ODOT contract 260465 bid tabulation
HOL-US 62-30.74 (SLIDE REPAIR). Let by Ohio DOT on October 29, 2026, HOL. 5 bids received; low bid $482,245 by Dennison Bridge Inc, -16% against the engineer's estimate of $573,000.
- Owner
- Ohio DOT
- Letting
- 29 OCT 2026
- Pay items
- 54
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Dennison Bridge Inc | $482,245 | Low | -16% |
| 2 | Alan Stone Co Inc | $524,559 | +9.0% | -8.0% |
| 3 | Shelly & Sands Inc | $605,422 | +26% | +6.0% |
| 4 | Craig Edward Susany Inc | $686,283 | +42% | +20% |
| 5 | Ohio-West Virginia Excavating Co | $687,221 | +43% | +20% |
Engineer's estimate: $573,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dennison Bridge Inc | 2. Alan Stone Co Inc | 3. Shelly & Sands Inc | 4. Craig Edward Susany Inc | 5. Ohio-West Virginia Excavating Co |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100.00 | $2,700.00 | $2,000.00 | $100.00 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 500 | $20.00 | $20.00 | $17.00 | $25.00 | $52.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 20 | $30.00 | $20.00 | $29.00 | $10.00 | $145.00 |
| 4 | Guardrail removed, as per plan (202E38001) | FT | 250 | $3.00 | $4.50 | $4.00 | $3.00 | $17.00 |
| 5 | Removal misc.: gabion wall (202E98000) | LS | 1 | $2,500.00 | $3,500.00 | $4,500.00 | $5,000.00 | $700.00 |
| 6 | Embankment (203E20000) | CY | 256 | $30.00 | $20.00 | $24.00 | $15.00 | $52.00 |
| 7 | Subgrade compaction (204E10000) | SY | 528 | $3.00 | $3.00 | $6.00 | $5.00 | $3.00 |
| 8 | Guardrail, type MGS half post spacing (606E15150) | FT | 250 | $56.50 | $60.00 | $51.20 | $56.00 | $64.00 |
| 9 | Special - mailbox support system, single (690E50100) | EACH | 2 | $260.00 | $290.00 | $245.00 | $100.00 | $770.00 |
| 10 | Special - mailbox support system, double (690E50200) | EACH | 1 | $350.00 | $390.00 | $330.00 | $150.00 | $950.00 |
| 11 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 3 | $400.00 | $260.00 | $650.00 | $500.00 | $1,100.00 |
| 12 | Soil analysis test (659E00100) | EACH | 2 | $100.00 | $1,400.00 | $150.00 | $10.00 | $175.00 |
| 13 | Topsoil (659E00300) | CY | 43 | $30.00 | $25.00 | $62.00 | $50.00 | $150.00 |
| 14 | Seeding and mulching, as per plan (659E10001) | SY | 389 | $5.00 | $10.00 | $8.00 | $9.00 | $9.00 |
| 15 | Repair seeding and mulching (659E14000) | SY | 19 | $5.00 | $5.00 | $1.90 | $9.00 | $2.00 |
| 16 | Inter-seeding (659E15000) | SY | 19 | $1.00 | $0.10 | $2.90 | $4.00 | $3.00 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.05 | $1,000.00 | $1,400.00 | $1,250.00 | $1,500.00 | $1,500.00 |
| 18 | Lime (659E31000) | ACRE | 0.08 | $200.00 | $70.00 | $150.00 | $175.00 | $180.00 |
| 19 | Water (659E35000) | MGAL | 3 | $1.00 | $1.50 | $1.00 | $1.00 | $1.00 |
| 20 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 21 | 18" conduit, type B (611E07400) | FT | 10 | $400.00 | $840.00 | $400.00 | $500.00 | $295.00 |
| 22 | Precast reinforced concrete outlet, as per plan (611E99711) | EACH | 1 | $400.00 | $450.00 | $400.00 | $300.00 | $1,700.00 |
| 23 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 154 | $300.00 | $300.00 | $275.00 | $300.00 | $348.00 |
| 24 | Aggregate base (304E20000) | CY | 89 | $150.00 | $110.00 | $99.00 | $300.00 | $120.00 |
| 25 | Tack coat (407E10000) | GAL | 84 | $2.75 | $5.00 | $3.50 | $3.00 | $3.00 |
| 26 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 18 | $600.00 | $400.00 | $550.00 | $600.00 | $650.00 |
| 27 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 24 | $400.00 | $400.00 | $425.00 | $400.00 | $450.00 |
| 28 | RPM (621E00100) | EACH | 6 | $40.00 | $580.00 | $500.00 | $400.00 | $550.00 |
| 29 | Raised pavement marker removed (621E54000) | EACH | 6 | $10.00 | $40.00 | $20.00 | $5.00 | $26.00 |
| 30 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 5 | $15.00 | $20.00 | $15.00 | $15.00 | $29.00 |
| 31 | Edge line, 6" (646E10010) | MI | 0.05 | $37,000 | $47,000 | $40,000 | $40,000 | $45,000 |
| 32 | Center line (646E10200) | MI | 0.05 | $37,000 | $53,000 | $45,000 | $40,000 | $50,000 |
| 33 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,400.00 | $3,400.00 | $2,920.00 | $3,000.00 | $3,200.00 |
| 34 | Barrier reflector, type 1 (bidirectional) (614E13310) | EACH | 11 | $15.00 | $40.00 | $12.00 | $15.00 | $40.00 |
| 35 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.11 | $12,000 | $8,500.00 | $7,250.00 | $12,000 | $8,400.00 |
| 36 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.11 | $12,000 | $8,000.00 | $6,850.00 | $12,000 | $8,000.00 |
| 37 | Work zone stop line, class III, 642 paint (614E26610) | FT | 24 | $15.00 | $15.00 | $14.00 | $9.00 | $16.00 |
| 38 | Water (616E10000) | MGAL | 10 | $1.00 | $120.00 | $70.00 | $1.00 | $1.00 |
| 39 | Portable barrier, unanchored (622E41100) | FT | 560 | $14.00 | $30.00 | $47.00 | $35.00 | $55.00 |
| 40 | Unclassified excavation, as per plan (503E21101) | CY | 1,463 | $20.00 | $25.00 | $15.00 | $35.00 | $22.00 |
| 41 | Steel piles HP12X53, furnished (507E00200) | FT | 1,230 | $65.00 | $65.00 | $67.50 | $80.00 | $74.00 |
| 42 | Class QC1 concrete, footing, as per plan (511E46511) | CY | 30 | $400.00 | $320.00 | $750.00 | $1,000.00 | $544.00 |
| 43 | Porous backfill with geotextile fabric (518E21200) | CY | 130 | $120.00 | $250.00 | $225.00 | $185.00 | $155.00 |
| 44 | 6" perforated corrugated plastic pipe (518E40000) | FT | 205 | $12.00 | $6.50 | $3.00 | $10.00 | $7.00 |
| 45 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 16 | $12.00 | $40.00 | $35.00 | $25.00 | $6.00 |
| 46 | Drilled shafts, 24" diameter, above bedrock, as per plan (524E94503) | FT | 687 | $55.00 | $35.00 | $55.00 | $100.00 | $60.00 |
| 47 | Drilled shafts, 24" diameter, into bedrock, as per plan (524E94505) | FT | 410 | $70.00 | $70.00 | $95.00 | $120.00 | $68.00 |
| 48 | Special - retaining wall, cast-in-place concrete L (530E50010) | SF | 57 | $100.00 | $50.00 | $120.00 | $100.00 | $161.00 |
| 49 | Special - retaining wall, precast concrete lagging (530E51010) | SF | 1,950 | $26.00 | $25.00 | $40.00 | $36.00 | $30.00 |
| 50 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,000.00 | $5,000.00 | $3,464.55 | $20,000 | $9,000.00 |
| 51 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $35,000 | $47,000 | $48,500 | $45,000 | $79,000 |
| 52 | Field office, type B (619E16010) | MNTH | 4 | $1,600.00 | $2,100.00 | $6,000.00 | $3,500.00 | $3,025.00 |
| 53 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $3,000.00 | $8,800.00 | $9,000.00 | $1,500.00 | $3,500.00 |
| 54 | Mobilization (624E10000) | LS | 1 | $17,000 | $18,000 | $30,000 | $20,000 | $54,750 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way