Dennison Bridge Inc: ODOT bid record

Dennison Bridge Inc submitted 58 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 OCT 2026, and was the low bidder on 18 of them (31%). When it was not low, its total sat a median +20% above the low bid.

Owner
Ohio DOT
Low bid volume
$8,060,458
Latest bid
29 OCT 2026
Data through
12 NOV 2026
58Bids
18Low bids
31Win rate, percent
+20%Median gap to the low bid when not low, 40 bids

By year

YearBidsLow bidsWin rate
202020630%
202114214%
20226350%
20234375%
20246233%
2025400%
20264250%
Dennison Bridge Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL23730%
HAS11327%
HOL7457%
COL3133%
JEF3133%
TUS3267%
MOE200%
PIK100%
ROS100%
DEF100%
NOB100%
WAY100%
Dennison Bridge Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5959 (100%)$1.00$1.00
Guardrail removed202E38000FT4431 (70%)$2.00$2.50
Water659E35000MGAL3324 (73%)$1.00$1.00
Portable barrier, unanchored622E41100FT2618 (69%)$16.00$24.34
Asphalt concrete for maintaining traffic614E13000CY2613 (50%)$167.50$250.00
Subgrade compaction204E10000SY5411 (20%)$3.00$3.00
Raised pavement marker removed621E54000EACH4110 (24%)$20.00$12.00
Work zone impact attenuator, 24" wide hazards, (bidirectional)614E12384EACH2310 (43%)$2,500.00$2,300.00
Barrier reflector, type 2 (bidirectional)626E00110EACH298 (28%)$10.00$11.00
Work zone edge line, class III, 6", 642 paint614E22360MI248 (33%)$6,000.00$886.50
Soil analysis test659E00100EACH238 (35%)$100.00$115.50
Water616E10000MGAL208 (40%)$10.00$20.00
Dennison Bridge Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Dennison Bridge Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026260465HOLHOL-US 62-30.74 (SLIDE REPAIR)1 of 5$482,245Low, 9.0% under the second
13 AUG 2026260362HASHAS-SR 646-01.94 (SLIDE REPAIR)1 of 6$783,385Low, 4.0% under the second
25 JUN 2026260313HASHAS-SR 9-10.24 (SLIDE REPAIR)4 of 5$618,885+17%
29 JAN 2026260054JEFJEF-US 22-06.99 (SLIDE REPAIR)8 of 8$796,756+57%
22 MAY 2025250273COSCOS-SR 93-00.75 (SLIDE REPAIR)4 of 4$2,492,993+29%
08 MAY 2025250264WAYWAY-SR 241-01.32 (SLIDE REPAIR)3 of 4$443,983+7.0%
27 FEB 2025250115BELBEL-SR 647-03.29 (SLIDE REPAIR)4 of 5$693,737+12%
16 JAN 2025250037HOLHOL-SR 515-00.15 (CULVERT REPLACEMENT)4 of 5$874,809+47%
26 SEP 2024240451BELBEL-SR 379-02.23 (SLIDE REPAIR)3 of 5$484,746+1.0%
09 MAY 2024240271HASHAS-US 22-05.43 (SLIDE REPAIR)1 of 5$408,062Low, 13% under the second
09 MAY 2024240281NOBNOB-SR 147-09.93 (SLIDE REPAIR)3 of 4$628,680+10%
18 APR 2024240250BELBEL-SR 379-06.34 (SLIDE REPAIR)1 of 4$507,590Low, 12% under the second
21 MAR 2024240164BELBEL-US 250-09.08 (SLIDE REPAIR)4 of 5$336,505+23%
11 JAN 2024240003BELBEL-SR 147-02.84 (SLIDE REPAIR)4 of 5$2,344,425+12%
27 APR 2023230250BELBEL-US 250-06.45 (SLIDE REPAIR)1 of 5$442,449Low, 0.0% under the second
13 APR 2023230208BELBEL-US 250-07.90 (SLIDE REPAIR)1 of 6$503,740Low, 6.0% under the second
26 JAN 2023230062TUSTUS-SR 800-03.82 (DEMOLITION)1 of 7$545,549Low, 24% under the second
12 JAN 2023230005BELBEL-SR 800-01.57 (SLIDE REPAIR)3 of 4$466,054+10%
15 DEC 2022220680HASHAS-SR 258-01.11 (SLIDE REPAIR)1 of 4$386,784Low, 10% under the second
25 AUG 2022220486HASHAS-US 22-03.59 (SLIDE REPAIR)2 of 5$883,982+9.0%
16 JUN 2022220381BELBEL-US 250-08.10 (SLIDE REPAIR)1 of 5$272,224Low, 9.0% under the second
16 JUN 2022220390HASHAS-US 22-01.86 (SLIDE REPAIR)2 of 5$343,079+3.0%
28 APR 2022220286HASHAS-SR 151-24.96 (SLIDE REPAIR)2 of 6$1,288,276+4.0%
31 MAR 2022220227HOLHOL-US 62-15.03 (SLIDE REPAIR)1 of 5$542,546Low, 1.0% under the second
18 NOV 2021210606HASHAS-US 22-05.87 (SLIDE REPAIR)3 of 8$557,674+15%
Dennison Bridge Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy