 2.20 | $2,588.45 | $2,500.00 | $2,500.00 | $1,750.00 | $2,000.00 |
| 33 | Concrete masonry, as per plan (602E20001) | CY | 0.80 | $1,892.70 | $3,400.00 | $2,400.00 | $6,500.00 | $3,000.00 |
| 34 | 6" shallow pipe underdrains (605E11100) | FT | 354 | $12.50 | $26.00 | $45.00 | $17.00 | $28.00 |
| 35 | 6" base pipe underdrains (605E14000) | FT | 354 | $16.22 | $23.00 | $50.00 | $15.00 | $34.00 |
| 36 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 22 | $39.87 | $47.50 | $30.00 | $32.00 | $75.00 |
| 37 | 18" conduit, type B (611E07400) | FT | 56 | $435.64 | $311.00 | $140.00 | $350.00 | $240.00 |
| 38 | 24" conduit, type C (611E10600) | FT | 41 | $164.53 | $160.00 | $380.00 | $350.00 | $200.00 |
| 39 | 42" conduit, type B (611E19400) | FT | 79 | $820.80 | $505.00 | $840.00 | $550.00 | $380.00 |
| 40 | 42" conduit, type C (611E19600) | FT | 28 | $377.57 | $265.00 | $640.00 | $500.00 | $400.00 |
| 41 | Manhole, no. 3 (611E99574) | EACH | 1 | $7,403.43 | $18,350 | $5,000.00 | $12,000 | $7,000.00 |
| 42 | Manhole, no. 3 (611E99574) | EACH | 1 | $10,522 | $18,100 | $5,000.00 | $15,000 | $8,000.00 |
| 43 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $359.80 | $845.00 | $350.00 | $450.00 | $380.00 |
| 44 | Cured-in-place pipe liner, 42" diameter (899E10000) | FT | 228 | $789.50 | $595.00 | $1,200.00 | $800.00 | $800.00 |
| 45 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 101 | $450.00 | $550.00 | $360.00 | $350.00 | $450.00 |
| 46 | Aggregate base (304E20000) | CY | 134 | $132.53 | $120.00 | $100.00 | $125.00 | $130.00 |
| 47 | Non-tracking tack coat (407E20000) | GAL | 51 | $5.00 | $5.50 | $5.00 | $1.00 | $5.00 |
| 48 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 37 | $1,200.00 | $950.00 | $500.00 | $550.00 | $1,200.00 |
| 49 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 355 | $4.00 | $15.50 | $95.00 | $27.00 | $15.00 |
| 50 | RPM (621E00100) | EACH | 74 | $84.65 | $95.00 | $230.00 | $85.00 | $85.00 |
| 51 | Barrier reflector, type 2, one way (626E00110) | EACH | 8 | $13.00 | $16.50 | $15.00 | $15.00 | $15.00 |
| 52 | Ground mounted support, no. 3 post (630E03100) | FT | 15.50 | $28.92 | $22.00 | $20.00 | $20.00 | $30.00 |
| 53 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $120.34 | $110.00 | $90.00 | $100.00 | $110.00 |
| 54 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $22.70 | $55.00 | $35.00 | $50.00 | $20.00 |
| 55 | Edge line, 6" (644E00104) | MI | 1.15 | $5,450.00 | $5,995.00 | $12,000 | $5,450.00 | $5,450.00 |
| 56 | Lane line, 6" (644E00204) | MI | 1.12 | $3,260.00 | $3,585.00 | $7,400.00 | $3,260.00 | $3,260.00 |
| 57 | Stabilized crushed aggregate (411E10000) | CY | 78 | $132.63 | $116.00 | $110.00 | $150.00 | $150.00 |
| 58 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $85.00 | $135.00 | $150.00 | $110.00 | $95.00 |
| 59 | Increased barrier delineation (614E11630) | FT | 600 | $1.79 | $2.00 | $3.50 | $1.50 | $1.80 |
| 60 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 1 | $2,135.38 | $2,350.00 | $2,600.00 | $2,250.00 | $2,200.00 |
| 61 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 454 | $35.95 | $42.00 | $40.00 | $9.00 | $9.00 |
| 62 | Barrier reflector, type 1, one way (614E13310) | EACH | 8 | $10.76 | $12.00 | $20.00 | $12.00 | $11.00 |
| 63 | Object marker, one way (614E13350) | EACH | 8 | $21.20 | $23.50 | $25.00 | $20.00 | $22.00 |
| 64 | Portable changeable message sign, as per plan (614E18601) | SNMT | 10 | $898.61 | $990.00 | $1,400.00 | $800.00 | $900.00 |
