ODOT letting results, June 16, 2022

25 contracts let by Ohio DOT on June 16, 2022, $33,365,653 in low bids, a median of 2 bidders per contract. On the 25 with an engineer's estimate, the low bid came in under it 12 times; median low bid +1.0% against the estimate.

Owner
Ohio DOT
Contracts
25
Low bids, total
$33,365,653
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
220375MOT-W Springfield St Recon (MINOR RECONSTRUCTION)MOT4Brumbaugh Construction Inc$4,080,840$4,297,487+5.0%+11%ODOT
220374MEG-US 33-10.72 (FOUR LANE RESURFACING)MEG1Shelly Company$3,624,876+2.0%ODOT
220385D11-PM-FY2023(B) (PAVEMENT MARKING)District 112The Aero-Mark Company LLC$2,662,262$3,089,465+16%+39%ODOT
220387FRA-IR 270/IR 70-SP FY23 CONCRETE (SPOT PATCHING / PAVEMENT REPAIR)FRA2Perk Company Inc$2,546,977$2,815,482+11%+8.0%ODOT
220370ERI-/LOR-MICRO FY2023 (MICROSURFACING)ERI2Strawser Construction Inc$2,412,700$2,641,696+9.0%+23%ODOT
220377PAU-US 24-13.52 (SLIDE REPAIR)PAU4Miller Bros Const Inc$2,153,179$2,182,233+1.0%-1.0%ODOT
220350MOT-IR 75-VAR (SIGNALIZATION)MOT4Perram Electric Inc$1,897,150$2,248,287+19%+3.0%ODOT
220382CRA-/RIC-CHIP FY2023 (CHIP SEAL)CRA2Henry W Bergman Inc$1,689,945$1,800,187+7.0%+28%ODOT
220388FRA-GR FY23 (GUARDRAIL REBUILDING)FRA2M P Dory Co$1,497,879$1,672,975+12%-14%ODOT
220352ROS-SR 772-06.31 (TWO LANE RESURFACING)ROS2Shelly & Sands Inc$1,283,637$1,326,484+3.0%-3.0%ODOT
220383D05-SP FY2023 (SPOT PATCHING / PAVEMENT REPAIR)District 52Shelly Company$1,113,711$1,133,466+2.0%-21%ODOT
220372HAM-IR 74-11.20 (SPOT PATCHING / PAVEMENT REPAIR)HAM2Barrett Paving Materials Inc$1,098,590$1,801,136+64%-3.0%ODOT
220379BEL-SR 149-08.15 (PART 1 AND PART 2) (SLIDE REPAIR)BEL4Ohio-West Virginia Excavating Co$1,078,236$1,176,999+9.0%-7.0%ODOT
220368COL-SR 170-11.42 (TWO LANE RESURFACING)COL4Shelly Company$1,062,054$1,259,882+19%+11%ODOT
220367BEL-CR 4-23.62/25.79 (SLIDE REPAIR)BEL3Shelly & Sands Inc$731,923$732,2390.0%+34%ODOT
220386FRA-Litter/Mow FY23 (MOWING)FRA2Bladecutters Inc$632,111$720,816+14%+47%ODOT
220384D06-GR FY23 (GUARDRAIL REBUILDING)District 62Lake Erie Construction Company$581,675$697,995+20%-10%ODOT
220391TUS-IR 77-31.54 (PARKING AREAS)TUS3Shelly & Sands Inc$556,161$640,655+15%-11%ODOT
220389HAS-SR 519-06.38 (MINOR RECONSTRUCTION)HAS3Ohio-West Virginia Excavating Co$509,178$661,821+30%-6.0%ODOT
220371HAM-SR 128-05.70 (TWO LANE RESURFACING)HAM2Barrett Paving Materials Inc$476,964$483,438+1.0%+19%ODOT
220373LIC-SR 310-09.88 (CULVERT REPLACEMENT)LIC4Buds Inc$423,341$494,124+17%+1.0%ODOT
220380BEL-US 250-04.49 (SLIDE REPAIR)BEL4Alan Stone Co Inc$353,149$361,279+2.0%-3.0%ODOT
220390HAS-US 22-01.86 (SLIDE REPAIR)HAS5Ohio-West Virginia Excavating Co$332,293$343,079+3.0%-19%ODOT
220376OTT-SR 269-04.55 Culvert (CULVERT REPLACEMENT)OTT2Great Lakes Demolition Company$294,598$383,441+30%+3.0%ODOT
220381BEL-US 250-08.10 (SLIDE REPAIR)BEL5Dennison Bridge Inc$272,224$296,280+9.0%-11%ODOT
ODOT contracts let on June 16, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy