ODOT contract 260417 bid tabulation
LOR-SR 611-03.44 (BRIDGE PAINTING). Let by Ohio DOT on October 29, 2026, LOR. 7 bids received; low bid $17,153,185 by Corrosion Resistance LTD, -18% against the engineer's estimate of $21,000,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 98
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Corrosion Resistance LTD | $17,153,185 | Low | -18% |
| 2 | Vimas Painting Company Inc | $17,298,439 | +1.0% | -18% |
| 3 | 360 Construction Company Inc | $21,867,795 | +27% | +4.0% |
| 4 | Liberty Maintenance Inc | $23,289,999 | +36% | +11% |
| 5 | Legend Painting Inc | $23,910,962 | +39% | +14% |
| 6 | Euro Paint LLC | $27,204,570 | +59% | +30% |
| 7 | Elite Contractors Inc | $33,935,018 | +98% | +62% |
Engineer's estimate: $21,000,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Corrosion Resistance LTD | 2. Vimas Painting Company Inc | 3. 360 Construction Company Inc | 4. Liberty Maintenance Inc | 5. Legend Painting Inc | 6. Euro Paint LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $300,000 | $20,000 | $205,000 | $27,550 | $105,000 | $105,000 |
| 2 | Walk removed (202E30000) | SF | 220 | $10.00 | $4.00 | $3.50 | $21.08 | $3.50 | $3.50 |
| 3 | Guardrail removed (202E38000) | FT | 144 | $5.00 | $6.00 | $5.00 | $6.56 | $6.00 | $5.00 |
| 4 | Bridge terminal assembly removed (202E47000) | EACH | 3 | $110.00 | $120.00 | $110.00 | $144.31 | $110.00 | $110.00 |
| 5 | Fence removed (202E75000) | FT | 400 | $4.00 | $5.00 | $4.00 | $5.25 | $5.00 | $4.00 |
| 6 | Gate removed (202E75250) | EACH | 2 | $220.00 | $250.00 | $220.00 | $288.62 | $240.00 | $220.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 100 | $35.60 | $36.00 | $35.60 | $46.70 | $36.50 | $35.60 |
| 8 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $2,445.00 | $2,500.00 | $2,445.00 | $3,207.61 | $2,545.00 | $2,445.00 |
| 9 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $3,920.00 | $4,000.00 | $3,920.00 | $5,142.67 | $4,050.00 | $3,920.00 |
| 10 | Fence, type CLT (607E23000) | FT | 565 | $37.00 | $38.00 | $37.00 | $48.54 | $40.00 | $37.00 |
| 11 | Gate, type CLT (607E61200) | EACH | 2 | $1,885.00 | $2,000.00 | $1,885.00 | $2,472.94 | $1,985.00 | $1,885.00 |
| 12 | Fenceline seeding and mulching (607E70000) | FT | 565 | $2.00 | $3.00 | $2.00 | $2.62 | $2.70 | $2.00 |
| 13 | 4" concrete walk (608E10000) | SF | 220 | $15.00 | $14.00 | $12.00 | $21.08 | $13.50 | $12.00 |
| 14 | Special - bollard (690E50600) | EACH | 10 | $1,380.00 | $2,000.00 | $1,380.00 | $1,810.43 | $1,750.00 | $1,380.00 |
| 15 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | Catch basin frame and grate, as per plan (611E98651) | EACH | 3 | $2,000.00 | $2,500.00 | $1,950.00 | $3,279.76 | $1,950.00 | $1,950.00 |
| 17 | Pavement planing, asphalt concrete(T=1.5") (254E01000) | SY | 245 | $60.00 | $27.00 | $20.00 | $32.80 | $27.00 | $25.00 |
| 18 | Non-tracking tack coat (407E20000) | GAL | 22 | $3.50 | $7.00 | $50.00 | $6.56 | $6.50 | $5.00 |
| 19 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22000) | CY | 12 | $4,200.00 | $2,700.00 | $2,800.00 | $3,489.66 | $3,500.00 | $2,660.00 |
| 20 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 17 | $850.00 | $800.00 | $850.00 | $1,115.12 | $750.00 | $710.00 |
| 21 | Special - maintain existing lighting (625E40000) | LS | 1 | $10,150 | $15,000 | $10,150 | $13,316 | $4,135.00 | $4,135.00 |
| 22 | Luminaire removed (625E75506) | EACH | 23 | $280.00 | $250.00 | $280.00 | $367.33 | $231.00 | $230.89 |
| 23 | Arc flash calculations and label(EX. CC-1) (625E76000) | EACH | 1 | $1,500.00 | $3,000.00 | $1,500.00 | $1,967.86 | $2,800.00 | $2,795.00 |
| 24 | Lighting, misc.:bridge-mounted marine navigation L (625E98000) | EACH | 6 | $5,900.00 | $4,500.00 | $5,900.00 | $7,740.23 | $3,200.00 | $3,195.00 |
| 25 | Lighting, misc.:replace junction box (625E98000) | EACH | 2 | $6,350.00 | $5,000.00 | $6,350.00 | $8,330.59 | $4,000.00 | $3,950.00 |
| 26 | Lighting, misc.:replace lighting control center (625E98000) | EACH | 1 | $9,800.00 | $15,000 | $9,800.00 | $12,857 | $22,000 | $10,075 |
| 27 | Special - maintain existing navigation lighting (690E98400) | LS | 1 | $9,780.00 | $20,000 | $9,780.00 | $12,830 | $1,500.00 | $1,270.00 |
| 28 | Edge line, 6" (646E10010) | MI | 2.10 | $3,420.00 | $3,420.00 | $3,420.00 | $4,486.71 | $3,420.00 | $3,420.00 |
| 29 | Center line (646E10200) | MI | 0.34 | $4,565.00 | $4,600.00 | $4,565.00 | $5,988.85 | $4,565.00 | $4,565.00 |
| 30 | Transverse/diagonal line (646E10600) | FT | 584 | $8.10 | $9.00 | $8.10 | $10.63 | $8.10 | $8.10 |
| 31 | Bike lane symbol marking (646E20600) | EACH | 14 | $215.00 | $220.00 | $215.00 | $282.06 | $215.00 | $215.00 |
| 32 | Law enforcement officer with patrol car for assistance, as per plan (614E11111) | HR | 50 | $125.00 | $140.00 | $100.00 | $131.19 | $150.00 | $80.00 |
| 33 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 8 | $2,400.00 | $2,400.00 | $2,329.85 | $3,056.54 | $2,340.00 | $2,329.00 |
| 34 | Barrier reflector, type 1ONE way (614E13310) | EACH | 248 | $11.28 | $12.00 | $11.28 | $14.80 | $11.28 | $11.28 |
| 35 | Object marker, one way (614E13350) | EACH | 248 | $21.97 | $22.00 | $21.97 | $28.82 | $21.97 | $21.97 |
| 36 | Work zone center line, class I, 807 paint (614E21050) | MI | 1.40 | $4,440.00 | $4,440.00 | $4,440.00 | $5,824.85 | $4,440.00 | $4,440.00 |
| 37 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 4.30 | $3,375.00 | $3,400.00 | $3,375.00 | $4,427.67 | $3,375.00 | $3,375.00 |
| 38 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 60 | $6.00 | $7.00 | $6.00 | $7.87 | $6.00 | $6.00 |
| 39 | Portable barrier, unanchored (622E41100) | FT | 12,295 | $18.00 | $30.00 | $18.00 | $44.63 | $18.00 | $34.02 |
| 40 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $490,000 | $620,000 | $655,000 | $1,167,594 | $415,800 | $265,000 |
| 41 | Removal misc.:I-section jacking support removal (P (202E98100) | EACH | 14 | $4,200.00 | $3,500.00 | $2,750.00 | $3,607.74 | $4,530.50 | $3,485.00 |
| 42 | Removal misc.:rivet (202E98100) | EACH | 96 | $510.00 | $500.00 | $325.00 | $426.37 | $552.00 | $425.00 |
| 43 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,639 | $18.00 | $15.00 | $14.00 | $16.87 | $14.00 | $14.00 |
| 44 | Concrete repair by epoxy injection (512E10600) | FT | 288 | $110.00 | $120.00 | $110.00 | $126.51 | $110.00 | $500.00 |
| 45 | Special - sealingsealing edges of roadway (512E75000) | FT | 3,536 | $15.00 | $14.00 | $13.50 | $19.68 | $13.50 | $13.50 |
| 46 | Structural steel, misc.:bridge railing bolt replac (513E95030) | EACH | 38 | $610.00 | $620.00 | $200.00 | $262.38 | $656.89 | $505.30 |
| 47 | Structural steel, misc.:new bolt at select gusset (513E95030) | EACH | 88 | $375.00 | $400.00 | $200.00 | $262.38 | $407.74 | $313.65 |
| 48 | Structural steel, misc.:new bolt in open hole (eas (513E95030) | EACH | 262 | $135.00 | $170.00 | $110.00 | $144.31 | $127.07 | $97.75 |
| 49 | Structural steel, misc.:new bolt in open hole (roa (513E95030) | EACH | 26 | $955.00 | $1,000.00 | $95.00 | $124.63 | $1,040.00 | $800.00 |
| 50 | Structural steel, misc.:truss gusset repair (513E95030) | EACH | 7 | $4,878.00 | $6,000.00 | $4,175.00 | $5,477.20 | $3,937.70 | $3,029.00 |
| 51 | Surface preparation of existing structural steel (514E00100) | LS | 1 | $4,900,000 | $5,200,000 | $6,204,480 | $10,149,520 | $8,800,000 | $9,800,000 |
| 52 | Field painting of existing structural steel, prime coat (514E00200) | LS | 1 | $2,500,000 | $1,500,000 | $2,068,160 | $2,176,648 | $2,000,000 | $2,820,567 |
| 53 | Field painting structural steel, intermediate coat (514E00300) | LS | 1 | $1,800,000 | $2,100,000 | $1,837,860 | $1,454,310 | $3,000,000 | $2,820,567 |
| 54 | Field painting structural steel, finish coat, as per plan (514E00401) | LS | 1 | $1,900,000 | $2,100,000 | $1,378,395 | $1,495,515 | $3,000,000 | $2,820,567 |
| 55 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 407 | $68.00 | $150.00 | $100.00 | $128.74 | $60.00 | $50.00 |
| 56 | Final inspection repair (514E10000) | EACH | 174 | $75.00 | $200.00 | $150.00 | $327.98 | $250.00 | $50.00 |
| 57 | Field painting, misc.:epoxy intermediate coat on G (514E27700) | SF | 4,688 | $6.40 | $8.00 | $11.00 | $2.71 | $18.00 | $4.00 |
| 58 | Field painting, misc.:high pressure water cleaning (514E27700) | SF | 15,538 | $3.00 | $4.00 | $8.00 | $0.35 | $1.00 | $1.50 |
| 59 | Field painting, misc.:surface preparation of exist (514E27700) | SF | 851 | $10.25 | $100.00 | $175.00 | $6.48 | $18.00 | $14.00 |
| 60 | Field painting, misc.:surface preparation of exist (514E27700) | SF | 15,538 | $4.50 | $2.00 | $8.00 | $0.35 | $3.00 | $1.50 |
| 61 | Field painting, misc.:top finish coat on galvanize (514E27700) | SF | 15,538 | $4.45 | $4.00 | $6.00 | $2.87 | $6.00 | $1.50 |
| 62 | Field painting, misc.:caulking (514E27710) | FT | 32,144 | $9.00 | $5.00 | $10.00 | $15.28 | $10.00 | $25.00 |
| 63 | Field painting, misc.:field painting of existing S (514E27800) | LS | 1 | $115,000 | $140,000 | $1,054,182 | $128,412 | $450,000 | $1,077,020 |
| 64 | Field painting, misc.:surface preparation of exist (514E27800) | LS | 1 | $185,000 | $540,000 | $1,925,028 | $306,846 | $580,000 | $1,615,530 |
| 65 | Elastomeric strip seal without steel extrusions, as per plan (516E01301) | FT | 134 | $125.00 | $110.00 | $370.00 | $140.56 | $100.00 | $100.00 |
| 66 | Preformed elastomeric compression joint seal (516E10000) | FT | 44 | $205.00 | $200.00 | $191.00 | $309.23 | $191.00 | $191.00 |
| 67 | Preformed elastomeric compression joint seal (516E10000) | FT | 223 | $235.00 | $220.00 | $209.00 | $288.15 | $209.00 | $209.00 |
| 68 | Structural joint or joint sealer, misc.:joint foam (516E14600) | FT | 1,250 | $40.00 | $37.00 | $35.00 | $36.55 | $35.00 | $35.00 |
| 69 | Structural joint or joint sealer, misc.:repair dam (516E14600) | FT | 14 | $1,120.00 | $1,800.00 | $1,120.00 | $1,469.33 | $891.47 | $685.75 |
| 70 | Joint sealer, as per plan (516E31001) | FT | 89 | $31.00 | $32.00 | $30.00 | $56.22 | $30.00 | $30.00 |
| 71 | Elastomeric bearing pad, misc.:1/8" thick elastome (516E42600) | FT | 178 | $72.00 | $500.00 | $247.00 | $94.46 | $400.00 | $237.00 |
| 72 | Railing, misc.:repair of retaining wall pedestrian (517E76302) | EACH | 7 | $1,040.78 | $900.00 | $861.00 | $1,129.55 | $1,114.42 | $857.00 |