| 65 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 1.15 | $815.00 | $897.00 | $5,000.00 | $815.00 | $815.00 |
| 66 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 5,944 | $0.70 | $0.80 | $1.50 | $0.70 | $0.70 |
| 67 | Pavement for maintaining traffic, class A (615E20000) | SY | 896 | $116.03 | $188.25 | $120.00 | $150.00 | $160.00 |
| 68 | Water (616E10000) | MGAL | 1 | $12.25 | $130.00 | $1.00 | $50.00 | $170.00 |
| 69 | Portable barrier, unanchored (622E41100) | FT | 990 | $39.34 | $40.00 | $20.00 | $45.00 | $37.00 |
| 70 | Steel piles, misc.: soldier piles W24X176 (507E00400) | FT | 3,025 | $269.15 | $226.00 | $250.00 | $285.00 | $268.00 |
| 72 | Concrete, misc.:3'-2"X2'-0"X0'-6" precast concrete (511E81300) | EACH | 5 | $515.95 | $770.00 | $600.00 | $850.00 | $500.00 |
| 73 | Concrete, misc.:4'-9"X2'-0"X0'-6" precast concrete (511E81300) | EACH | 10 | $601.26 | $855.00 | $600.00 | $850.00 | $540.00 |
| 74 | Concrete, misc.:5'-9"X2'-0"X0'-6" precast concrete (511E81300) | EACH | 245 | $664.53 | $800.00 | $600.00 | $850.00 | $700.00 |
| 75 | Concrete, misc.:7'-9"X2'-0"X0'-8" precast concrete (511E81300) | EACH | 5 | $837.44 | $1,325.00 | $600.00 | $850.00 | $900.00 |
| 76 | Concrete, misc.:9'-9"X2'-0"X0'-8" precast concrete (511E81300) | EACH | 5 | $837.44 | $1,435.00 | $600.00 | $850.00 | $1,000.00 |
| 77 | Porous backfill, as per plan (518E21101) | CY | 365 | $124.75 | $128.00 | $110.00 | $150.00 | $130.00 |
| 78 | Structure drainage, misc.: double-sided prefabrica (518E62400) | SY | 435 | $17.42 | $87.00 | $50.00 | $55.00 | $50.00 |
| 79 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 2,148 | $96.39 | $125.00 | $120.00 | $165.00 | $250.00 |
| 80 | Drilled shafts, 36" diameter, into bedrock, as per plan (524E94705) | FT | 878 | $199.25 | $165.00 | $125.00 | $200.00 | $350.00 |
| 81 | Special - retaining wall, temporary hardwood laggi (530E50010) | SF | 3,260 | $0.05 | $27.00 | $5.00 | $20.00 | $22.00 |
| 82 | 6" unclassified pipe underdrains, as per plan (605E13301) | FT | 325 | $11.29 | $28.50 | $70.00 | $25.00 | $25.00 |
| 83 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 25 | $15.87 | $75.00 | $30.00 | $27.00 | $75.00 |
| 84 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $347.08 | $845.00 | $350.00 | $500.00 | $380.00 |
| 85 | Steel piles, misc.:soldier piles HP14X89 (507E00400) | FT | 176 | $210.62 | $275.00 | $250.00 | $225.00 | $190.00 |
| 86 | Drilled shafts, 30" diameter, above bedrock, as per plan (524E94603) | FT | 144 | $93.11 | $97.00 | $200.00 | $150.00 | $225.00 |
| 87 | Drilled shafts, 30" diameter into bedrock, as per plan (524E94605) | FT | 33 | $196.23 | $173.00 | $400.00 | $275.00 | $350.00 |
| 88 | Special - retaining wall, temporary hardwood laggi (530E50010) | SF | 1,120 | $0.01 | $29.00 | $30.00 | $20.00 | $19.00 |
| 89 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,817 | $11,500 | $20,000 | $60,000 | $20,000 |
| 90 | Maintaining traffic (614E11000) | LS | 1 | $86,646 | $163,500 | $115,000 | $95,000 | $125,000 |
| 91 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,800.00 | $8,500.00 | $51,000 | $25,000 | $20,000 |
| 92 | Mobilization (624E10000) | LS | 1 | $196,495 | $100,000 | $160,000 | $150,000 | $180,000 |
| 100 | Roads for maintaining traffic (615E10000) | LS | 1 | $33,860 | $30,000 | $56,000 | $50,000 | $150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way