ODOT contract 260468 bid tabulation
MAH-SR 46-13.55 (PART 1 AND PART 2) (INTERSECTION). Let by Ohio DOT on October 29, 2026, MAH. 4 bids received; low bid $6,562,795 by Shelly & Sands Inc, -9.4% against the engineer's estimate of $7,242,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 233
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $6,562,795 | Low | -9.0% |
| 2 | Karvo Companies Inc | $7,475,832 | +14% | +3.0% |
| 3 | Xtreme Elements LLC | $8,226,302 | +25% | +14% |
| 4 | S E T Inc | $8,370,000 | +28% | +16% |
Engineer's estimate: $7,242,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Karvo Companies Inc | 3. Xtreme Elements LLC | 4. S E T Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $29,541 | $32,887 | $30,000 | $30,000 |
| 2 | Headwall removed (202E20010) | EACH | 4 | $170.00 | $250.00 | $2,100.00 | $1,000.00 |
| 3 | Pavement removed (202E23000) | SY | 11,444 | $5.25 | $12.00 | $15.00 | $20.00 |
| 4 | Curb removed (202E32000) | FT | 179 | $7.50 | $12.00 | $11.00 | $15.00 |
| 5 | Curb and gutter removed (202E32500) | FT | 4,710 | $2.00 | $13.00 | $12.00 | $12.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 1,220 | $27.00 | $25.00 | $80.00 | $25.00 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 148 | $113.00 | $12.00 | $155.00 | $50.00 |
| 8 | Mailbox removed (202E53100) | EACH | 2 | $140.00 | $25.00 | $130.00 | $250.00 |
| 9 | Manhole removed (202E58000) | EACH | 5 | $877.00 | $500.00 | $1,250.00 | $1,500.00 |
| 10 | Catch basin removed (202E58100) | EACH | 12 | $900.00 | $300.00 | $1,250.00 | $1,200.00 |
| 11 | Excavation (203E10000) | CY | 3,323 | $15.00 | $25.00 | $37.00 | $30.00 |
| 12 | Embankment (203E20000) | CY | 10,132 | $24.00 | $35.00 | $76.00 | $28.00 |
| 13 | Roadway, misc.: #4 washed landscape gravel, (T=4&Q (203E98000) | CY | 13 | $162.00 | $250.00 | $590.00 | $200.00 |
| 14 | Subgrade compaction (204E10000) | SY | 12,825 | $4.00 | $1.00 | $2.70 | $2.00 |
| 15 | Excavation of subgrade, as per plan (204E13001) | CY | 989 | $29.00 | $30.00 | $38.00 | $35.00 |
| 16 | Embankment, as per plan (204E20001) | CY | 702 | $46.00 | $25.00 | $112.00 | $30.00 |
| 17 | Proof rolling (204E45000) | HR | 13 | $325.00 | $250.00 | $268.00 | $375.00 |
| 18 | Monument assembly, type C (623E38500) | EACH | 3 | $3,025.00 | $1,800.00 | $2,380.00 | $1,200.00 |
| 19 | Monument assembly adjusted to grade (623E39500) | EACH | 2 | $1,660.00 | $1,000.00 | $1,875.00 | $950.00 |
| 20 | Special - filter fabric (690E12000) | SY | 119 | $5.25 | $15.00 | $7.00 | $6.00 |
| 21 | Special - mailbox support (690E50000) | EACH | 4 | $580.00 | $220.00 | $540.00 | $500.00 |
| 22 | Special - as-built construction plans (690E91000) | LS | 1 | $6,000.00 | $5,000.00 | $3,700.00 | $1,000.00 |
| 23 | Special - restore timber and mulch (690E98000) | EACH | 2 | $1,800.00 | $500.00 | $1,800.00 | $1,500.00 |
| 24 | Special - survey control verification (690E98400) | LS | 1 | $2,500.00 | $15,000 | $8,100.00 | $5,000.00 |
| 25 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 6 | $230.00 | $300.00 | $195.00 | $170.00 |
| 26 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 28 | $150.00 | $100.00 | $210.00 | $150.00 |
| 27 | Rock channel protection, type C with filter (601E32200) | CY | 7 | $400.00 | $350.00 | $232.00 | $300.00 |
| 28 | Topsoil (659E00300) | CY | 1,328 | $19.00 | $15.00 | $84.00 | $75.00 |
| 29 | Seeding and mulching (659E10000) | SY | 11,964 | $0.90 | $2.00 | $2.50 | $2.00 |
| 30 | Repair seeding and mulching (659E14000) | SY | 598 | $0.90 | $2.00 | $1.50 | $1.00 |
| 31 | Inter-seeding (659E15000) | SY | 598 | $0.50 | $2.00 | $0.15 | $1.00 |
| 32 | Commercial fertilizer (659E20000) | TON | 1.67 | $500.00 | $1,800.00 | $1,050.00 | $550.00 |
| 33 | Lime (659E31000) | ACRE | 2.47 | $1.00 | $0.10 | $52.00 | $50.00 |
| 34 | Water (659E35000) | MGAL | 66 | $0.10 | $65.00 | $1.05 | $10.00 |
| 35 | Ditch erosion protection mat, type B (670E00720) | SY | 945 | $1.80 | $2.50 | $5.50 | $3.00 |
| 36 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,800.00 | $10,000 | $3,900.00 | $2,000.00 |
| 37 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,080 | $15,000 | $15,700 | $10,000 |
| 38 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,568 | $15,000 | $12,500 | $15,000 |
| 39 | Erosion control (832E30000) | EACH | 68,041 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Concrete masonry (602E20000) | CY | 6 | $2,800.00 | $2,500.00 | $3,565.00 | $3,000.00 |
| 41 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 367 | $18.00 | $10.00 | $23.00 | $30.00 |
| 42 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 5,146 | $15.00 | $18.00 | $15.00 | $25.00 |
| 43 | Aggregate drains, as per plan (605E31101) | FT | 50 | $20.00 | $25.00 | $60.00 | $50.00 |
| 44 | 4" conduit, type C (611E00200) | FT | 10 | $39.00 | $25.00 | $40.00 | $30.00 |
| 45 | 4" conduit, type E, as per plan (611E00401) | FT | 200 | $5.00 | $10.00 | $38.00 | $25.00 |
| 46 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 270 | $46.00 | $10.00 | $39.50 | $30.00 |
| 47 | 6" conduit, type B (611E00900) | FT | 50 | $16.00 | $15.00 | $49.30 | $40.00 |
| 48 | 6" conduit, type E (611E01400) | FT | 100 | $20.00 | $10.00 | $40.00 | $30.00 |
| 49 | 6" conduit, type F (611E01500) | FT | 10 | $40.00 | $25.00 | $37.00 | $50.00 |
| 50 | 12" conduit, type B (611E04400) | FT | 746 | $110.00 | $110.00 | $176.00 | $120.00 |
| 51 | 12" conduit, type C (611E04600) | FT | 40 | $128.00 | $75.00 | $116.00 | $110.00 |
| 52 | 12" conduit, type D (611E04900) | FT | 262 | $91.00 | $85.00 | $102.00 | $100.00 |
| 53 | 15" conduit, type B (611E05900) | FT | 82 | $125.00 | $115.00 | $220.00 | $140.00 |
| 54 | 18" conduit, type B (611E07400) | FT | 58 | $114.00 | $140.00 | $178.00 | $165.00 |
| 55 | 18" conduit, type D (611E07900) | FT | 43 | $100.00 | $135.00 | $92.00 | $140.00 |
| 56 | 24" conduit, type B (611E10400) | FT | 24 | $195.00 | $150.00 | $290.00 | $270.00 |