| 73 | Structure drainage, misc.:epair damaged deck drain (518E62100) | FT | 7 | $1,088.05 | $1,000.00 | $1,150.00 | $1,508.69 | $1,189.50 | $915.00 |
| 74 | Structure drainage, misc.:NRNS flashing (deck drai (518E62100) | FT | 504 | $772.93 | $510.00 | $650.00 | $852.74 | $598.00 | $460.00 |
| 75 | Structure drainage, misc.:NRNS flashing (deflectio (518E62100) | FT | 340 | $1,070.21 | $580.00 | $925.00 | $1,213.51 | $663.00 | $510.00 |
| 76 | Structure drainage, misc.:NRNS flashing (lower lat (518E62100) | FT | 160 | $357.00 | $340.00 | $225.00 | $295.18 | $390.00 | $300.00 |
| 77 | Structure drainage, misc.:forward abutment drainag (518E63300) | LS | 1 | $9,000.00 | $40,000 | $75,000 | $98,393 | $18,720 | $14,400 |
| 78 | Patching concrete structure (519E11100) | SF | 489 | $200.00 | $220.00 | $200.00 | $196.79 | $200.00 | $650.00 |
| 79 | Approach slabs, misc.:replace curb (526E98200) | FT | 35 | $195.00 | $200.00 | $195.00 | $140.56 | $195.00 | $195.00 |
| 80 | Special - structurespilaster wall reconstruction (530E00200) | LS | 1 | $50,000 | $42,000 | $40,000 | $65,595 | $40,000 | $40,000 |
| 81 | Special - structuressteel mesh removed and replace (530E00200) | LS | 1 | $82,000 | $20,000 | $50,000 | $141.68 | $45,000 | $250,000 |
| 82 | Special - structurespigeon doors removed and reins (530E00400) | EACH | 1,452 | $50.00 | $100.00 | $200.00 | $88.16 | $300.00 | $400.00 |
| 83 | Special - structuresplywood pigeon doors (530E00400) | EACH | 300 | $90.00 | $100.00 | $150.00 | $54.32 | $400.00 | $200.00 |
| 84 | Special - structuresre-tensioning post tension rod (530E00400) | EACH | 2 | $7,070.00 | $10,000 | $7,070.00 | $9,275.16 | $10,000 | $7,070.00 |
| 85 | Special - structuressteel pigeon doors (530E00400) | EACH | 5 | $725.00 | $3,200.00 | $6,000.00 | $1,494.32 | $1,500.00 | $725.00 |
| 86 | Crushed aggregate slope protection (601E20010) | CY | 283 | $135.00 | $140.00 | $135.00 | $196.79 | $135.00 | $135.00 |
| 87 | Structure grounding system, as per plan (625E33001) | EACH | 3 | $3,900.00 | $7,000.00 | $3,900.00 | $5,116.43 | $6,717.00 | $3,350.00 |
| 88 | Patching concrete structures with trowelable mortar, as per plan (843E50001) | SF | 10 | $300.00 | $350.00 | $300.00 | $281.12 | $300.00 | $850.00 |
| 89 | Latex modified concrete overlay, as per plan(1-1/2 (847E10101) | SY | 8,741 | $109.00 | $110.00 | $112.50 | $148.99 | $108.00 | $108.00 |
| 90 | Latex modified concrete overlay (variable thickness), material only, as per plan (847E20101) | CY | 49 | $850.00 | $900.00 | $850.00 | $1,546.17 | $850.00 | $850.00 |
| 91 | Test slab (847E30000) | LS | 1 | $1,950.00 | $2,000.00 | $1,950.00 | $8,433.66 | $1,950.00 | $1,950.00 |
| 92 | Hand chipping (847E50000) | SY | 89 | $180.00 | $200.00 | $180.00 | $203.81 | $180.00 | $180.00 |
| 93 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 94 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $120,000 | $130,000 | $750,000 | $147,100 | $200,000 | $300,000 |
| 95 | CPM progress schedule (108E10000) | LS | 1 | $30,000 | $50,000 | $50,000 | $41,981 | $15,000 | $15,600 |
| 96 | Maintaining traffic (614E11000) | LS | 1 | $400,000 | $200,000 | $550,000 | $184,692 | $150,000 | $105,282 |
| 97 | Construction layout stakes and surveying (623E10000) | LS | 1 | $20,000 | $18,000 | $30,000 | $3,135.45 | $5,000.00 | $10,880 |
| 98 | Mobilization (624E10000) | LS | 1 | $500,000 | $800,000 | $800,000 | $1,047,340 | $1,000,000 | $435,850 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way