ODOT contract 250264 bid tabulation
WAY-SR 241-01.32 (SLIDE REPAIR). Let by Ohio DOT on May 8, 2025, WAY. 4 bids received; low bid $413,296 by Ohio-West Virginia Excavating Co, -12% against the engineer's estimate of $471,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 53
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ohio-West Virginia Excavating Co | $413,296 | Low | -12% |
| 2 | Alan Stone Co Inc | $418,075 | +1.0% | -11% |
| 3 | Dennison Bridge Inc | $443,983 | +7.0% | -6.0% |
| 4 | Craig Edward Susany Inc | $505,678 | +22% | +7.0% |
Engineer's estimate: $471,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ohio-West Virginia Excavating Co | 2. Alan Stone Co Inc | 3. Dennison Bridge Inc | 4. Craig Edward Susany Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $6,000.00 | $12,000 | $5,000.00 | $1,000.00 |
| 2 | Pavement removed (202E23000) | SY | 69 | $44.00 | $15.00 | $25.00 | $25.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 38 | $58.00 | $10.00 | $30.00 | $25.00 |
| 4 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $167.00 | $410.00 | $100.00 | $250.00 |
| 5 | Mailbox removed (202E53100) | EACH | 3 | $475.00 | $140.00 | $10.00 | $25.00 |
| 6 | Fence removed (202E75000) | FT | 635 | $3.00 | $2.00 | $2.00 | $2.00 |
| 7 | Excavation (203E10000) | CY | 97.10 | $58.62 | $25.00 | $15.00 | $25.00 |
| 8 | Embankment (203E20000) | CY | 128.10 | $29.00 | $20.00 | $20.00 | $25.00 |
| 9 | Subgrade compaction (204E10000) | SY | 73 | $17.00 | $4.00 | $10.00 | $10.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 562.50 | $22.00 | $20.00 | $21.00 | $22.00 |
| 11 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,800.00 | $2,700.00 | $2,600.00 | $3,000.00 |
| 12 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,500.00 | $1,500.00 | $1,450.00 | $1,500.00 |
| 13 | Fence, type 47 (607E15000) | FT | 635 | $21.00 | $20.00 | $20.00 | $25.00 |
| 14 | Fence, misc.: crossing, type 2 (607E98100) | EACH | 1 | $1,400.00 | $1,500.00 | $1,300.00 | $1,000.00 |
| 15 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,600.00 | $3,500.00 | $750.00 | $5,500.00 |
| 16 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,600.00 | $3,500.00 | $750.00 | $600.00 |
| 17 | Special - mailbox support system, single (690E50100) | EACH | 3 | $245.00 | $250.00 | $230.00 | $1,500.00 |
| 18 | Special - inclinometer (690E98000) | EACH | 1 | $4,800.00 | $1,500.00 | $3,000.00 | $3,400.00 |
| 19 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 33.30 | $140.00 | $140.00 | $175.00 | $200.00 |
| 20 | Soil analysis test (659E00100) | EACH | 2 | $167.00 | $150.00 | $100.00 | $15.00 |
| 21 | Topsoil (659E00300) | CY | 69 | $164.00 | $20.00 | $40.00 | $80.00 |
| 22 | Seeding and mulching (659E10000) | SY | 623 | $7.00 | $2.50 | $4.00 | $7.00 |
| 23 | Repair seeding and mulching (659E14000) | SY | 31 | $7.00 | $20.00 | $4.00 | $7.00 |
| 24 | Inter-seeding (659E15000) | SY | 31 | $7.00 | $20.00 | $4.00 | $4.00 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.08 | $1,400.00 | $630.00 | $1,000.00 | $1,000.00 |
| 26 | Lime (659E31000) | ACRE | 0.13 | $170.00 | $800.00 | $100.00 | $600.00 |
| 27 | Water (659E35000) | MGAL | 3.44 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | Slope erosion protection mat, type B (670E00520) | SY | 124 | $5.00 | $20.00 | $4.00 | $5.00 |
| 29 | Erosion control (832E30000) | EACH | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 30 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $7,200.00 | $500.00 | $1,000.00 | $6,000.00 |
| 31 | Concrete masonry (602E20000) | CY | 0.46 | $4,700.00 | $2,400.00 | $2,500.00 | $3,000.00 |
| 32 | 24" conduit, type A (611E10200) | FT | 49 | $291.00 | $290.00 | $275.00 | $300.00 |
| 33 | Pavement planing, asphalt concrete (3.0") (254E01000) | SY | 139 | $21.00 | $35.00 | $25.00 | $40.00 |
| 34 | Asphalt concrete base, (449), as per plan (PG64-22 (301E56001) | CY | 8 | $661.00 | $560.00 | $800.00 | $1,100.00 |
| 35 | Aggregate base (304E20000) | CY | 6.30 | $481.00 | $220.00 | $250.00 | $300.00 |
| 36 | Tack coat (407E10000) | GAL | 25 | $33.00 | $4.00 | $15.00 | $5.00 |
| 37 | Prime coat, as per plan (408E10001) | GAL | 51.10 | $30.00 | $5.00 | $25.00 | $12.00 |
| 38 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 17.40 | $445.00 | $680.00 | $850.00 | $1,300.00 |
| 39 | Compacted aggregate (617E10100) | CY | 21.30 | $200.00 | $180.00 | $150.00 | $200.00 |
| 40 | Barrier reflector, type 2 (1WAY) (626E00110) | EACH | 8 | $17.00 | $15.00 | $15.00 | $15.00 |
| 41 | Edge line, 6", type 1 (642E00104) | MI | 0.40 | $2,700.00 | $2,500.00 | $2,600.00 | $2,500.00 |
| 42 | Center line, type 1 (642E00300) | MI | 0.20 | $4,700.00 | $4,300.00 | $4,500.00 | $4,300.00 |
| 43 | Detour signing (614E12420) | LS | 1 | $5,500.00 | $6,000.00 | $5,200.00 | $6,000.00 |
| 44 | Portable changeable message sign (614E18600) | SNMT | 6 | $891.00 | $950.00 | $800.00 | $900.00 |
| 45 | Steel piles, misc.: W16X57 furnished (507E00400) | FT | 1,740.50 | $52.00 | $50.00 | $50.00 | $53.00 |
| 46 | Concrete, misc.: precast concrete lagging (511E81300) | EACH | 1 | $3,000.00 | $3,500.00 | $3,000.00 | $3,000.00 |
| 47 | Drilled shafts, 24" diameter, above bedrock, as per plan (524E94503) | FT | 1,770 | $49.60 | $55.00 | $80.00 | $77.00 |
| 48 | Drilled shafts, misc.: plug pile, 30" diameter, UN (524E95000) | FT | 580 | $82.90 | $71.00 | $90.00 | $108.00 |
| 49 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,000.00 | $5,000.00 | $5,500.00 | $14,000 |
| 50 | Maintaining traffic (614E11000) | LS | 1 | $3,250.00 | $4,800.00 | $3,000.00 | $5,000.00 |
| 51 | Field office, type B (619E16010) | MNTH | 3 | $2,250.00 | $1,500.00 | $1,250.00 | $1,700.00 |
| 52 | Construction layout stakes and surveying (623E10000) | LS | 1 | $800.00 | $18,000 | $6,000.00 | $7,000.00 |
| 53 | Mobilization (624E10000) | LS | 1 | $12,500 | $25,000 | $18,000 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.