| 57 | 24" conduit, type C (611E10600) | FT | 45 | $222.00 | $125.00 | $272.00 | $230.00 |
| 58 | 36" conduit, type B (611E16400) | FT | 259 | $190.00 | $225.00 | $380.00 | $320.00 |
| 59 | 36" conduit, type B (611E16400) | FT | 16 | $415.00 | $315.00 | $500.00 | $400.00 |
| 60 | Catch basin, no. 3 (611E98150) | EACH | 5 | $5,000.00 | $6,000.00 | $5,300.00 | $4,600.00 |
| 61 | Catch basin, no. 3, as per plan (611E98151) | EACH | 1 | $4,900.00 | $7,500.00 | $5,300.00 | $4,300.00 |
| 62 | Catch basin, no. 3A (611E98180) | EACH | 6 | $4,100.00 | $4,500.00 | $3,400.00 | $3,900.00 |
| 63 | Catch basin, no. 3A, as per plan (611E98181) | EACH | 6 | $4,100.00 | $6,000.00 | $3,400.00 | $3,500.00 |
| 64 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,800.00 | $2,500.00 | $2,650.00 | $3,500.00 |
| 65 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $1,700.00 | $1,000.00 | $1,500.00 | $1,200.00 |
| 66 | Manhole, no. 3 (611E99574) | EACH | 7 | $6,600.00 | $5,000.00 | $5,000.00 | $6,800.00 |
| 67 | Manhole adjusted to grade (611E99654) | EACH | 1 | $1,800.00 | $1,250.00 | $465.00 | $2,200.00 |
| 68 | Precast reinforced concrete outlet (611E99710) | EACH | 3 | $590.00 | $100.00 | $442.00 | $700.00 |
| 69 | Special - miscellaneous metal (611E99820) | LB | 400 | $2.50 | $2.00 | $3.75 | $7.00 |
| 70 | Full depth pavement sawing (252E01500) | FT | 2,544 | $3.50 | $2.00 | $2.15 | $6.00 |
| 71 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,797 | $165.00 | $275.00 | $232.00 | $222.00 |
| 72 | Aggregate base (304E20000) | CY | 2,345 | $81.00 | $100.00 | $94.00 | $96.00 |
| 73 | Non-tracking tack coat (407E20000) | GAL | 3,055 | $3.05 | $3.50 | $2.80 | $3.00 |
| 74 | Prime coat (408E10000) | GAL | 101 | $3.50 | $15.00 | $5.00 | $5.00 |
| 75 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 488 | $272.00 | $350.00 | $309.00 | $295.00 |
| 76 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 4 | $800.00 | $500.00 | $1,655.00 | $1,600.00 |
| 77 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 3 | $1,000.00 | $500.00 | $1,545.00 | $1,600.00 |
| 78 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 388 | $290.00 | $300.00 | $287.00 | $275.00 |
| 79 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 388 | $270.00 | $325.00 | $365.00 | $350.00 |
| 80 | 4" non-reinforced concrete pavement, class QC 1P, as per plan (452E09011) | SY | 1,158 | $80.00 | $65.00 | $165.00 | $85.00 |
| 81 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 338 | $90.00 | $85.00 | $128.00 | $115.00 |
| 82 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 1,361 | $105.00 | $100.00 | $121.00 | $105.00 |
| 83 | 9" non-reinforced concrete pavement, class QC 1P, as per plan (452E13011) | SY | 833 | $120.00 | $135.00 | $220.00 | $145.00 |
| 84 | Combination curb and gutter, type 2 (609E12000) | FT | 3,644 | $35.75 | $35.00 | $46.00 | $40.00 |
| 85 | Curb, type 6 (609E26000) | FT | 3,977 | $26.00 | $25.00 | $28.00 | $30.00 |
| 86 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 819 | $35.00 | $30.00 | $65.00 | $75.00 |
| 87 | Compacted aggregate, as per plan (617E10101) | CY | 56 | $150.00 | $125.00 | $157.00 | $120.00 |
| 88 | Special - pavement overlay fabric composite (690E12060) | SY | 472 | $40.50 | $42.00 | $12.00 | $55.00 |
| 89 | Pavement planing, asphalt concrete, class A, 1.25& (897E01010) | SY | 14,014 | $1.60 | $1.75 | $2.50 | $2.00 |
| 90 | Valve box adjusted to grade (638E10800) | EACH | 1 | $120.00 | $150.00 | $1,250.00 | $1,000.00 |
| 91 | Connection, fused pull apart (625E00450) | EACH | 16 | $120.00 | $125.00 | $130.00 | $145.00 |
| 92 | Connection, unfused pull apart (625E00460) | EACH | 8 | $120.00 | $130.00 | $136.00 | $140.00 |
| 93 | Connection, unfused permanent (625E00480) | EACH | 9 | $120.00 | $115.00 | $121.00 | $85.00 |
| 94 | Light pole, conventional, AT18B40 (625E10490) | EACH | 8 | $3,750.00 | $4,850.00 | $5,110.00 | $4,400.00 |
| 95 | Light pole foundation, 24" X 10' deep (625E14200) | EACH | 8 | $1,250.00 | $2,200.00 | $1,923.00 | $2,300.00 |
| 96 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 681 | $4.00 | $12.00 | $12.65 | $5.00 |
| 97 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 947 | $12.00 | $21.00 | $22.15 | $18.00 |
| 98 | Conduit, 3", 725.04 (625E25500) | FT | 197 | $35.00 | $42.00 | $44.25 | $45.00 |
| 99 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 8 | $450.00 | $550.00 | $580.00 | $600.00 |
| 100 | Trench, 24" deep (625E29002) | FT | 1,034 | $8.00 | $8.00 | $10.00 | $15.00 |
| 101 | Pull box, 725.08, 18" (625E30700) | EACH | 6 | $1,250.00 | $900.00 | $950.00 | $1,200.00 |
| 102 | Ground rod (625E32000) | EACH | 11 | $200.00 | $251.36 | $195.00 | $270.00 |
| 103 | Power service, as per plan (625E34001) | EACH | 1 | $9,000.00 | $6,500.00 | $6,845.00 | $7,000.00 |
| 104 | Underground warning/marking tape, as per plan (625E36011) | FT | 1,034 | $1.00 | $2.00 | $2.20 | $1.00 |
| 105 | Arc flash calculations and label, control center (625E76000) | EACH | 1 | $500.00 | $3,500.00 | $3,685.00 | $1,200.00 |
| 106 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 3 | $95.00 | $125.00 | $126.00 | $130.00 |
| 107 | RPM (621E00100) | EACH | 206 | $33.50 | $40.50 | $45.50 | $55.00 |
| 108 | RPM, as per plan (621E00101) | EACH | 61 | $33.50 | $45.00 | $45.00 | $55.00 |
| 109 | Raised pavement marker removed (621E54000) | EACH | 39 | $15.00 | $1.00 | $7.20 | $40.00 |
| 110 | Raised pavement marker removed, as per plan (621E54001) | EACH | 61 | $9.00 | $5.00 | $7.20 | $30.00 |
| 111 | Ground mounted support, no. 3 post (630E03100) | FT | 547 | $17.00 | $12.75 | $12.75 | $20.00 |
| 112 | Sign post reflector (630E08600) | EACH | 19 | $45.00 | $45.00 | $46.00 | $50.00 |
| 113 | Overhead sign support, type TC-16.22, design 7 (630E72520) | EACH | 2 | $19,720 | $19,720 | $20,305 | $21,000 |
| 114 | Sign attachment assembly (630E75000) | EACH | 7 | $265.00 | $550.00 | $555.00 | $280.00 |
| 115 | Sign, flat sheet (630E80100) | SF | 338 | $19.50 | $20.00 | $25.00 | $22.00 |
| 116 | Rigid overhead sign support foundation (630E84510) | EACH | 2 | $8,575.00 | $8,575.00 | $8,830.00 | $9,000.00 |
| 117 | Removal of ground mounted sign and disposal (630E84900) | EACH | 13 | $15.00 | $15.00 | $15.50 | $20.00 |
| 118 | Removal of structure mounted sign and reerection, as per plan (630E86321) | EACH | 1 | $1,480.00 | $1,480.00 | $1,525.00 | $1,600.00 |
| 119 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 8 | $95.00 | $50.00 | $55.00 | $110.00 |
| 120 | Removal of pole mounted sign and disposal (630E87500) | EACH | 3 | $35.00 | $50.00 | $55.00 | $40.00 |
| 121 | Removal of overhead sign support and disposal, type TC-16.21 (630E89704) | EACH | 2 | $1,975.00 | $1,975.00 | $55.00 | $2,100.00 |
| 122 | Edge line, 6" (646E10010) | MI | 0.73 | $4,200.00 | $4,200.00 | $3,800.00 | $4,100.00 |
| 123 | Lane line, 6" (646E10110) | MI | 0.05 | $4,500.00 | $4,500.00 | $4,000.00 | $1,300.00 |
| 124 | Lane line, 6", as per plan (646E10111) | MI | 0.11 | $5,500.00 | $5,500.00 | $4,000.00 | $6,100.00 |
| 125 | Center line (646E10200) | MI | 0.85 | $4,500.00 | $4,500.00 | $4,650.00 | $5,600.00 |
| 126 | Center line, as per plan (646E10201) | MI | 0.47 | $5,500.00 | $5,500.00 | $4,650.00 | $12,000 |
| 127 | Channelizing line, 12" (646E10310) | FT | 1,198 | $1.80 | $1.80 | $2.00 | $2.00 |
| 128 | Channelizing line, 12", as per plan (646E10311) | FT | 215 | $2.00 | $2.00 | $2.00 | $4.00 |
| 129 | Stop line (646E10400) | FT | 12 | $13.00 | $13.00 | $13.50 | $15.00 |
| 130 | Stop line, as per plan (646E10401) | FT | 24 | $15.00 | $15.00 | $13.50 | $18.00 |
| 131 | Transverse/diagonal line (646E10600) | FT | 449 | $9.00 | $9.00 | $9.25 | $14.00 |
| 132 | Chevron marking (646E10620) | FT | 46 | $11.00 | $11.00 | $11.50 | $14.00 |
| 133 | Lane arrow (646E20300) | EACH | 25 | $169.00 | $169.00 | $175.00 | $195.00 |
| 134 | Lane arrow, as per plan (646E20301) | EACH | 6 | $179.00 | $179.00 | $175.00 | $415.00 |
| 135 | Lane reduction arrow (646E20350) | EACH | 2 | $300.00 | $300.00 | $175.00 | $400.00 |
| 136 | Dotted line, 6" (646E20504) | FT | 537 | $1.75 | $1.75 | $2.50 | $2.00 |
| 137 | Yield line (646E20800) | FT | 191 | $12.00 | $12.00 | $12.00 | $3.00 |
| 138 | Conduit, 3", 725.04 (625E25500) | FT | 37 | $40.75 | $42.00 | $44.30 | $50.00 |
| 139 | Conduit, 4", 725.04 (625E25600) | FT | 20 | $50.00 | $56.00 | $59.00 | $65.00 |
| 140 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 219 | $65.00 | $120.00 | $126.00 | $110.00 |
| 141 | Trench, 30" deep (625E29010) | FT | 45 | $20.00 | $20.00 | $27.00 | $15.00 |
| 142 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,200.00 | $900.00 | $948.00 | $1,200.00 |
| 143 | Ground rod (625E32000) | EACH | 5 | $200.00 | $185.00 | $195.00 | $270.00 |
| 144 | Underground warning/marking tape, as per plan (625E36011) | FT | 45 | $1.00 | $2.00 | $2.25 | $1.00 |
| 145 | Arc flash calculations and label, control center (625E76000) | EACH | 1 | $500.00 | $3,400.00 | $3,600.00 | $1,200.00 |
| 146 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 9 | $950.00 | $1,275.00 | $1,345.00 | $1,300.00 |
| 147 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 1 | $1,700.00 | $2,000.00 | $2,110.00 | $2,200.00 |
| 148 | Covering of vehicular signal head (632E25000) | EACH | 10 | $25.00 | $25.00 | $26.50 | $60.00 |
| 149 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 1,809 | $4.00 | $8.00 | $8.50 | $4.00 |
| 150 | Signal support foundation (632E64010) | EACH | 4 | $8,000.00 | $4,700.00 | $5,000.00 | $9,000.00 |
| 151 | Power service, as per plan (632E70001) | EACH | 1 | $4,000.00 | $3,100.00 | $3,265.00 | $5,000.00 |
| 152 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 2 | $13,250 | $13,800 | $16,500 | $20,000 |
| 153 | Signal support, type TC-81.22, design 12 (632E72130) | EACH | 2 | $16,500 | $17,500 | $19,550 | $22,000 |
| 154 | Removal of traffic signal installation (632E90100) | EACH | 2 | $3,000.00 | $5,000.00 | $5,265.00 | $6,000.00 |
| 155 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $19,500 | $21,000 | $22,200 | $25,000 |
| 156 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $2,500.00 | $2,400.00 | $2,000.00 | $3,000.00 |
| 157 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,500.00 | $600.00 | $3,420.00 | $700.00 |
| 158 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $7,500.00 | $7,000.00 | $7,370.00 | $11,000 |
| 159 | Atc controller, as per plan (809E69123) | EACH | 1 | $5,250.00 | $6,000.00 | $6,320.00 | $8,000.00 |
| 160 | ITS device, misc.:reuse communication device (809E65990) | EACH | 1 | $500.00 | $500.00 | $530.00 | $1,000.00 |
| 161 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $10,000 | $9,900.00 | $10,450 | $13,000 |
| 162 | Stop line radar detection, as per plan (809E69101) | EACH | 3 | $10,000 | $9,700.00 | $10,300 | $13,000 |
| 163 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $92.00 | $150.00 | $86.00 | $90.00 |
| 164 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 5 | $2,125.00 | $2,550.00 | $2,600.00 | $2,300.00 |
| 165 | Detour signing (614E12420) | LS | 1 | $22,750 | $25,000 | $23,300 | $50,000 |
| 166 | Barrier reflector, type 1 (one way) (614E13310) | EACH | 40 | $7.50 | $7.50 | $7.50 | $15.00 |
| 167 | Object marker, one way (614E13350) | EACH | 40 | $15.00 | $15.00 | $15.00 | $25.00 |
| 168 | Portable changeable message sign, as per plan (614E18601) | SNMT | 28 | $975.00 | $975.00 | $1,000.00 | $1,200.00 |
| 169 | Work zone lane line, class I, 6" (614E20010) | MI | 0.48 | $1,000.00 | $1,000.00 | $1,025.00 | $1,000.00 |
| 170 | Work zone center line, class I (614E21000) | MI | 1.21 | $1,500.00 | $1,500.00 | $1,540.00 | $2,000.00 |
| 171 | Work zone edge line, class I, 6" (614E22010) | MI | 3.69 | $1,250.00 | $1,250.00 | $1,280.00 | $1,700.00 |
| 172 | Work zone channelizing line, class I, 12" (614E23010) | FT | 120 | $2.00 | $2.00 | $2.20 | $5.00 |
| 173 | Work zone dotted line, class I (614E24000) | FT | 1,987 | $1.00 | $1.00 | $1.15 | $2.00 |
| 174 | Work zone stop line, class I (614E26000) | FT | 67 | $5.00 | $5.00 | $5.50 | $4.00 |
| 175 | Work zone arrow, class I (614E30000) | EACH | 15 | $100.00 | $100.00 | $105.00 | $80.00 |
| 176 | Business entrance sign, as per plan (614E40051) | EACH | 1 | $150.00 | $150.00 | $155.00 | $300.00 |
| 177 | Roads for maintaining traffic (615E10000) | LS | 1 | $42,000 | $50,000 | $26,750 | $170,000 |
| 178 | Pavement for maintaining traffic, class B (615E25000) | SY | 2,869 | $51.00 | $50.00 | $68.00 | $135.00 |
| 179 | Water (616E10000) | MGAL | 44 | $90.00 | $5.00 | $8.00 | $50.00 |
| 180 | Portable barrier, unanchored (622E41100) | FT | 1,750 | $22.00 | $44.00 | $31.00 | $40.00 |
| 181 | Walk removed (202E30000) | SF | 275 | $3.00 | $5.00 | $1.25 | $5.00 |
| 182 | Curb removed (202E32000) | FT | 55 | $15.00 | $25.00 | $4.00 | $10.00 |
| 183 | 4" concrete walk (608E10000) | SF | 64 | $15.00 | $20.00 | $12.25 | $30.00 |
| 184 | Curb ramp, as per plan (608E52001) | SF | 270 | $40.00 | $20.00 | $38.50 | $40.00 |
| 185 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 5 | $1,600.00 | $2,000.00 | $2,115.00 | $1,200.00 |
| 186 | Special - as-built construction plans (690E91000) | LS | 1 | $2,800.00 | $2,500.00 | $1,500.00 | $1,000.00 |
| 187 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 188 | Catch basin adjusted to grade (611E98630) | EACH | 5 | $1,900.00 | $1,000.00 | $353.00 | $2,000.00 |
| 189 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 15 | $1,700.00 | $1,750.00 | $470.00 | $2,800.00 |
| 190 | Special - miscellaneous metal (611E99820) | LB | 400 | $2.40 | $3.00 | $3.75 | $7.00 |
| 191 | Partial depth pavement repair (441) (251E01000) | SY | 2,000 | $43.00 | $65.00 | $66.50 | $65.00 |
| 192 | Partial depth pavement repair (441) (251E01000) | SY | 250 | $260.00 | $125.00 | $66.50 | $142.00 |
| 193 | Patching planed surface (254E01600) | SY | 1,000 | $10.00 | $0.25 | $1.50 | $2.00 |
| 194 | Non-tracking tack coat (407E20000) | GAL | 11,355 | $3.05 | $3.50 | $2.80 | $3.00 |
| 195 | Prime coat (408E10000) | GAL | 2,441 | $3.50 | $6.00 | $5.00 | $5.00 |
| 196 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 4,910 | $272.00 | $300.00 | $310.00 | $285.00 |
| 197 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 20 | $800.00 | $500.00 | $885.00 | $840.00 |
| 198 | Curb, type 6 (609E26000) | FT | 30 | $50.00 | $45.00 | $67.00 | $100.00 |
| 199 | Compacted aggregate (617E10100) | CY | 170 | $150.00 | $125.00 | $158.00 | $120.00 |
| 200 | Pavement planing, asphalt concrete, class A (T = 1 (897E01010) | SY | 85,442 | $1.60 | $2.00 | $2.25 | $2.00 |
| 201 | Pavement planing, asphalt concrete, class A (T = 1 (897E01010) | SY | 56,490 | $1.20 | $1.50 | $1.80 | $2.00 |
| 202 | Valve box adjusted to grade (638E10800) | EACH | 10 | $120.00 | $250.00 | $1,250.00 | $800.00 |
| 203 | RPM (621E00100) | EACH | 948 | $33.25 | $39.00 | $44.50 | $55.00 |
| 204 | Raised pavement marker removed (621E54000) | EACH | 763 | $10.00 | $1.00 | $7.00 | $40.00 |
| 205 | Edge line, 6" (646E10010) | MI | 5.46 | $3,320.00 | $3,320.00 | $3,760.00 | $4,100.00 |
| 206 | Lane line, 6" (646E10110) | MI | 5.08 | $1,870.00 | $1,870.00 | $3,956.00 | $1,300.00 |
| 207 | Center line (646E10200) | MI | 5.28 | $3,920.00 | $3,920.00 | $4,640.00 | $5,600.00 |
| 208 | Channelizing line, 12" (646E10310) | FT | 5,050 | $1.50 | $1.50 | $1.75 | $3.00 |
| 209 | Stop line (646E10400) | FT | 828 | $11.50 | $11.50 | $13.25 | $15.00 |
| 210 | Crosswalk line, 24" (646E10520) | FT | 308 | $11.50 | $11.50 | $11.50 | $12.00 |
| 211 | Transverse/diagonal line (646E10600) | FT | 75 | $9.00 | $9.00 | $9.00 | $15.00 |
| 212 | Island marking (646E10800) | SF | 114 | $9.00 | $9.00 | $9.00 | $10.00 |
| 213 | Lane arrow (646E20300) | EACH | 98 | $150.00 | $150.00 | $170.00 | $200.00 |
| 214 | Dotted line, 6" (646E20504) | FT | 120 | $3.00 | $3.00 | $2.45 | $5.00 |
| 215 | Advance radar detection, as per plan (809E69001) | EACH | 6 | $10,000 | $9,900.00 | $10,423 | $13,000 |
| 216 | Stop line radar detection, as per plan (809E69101) | EACH | 20 | $9,500.00 | $9,700.00 | $10,220 | $13,000 |
| 217 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $92.00 | $150.00 | $86.00 | $90.00 |
| 218 | Work zone marking sign (614E12460) | EACH | 25 | $80.00 | $80.00 | $82.00 | $200.00 |
| 219 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $800.00 | $366.53 | $1,650.00 | $400.00 |
| 220 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $975.00 | $975.00 | $1,000.00 | $1,100.00 |
| 221 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 5.08 | $599.00 | $599.00 | $1,025.00 | $850.00 |
| 222 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 5.08 | $576.00 | $576.00 | $1,025.00 | $750.00 |
| 223 | Work zone center line, class I, 642 paint (614E21100) | MI | 5.28 | $1,200.00 | $1,200.00 | $1,535.00 | $2,000.00 |
| 224 | Work zone center line, class III, 642 paint (614E21550) | MI | 5.28 | $1,000.00 | $1,000.00 | $1,536.00 | $1,500.00 |
| 225 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 5.46 | $660.00 | $660.00 | $1,280.00 | $700.00 |
| 226 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 5,050 | $0.70 | $0.69 | $2.20 | $2.00 |
| 227 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 5,050 | $0.70 | $0.68 | $2.20 | $2.00 |
| 228 | Work zone stop line, class I, 642 paint (614E26200) | FT | 828 | $3.10 | $3.10 | $5.50 | $4.00 |
| 229 | Work zone stop line, class III, 642 paint (614E26610) | FT | 828 | $3.00 | $3.00 | $5.50 | $4.00 |
| 230 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $75,000 | $63,000 | $69,799 |
| 231 | Maintaining traffic (614E11000) | LS | 1 | $381,417 | $250,000 | $125,000 | $536,000 |
| 232 | Construction layout stakes and surveying (623E10000) | LS | 1 | $42,000 | $150,000 | $58,000 | $90,000 |
| 233 | Mobilization (624E10000) | LS | 1 | $333,700 | $400,000 | $105,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.